2nd of 2 from Arunachal Pradesh
Allocated limit
₹9.81 Cr
Median ₹8.60 Cr
Fund utilisation
100%
₹9.78 Cr recommended · 133 works
About the median
Paid to vendors
₹9.73 Cr
99% of allocation
Above median (88%)
Works completed
128
96% of recommended
Above median (83%)
From recommendation to completion
Every work this MP recommended, by stage
- Recommended by the MP133 works
₹9.78 Cr · 100% of the ₹9.81 Cr allocated
- Sanctioned by the district133 works
100% sanctioned · took 2.6 months on average (due within 45 days)
- Completed128 works
₹9.45 Cr final cost · 5.1 months from recommendation on average
In plain words
What the numbers say
- Recommended 133 works worth ₹9.78 Cr, a fund utilisation of 100%, higher than 72% of 17th Lok Sabha MPs.
- The district has sanctioned 133 of them, taking 2.6 months on average.
- ₹9.73 Cr has been paid to vendors, 99% of the allocation.
- 128 works are complete, typically 5.1 months after recommendation. 80 works have geo-tagged photos on eSAKSHI.
- The largest share of funds went to Roads & bridges.
- Payments went to 102 vendors. The largest received 9.1%.
- No citizen ratings have been reported for completed works.
How the score is made
MP score 93/100: finishing works counts most
- Works completed 30%96Completed ÷ recommended works.
- Spending efficiency 20%97Value of completed works ÷ money paid out. Money paid without works finished scores low.
- Fund utilisation 15%100Value of works recommended ÷ allocated limit (MoSPI’s measure).
- Proof of work 15%63Share of completed works with photos or documents uploaded on eSAKSHI.
- Funds spent 10%99Paid to vendors ÷ allocated limit.
- Vendor diversity 10%100How spread out payments are: full marks when no vendor gets over 20% of the money, none when one vendor gets everything.
i
Members of Parliament (MPs) do not have direct, operational control over the specific vendors selected for government public works. However, they exert significant indirect influence by shaping procurement frameworks, passing supplier diversity laws, and conducting oversight.
Largest vendor: MS NT ENTERPRISE, 9.1% of payments across 102 vendors.
District sanction speed
95/100 · sanction is the district authority’s job, so this doesn’t change the MP’s rank
- Sanction speed 100%95Average days to sanction (full marks within the 45-day guideline, none at a year), and the share of works not overdue.
Activity over time
Recommendations, payments and completions by month
Sectors
Value of works by category
Who got paid
Top vendors by payments received
Implementing district authorities
The districts that sanction and execute this MP’s works
Works
133 works · the 60 most recent are listed here, all of them in the explorer · tap “Photos” to see geo-tagged photos from eSAKSHI
Flood protection work at Kharsang River in Miao, Changlang District
Irrigation, flood & environmentConstruction of flood control embankments/protection walls along riverbanks, hilltops, roadsides· Changlang· #64814
₹10.0 L Completed 21 Jun 2025Rec. 18 Dec 2023Paid ₹10.0 LC/o Kitchen at Asali destitute center in Lower Dibang Valley District
Community buildings & public spacesSetting up of kitchen and pantries· Lower Dibang Valley· #66701
₹5.0 L Completed 24 Mar 2025Rec. 20 Dec 2023Paid ₹5.0 LC/o Kitchen at Destitute Centre, Gamgu, Roing in Lower Dibang Valley District
Community buildings & public spacesSetting up of kitchen and pantries· Lower Dibang Valley· #66367
₹10.0 L Completed 13 Mar 2025Rec. 20 Dec 2023Paid ₹10.0 LC/o Community Hall at Chaglagam in Anjaw District
Community buildings & public spacesConstruction of community centers and community halls· Anjaw· #66204
₹15.0 L Completed 25 Feb 2025Rec. 20 Dec 2023Paid ₹15.0 LC/o Boundary wall at Central Gangging complex Pasighat in East Siang District under PHED
Community buildings & public spacesConstruction of boundary walls of existing public and community buildings· East Siang· #63648
₹20.0 L Completed 21 Dec 2024Rec. 16 Dec 2023Paid ₹20.0 LC/o RLR from NH-13 to Bokar WRC area under Koreng Village, Pangin in Siang District
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Siang· #64450
₹5.0 L Completed 6 Dec 2024Rec. 18 Dec 2023Paid ₹5.0 LC/o View point at Mechong Village under Hawai-Walong in Anjaw District
Community buildings & public spacesDevelopment of public parks· Anjaw· #66205
₹8.0 L Completed 26 Nov 2024Rec. 20 Dec 2023Paid ₹8.0 LC/o MIC at Barap Nallah, Hatongchu Village in Changlang District
Irrigation, flood & environmentEstablishing public lift irrigation projects· Changlang· #66109
₹5.0 L Completed 10 Sept 2024Rec. 20 Dec 2023Paid ₹5.0 LC/o Toilet at GPS Komsing Komku in Siang District under PWD
Sanitation & drainageConstruction of toilet blocks· Siang· #63018
₹5.0 L Completed 23 Aug 2024Rec. 15 Dec 2023Paid ₹5.0 LFlood Protection work at Komsing Karo in Siang District under PWD
Irrigation, flood & environmentConstruction of flood control embankments/protection walls along riverbanks, hilltops, roadsides· Siang· #63019
₹5.0 L Completed 23 Aug 2024Rec. 15 Dec 2023Paid ₹5.0 LC/o CC Steps from highway to Koreng Village, Pangin in Siang District
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Siang· #64427
₹5.0 L Completed 23 Aug 2024Rec. 18 Dec 2023Paid ₹5.0 LC/o Link road from Poying to Liko area in Riew Village in Siang District
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Siang· #66310
₹8.0 L Completed 23 Aug 2024Rec. 20 Dec 2023Paid ₹8.0 LC/o MIC at Dibok in Pareng Village, Siang Village
Irrigation, flood & environmentEstablishing public lift irrigation projects· Siang· #66311
₹5.0 L Completed 23 Aug 2024Rec. 20 Dec 2023Paid ₹5.0 LC/o MIC at Modi WRC area in Pangkang Jorkong village in Siang District
Irrigation, flood & environmentConstruction of public irrigation facilities· Siang· #66312
₹8.0 L Completed 23 Aug 2024Rec. 20 Dec 2023Paid ₹8.0 LC/o Retaining Wall at Pangin Village in Siang District
Community buildings & public spacesConstruction of boundary walls of existing public and community buildings· Siang· #66314
₹8.0 L Completed 23 Aug 2024Rec. 20 Dec 2023Paid ₹8.0 L
17th Lok Sabha MPs from Arunachal Pradesh
Ranked by MP score
| # | MP | Utilisation | Spent | Completed | Score |
|---|---|---|---|---|---|
| 1 | Kiren Rijiju · Arunachal West | 99% | 97% | 199 | 94 |
| 2 | Shri Tapir Gao · Arunachal East | 100% | 99% | 128 | 93 |
Source: MoSPI eSAKSHI (eSAKSHI API (mplads.mospi.gov.in)). Fund utilisation = works recommended ÷ allocated limit (MoSPI’s definition); spent = vendor payments ÷ allocated limit; completion = completed ÷ recommended works. The MP score weighs completion, spending efficiency, utilisation, proof of work, spending and vendor diversity. How it’s calculated.