Skip to content
MPLADSTracker
This is a record from the 17th Lok Sabha (2019–24). eSAKSHI covers its final year only, from April 2023. Comparisons are with other 17th Lok Sabha MPs.

MPLADS report card · 17th Lok Sabha

Kiren Rijiju

Lok SabhaArunachal West · Arunachal Pradesh

MP score94/10093rd of 539 in the 17th Lok Sabha
1st of 2 from Arunachal Pradesh
Re-elected to the 18th Lok Sabha Then: 81% utilisation, 126 works completed, score 80.

Allocated limit

₹9.81 Cr

Median ₹8.60 Cr

Fund utilisation

99%

₹9.74 Cr recommended · 204 works
About the median

Paid to vendors

₹9.53 Cr

97% of allocation
Above median (88%)

Works completed

199

98% of recommended
Above median (83%)

From recommendation to completion

Every work this MP recommended, by stage

  1. Recommended by the MP204 works

    ₹9.74 Cr · 99% of the ₹9.81 Cr allocated

  2. Sanctioned by the district202 works

    99% sanctioned · took 3.9 months on average (due within 45 days)

  3. Completed199 works

    ₹9.53 Cr final cost · 9.1 months from recommendation on average

2 works are still awaiting sanction, 2 of them for more than 45 days.

In plain words

What the numbers say

  • Recommended 204 works worth ₹9.74 Cr, a fund utilisation of 99%, higher than 65% of 17th Lok Sabha MPs.
  • The district has sanctioned 202 of them, taking 3.9 months on average.
  • ₹9.53 Cr has been paid to vendors, 97% of the allocation.
  • 199 works are complete, typically 9.1 months after recommendation. 129 works have geo-tagged photos on eSAKSHI.
  • The largest share of funds went to Community buildings & public spaces.
  • Payments went to 153 vendors. The largest received 5.2%.
  • No citizen ratings have been reported for completed works.

How the score is made

MP score 94/100: finishing works counts most

  1. Works completed 30%98Completed ÷ recommended works.
  2. Spending efficiency 20%100Value of completed works ÷ money paid out. Money paid without works finished scores low.
  3. Fund utilisation 15%99Value of works recommended ÷ allocated limit (MoSPI’s measure).
  4. Proof of work 15%65Share of completed works with photos or documents uploaded on eSAKSHI.
  5. Funds spent 10%97Paid to vendors ÷ allocated limit.
  6. Vendor diversity 10%
    i

    Members of Parliament (MPs) do not have direct, operational control over the specific vendors selected for government public works. However, they exert significant indirect influence by shaping procurement frameworks, passing supplier diversity laws, and conducting oversight.

    100
    How spread out payments are: full marks when no vendor gets over 20% of the money, none when one vendor gets everything.

Largest vendor: Shri Liyi Geyi, 5.2% of payments across 153 vendors.

District sanction speed

88/100 · sanction is the district authority’s job, so this doesn’t change the MP’s rank

  1. Sanction speed 100%88Average days to sanction (full marks within the 45-day guideline, none at a year), and the share of works not overdue.

Activity over time

Recommendations, payments and completions by month

Value of works MPs recommended each month

Who got paid

Top vendors by payments received

Implementing district authorities

The districts that sanction and execute this MP’s works

Works

204 works · the 60 most recent are listed here, all of them in the explorer · tap “Photos” to see geo-tagged photos from eSAKSHI

Open in explorer
  • Construction of CC Footpath from NH415 road near Toyota car dealer to Sangrik Putung Primary Schoole around 500mtrs at Itanagar

    Roads & bridgesConstruction of footpaths and pedestrian ways· Papum Pare· #67820

    ₹3.0 L Completed 26 Feb 2026Rec. 22 Dec 2023Paid ₹3.0 L
  • Construction of Bore well at the residence of Shri Tadar Towmin Jullang Itanagar

    Drinking waterInstalling tube-wells and borewells· Papum Pare· #67821

    ₹5.0 L Completed 26 Feb 2026Rec. 22 Dec 2023Paid ₹5.0 L
  • Construction of Drainage at H sector Itanagar

    Sanitation & drainageProviding drains and gutters for public drainage· Papum Pare· #67824

    ₹3.0 L Completed 26 Feb 2026Rec. 22 Dec 2023Paid ₹3.0 L
  • Construction of Retaining wall at Gohpur Tinali Itanagar

    Community buildings & public spacesConstruction of boundary walls of existing public and community buildings· Papum Pare· #67825

    ₹3.0 L Completed 26 Feb 2026Rec. 22 Dec 2023Paid ₹3.0 L
  • Construction of Drainage near Sanghey Lhaden Sports Academy Chimpu Itanagar

    Sanitation & drainageProviding drains and gutters for public drainage· Papum Pare· #67826

    ₹3.0 L Completed 26 Feb 2026Rec. 22 Dec 2023Paid ₹3.0 L
  • Construction of Drainage System at Chimpu Itanagar

    Sanitation & drainageProviding drains and gutters for public drainage· Papum Pare· #67828

    ₹5.0 L Completed 26 Feb 2026Rec. 22 Dec 2023Paid ₹5.0 L
  • Construction of RCC Retaining wall at Gohpur Tinali opposite SBI ATM SIB gate Itanagar

    Community buildings & public spacesConstruction of boundary walls of existing public and community buildings· Papum Pare· #67835

    ₹8.0 L Completed 26 Feb 2026Rec. 22 Dec 2023Paid ₹8.0 L
  • Construction of Approach Road from Panchali to Yayang Residence Itanagar

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Papum Pare· #67836

    ₹10.0 L Completed 26 Feb 2026Rec. 22 Dec 2023Paid ₹10.0 L
  • CONSTRUCTION OF RCC Storm Drainage with Culvert at Hakap village near cluster farm

    Sanitation & drainageProviding drains and gutters for public drainage· Papum Pare· #67837

    ₹3.0 L Completed 26 Feb 2026Rec. 22 Dec 2023Paid ₹3.0 L
  • CONSTRUCTION OF Flood protection wall at Lobi Kola Camp Itanagar

    Irrigation, flood & environmentConstruction of flood control embankments/protection walls along riverbanks, hilltops, roadsides· Papum Pare· #67838

    ₹8.0 L Completed 26 Feb 2026Rec. 22 Dec 2023Paid ₹8.0 L
  • Construction of Boundary wall at Chimi under Ganga Village Itanagar

    Community buildings & public spacesConstruction of boundary walls of existing public and community buildings· Papum Pare· #68053

    ₹3.0 L Completed 26 Feb 2026Rec. 22 Dec 2023Paid ₹3.0 L
  • Construction of CC Drain at back side of Sidhartha hall Itanagar

    Sanitation & drainageProviding drains and gutters for public drainage· Papum Pare· #68115

    ₹5.0 L Completed 26 Feb 2026Rec. 22 Dec 2023Paid ₹5.0 L
  • Construction of Boundary wall behind river side under Birup Village near Sangey Laden Academy Chimpu Itanagar

    Community buildings & public spacesConstruction of boundary walls of existing public and community buildings· Papum Pare· #68118

    ₹5.0 L Completed 26 Feb 2026Rec. 22 Dec 2023Paid ₹5.0 L
  • Construction of Boundary wall at Birup Colony Itanagar

    Community buildings & public spacesConstruction of boundary walls of existing public and community buildings· Papum Pare· #82100

    ₹5.0 L Completed 26 Feb 2026Rec. 15 Jan 2024Paid ₹5.0 L
  • Construction of RCC Retaining wall near Baptist Church Nyokum Lapang Itanagar

    Community buildings & public spacesConstruction of boundary walls of existing public and community buildings· Papum Pare· #88201

    ₹20.0 L Completed 26 Feb 2026Rec. 24 Jan 2024Paid ₹20.0 L

17th Lok Sabha MPs from Arunachal Pradesh

Ranked by MP score

#MPUtilisationSpentCompletedScore
1Kiren Rijiju · Arunachal West99%97%19994
2Shri Tapir Gao · Arunachal East100%99%12893

Source: MoSPI eSAKSHI (eSAKSHI API (mplads.mospi.gov.in)). Fund utilisation = works recommended ÷ allocated limit (MoSPI’s definition); spent = vendor payments ÷ allocated limit; completion = completed ÷ recommended works. The MP score weighs completion, spending efficiency, utilisation, proof of work, spending and vendor diversity. How it’s calculated.