MPLADS report card · 18th Lok Sabha

Shri Tapir Gao

Lok SabhaBJPArunachal East · Arunachal Pradesh

MP score75/10041st of 542 in the 18th Lok Sabha
2nd of 2 from Arunachal Pradesh
Also an MP in the 17th Lok Sabha Then: 100% utilisation, 128 works completed, score 93.

Allocated limit

₹14.70 Cr

Median ₹14.70 Cr

Fund utilisation

100%

₹14.67 Cr recommended · 191 works
Above median (76%)

Paid to vendors

₹10.37 Cr

71% of allocation
Above median (37%)

Works completed

107

56% of recommended
Above median (28%)

From recommendation to completion

Every work this MP recommended, by stage

  1. Recommended by the MP191 works

    ₹14.67 Cr · 100% of the ₹14.70 Cr allocated

  2. Sanctioned by the district146 works

    76% sanctioned · took 3.1 months on average (due within 45 days)

  3. Completed107 works

    ₹9.51 Cr final cost · 4.8 months from recommendation on average

45 works are still awaiting sanction, 45 of them for more than 45 days.

In plain words

What the numbers say

  • Recommended 191 works worth ₹14.67 Cr, a fund utilisation of 100%, higher than 97% of 18th Lok Sabha MPs.
  • The district has sanctioned 146 of them, taking 3.1 months on average.
  • ₹10.37 Cr has been paid to vendors, 71% of the allocation.
  • 107 works are complete, typically 4.8 months after recommendation. 60 works have geo-tagged photos on eSAKSHI.
  • The largest share of funds went to Roads & bridges.
  • Payments went to 121 vendors. The largest received 10%.
  • No citizen ratings have been reported for completed works.

How the score is made

MP score 75/100: finishing works counts most

  1. Works completed 30%56Completed ÷ recommended works.
  2. Spending efficiency 20%92Value of completed works ÷ money paid out. Money paid without works finished scores low.
  3. Fund utilisation 15%100Value of works recommended ÷ allocated limit (MoSPI’s measure).
  4. Proof of work 15%52Share of completed works with photos or documents uploaded on eSAKSHI.
  5. Funds spent 10%71Paid to vendors ÷ allocated limit.
  6. Vendor diversity 10%
    i

    Members of Parliament (MPs) do not have direct, operational control over the specific vendors selected for government public works. However, they exert significant indirect influence by shaping procurement frameworks, passing supplier diversity laws, and conducting oversight.

    100
    How spread out payments are: full marks when no vendor gets over 20% of the money, none when one vendor gets everything.

Largest vendor: BKM Enterprises, 10% of payments across 121 vendors.

District sanction speed

81/100 · sanction is the district authority’s job, so this doesn’t change the MP’s rank

  1. Sanction speed 100%81Average days to sanction (full marks within the 45-day guideline, none at a year), and the share of works not overdue.

Activity over time

Recommendations, payments and completions by month

Value of works MPs recommended each month

Who got paid

Top vendors by payments received

Implementing district authorities

The districts that sanction and execute this MP’s works

Works

195 works · the 60 most recent are listed here, all of them in the explorer · tap “Photos” to see geo-tagged photos from eSAKSHI

Open in explorer
  • Flood Protection work at Sido Village in East Siang District

    Irrigation, flood & environmentConstruction of flood control embankments/protection walls along riverbanks, hilltops, roadsides· East Siang· #296437

    ₹4.0 L Sanctioned · 30 Oct 2026Rec. 18 Jul 2026
  • Flood control work at Hite WRC area, Ledum in East Siang District

    Irrigation, flood & environmentConstruction of flood control embankments/protection walls along riverbanks, hilltops, roadsides· East Siang· #304254

    ₹4.0 L Sanctioned · 30 Oct 2026Rec. 16 Aug 2026
  • Construction of Drain at Rayang Village in East Siang District

    Irrigation, flood & environmentConstruction of flood control embankments/protection walls along riverbanks, hilltops, roadsides· East Siang· #304393

    ₹6.0 L Sanctioned · 30 Oct 2026Rec. 16 Aug 2026
  • Construction of MIC at Gorang agri area at Ngopok Village in East Siang District

    Irrigation, flood & environmentConstruction of public irrigation facilities· East Siang· #314675

    ₹3.0 L Sanctioned · 30 Oct 2026Rec. 13 Sep 2026
  • Construction of Fence wall at Yabe area, Remi Village in East Siang District

    Community buildings & public spacesConstruction of boundary walls of existing public and community buildings· East Siang· #296395

    ₹6.0 L Time Estimation · 29 Oct 2026Rec. 18 Jul 2026
  • Construction of MIC at Peneng WRC area, Bilat Village in East Siang District

    Irrigation, flood & environmentEstablishing public lift irrigation projects· East Siang· #296396

    ₹5.0 L Work partially Completed · 29 Oct 2026Rec. 18 Jul 2026
  • Construction of Link Road at Danang area, Remi Village in East Siang District

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· East Siang· #296398

    ₹4.0 L Work partially Completed · 29 Oct 2026Rec. 18 Jul 2026
  • Construction of Culvert at Latu Rikmeng Nallah, Mirem Village in East Siang District

    Roads & bridgesConstruction of culverts and bridges· East Siang· #296405

    ₹10.0 L Work partially Completed · 29 Oct 2026Rec. 18 Jul 2026
  • Flood Protection work to protect Tanyo WRC area, Bamin-Bilat in East Siang District

    Irrigation, flood & environmentConstruction of flood control embankments/protection walls along riverbanks, hilltops, roadsides· East Siang· #296406

    ₹4.0 L Work partially Completed · 29 Oct 2026Rec. 18 Jul 2026
  • Construction of MIC at Yabe cultivation area, Miglung Village in East Siang District

    Irrigation, flood & environmentEstablishing public lift irrigation projects· East Siang· #296409

    ₹5.0 L Work partially Completed · 29 Oct 2026Rec. 18 Jul 2026
  • Construction of fence wall at Depi Village in East Siang District

    Community buildings & public spacesConstruction of boundary walls of existing public and community buildings· East Siang· #296416

    ₹4.0 L Work partially Completed · 29 Oct 2026Rec. 18 Jul 2026
  • Construction of Link Road at 10th Mile, Oyan in East Siang District

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· East Siang· #304252

    ₹8.0 L Work partially Completed · 29 Oct 2026Rec. 16 Aug 2026
  • Construction of RLR at Oyan Village in East Siang District

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· East Siang· #314661

    ₹5.0 L Work partially Completed · 29 Oct 2026Rec. 13 Sep 2026
  • Construction of Approach Road from Suka Nallah to Rajer Kheti in Lohit District

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Lohit· #304251

    ₹7.0 L Sanctioned · 28 Oct 2026Rec. 16 Aug 2026
  • Construction of fence wall near Gangging at Kapong Village, Mengkeng Miri in Namsai District

    Community buildings & public spacesConstruction of boundary walls of existing public and community buildings· Namsai· #314689

    ₹3.0 L Sanctioned · 22 Oct 2026Rec. 13 Sep 2026

18th Lok Sabha MPs from Arunachal Pradesh

Ranked by MP score

Compare
#MPUtilisationSpentCompletedScore
1Kiren Rijiju · Arunachal West81%62%12680
2Shri Tapir Gao · Arunachal East100%71%10775

Source: MoSPI eSAKSHI (eSAKSHI API (mplads.mospi.gov.in)). Fund utilisation = works recommended ÷ allocated limit (MoSPI’s definition); spent = vendor payments ÷ allocated limit; completion = completed ÷ recommended works. The MP score weighs completion, spending efficiency, utilisation, proof of work, spending and vendor diversity. How it’s calculated.