Allocated limit
₹14.70 Cr
Median ₹14.70 Cr
Fund utilisation
81%
₹11.96 Cr recommended · 175 works
Above median (76%)
Paid to vendors
₹9.14 Cr
62% of allocation
Above median (37%)
Works completed
126
72% of recommended
Above median (28%)
From recommendation to completion
Every work this MP recommended, by stage
- Recommended by the MP175 works
₹11.96 Cr · 81% of the ₹14.70 Cr allocated
- Sanctioned by the district131 works
75% sanctioned · took 2.8 months on average (due within 45 days)
- Completed126 works
₹8.89 Cr final cost · 4.0 months from recommendation on average
44 works are still awaiting sanction.
In plain words
What the numbers say
- Recommended 175 works worth ₹11.96 Cr, a fund utilisation of 81%, higher than 59% of 18th Lok Sabha MPs.
- The district has sanctioned 131 of them, taking 2.8 months on average.
- ₹9.14 Cr has been paid to vendors, 62% of the allocation.
- 126 works are complete, typically 4.0 months after recommendation. 91 works have geo-tagged photos on eSAKSHI.
- The largest share of funds went to Roads & bridges.
- Payments went to 94 vendors. The largest received 5.8%.
- No citizen ratings have been reported for completed works.
How the score is made
MP score 80/100: finishing works counts most
- Works completed 30%72Completed ÷ recommended works.
- Spending efficiency 20%97Value of completed works ÷ money paid out. Money paid without works finished scores low.
- Fund utilisation 15%81Value of works recommended ÷ allocated limit (MoSPI’s measure).
- Proof of work 15%72Share of completed works with photos or documents uploaded on eSAKSHI.
- Funds spent 10%62Paid to vendors ÷ allocated limit.
- Vendor diversity 10%100How spread out payments are: full marks when no vendor gets over 20% of the money, none when one vendor gets everything.
i
Members of Parliament (MPs) do not have direct, operational control over the specific vendors selected for government public works. However, they exert significant indirect influence by shaping procurement frameworks, passing supplier diversity laws, and conducting oversight.
Largest vendor: Ms Mohnio Enterprises, 5.8% of payments across 94 vendors.
District sanction speed
93/100 · sanction is the district authority’s job, so this doesn’t change the MP’s rank
- Sanction speed 100%93Average days to sanction (full marks within the 45-day guideline, none at a year), and the share of works not overdue.
Activity over time
Recommendations, payments and completions by month
Sectors
Value of works by category
Who got paid
Top vendors by payments received
Implementing district authorities
The districts that sanction and execute this MP’s works
Works
175 works · the 60 most recent are listed here, all of them in the explorer · tap “Photos” to see geo-tagged photos from eSAKSHI
C/o Retaining Wall at Phomang Village under Lumla Circle.
Irrigation, flood & environmentConstruction of flood control embankments/protection walls along riverbanks, hilltops, roadsides· Tawang· #325349
₹5.0 L Awaiting sanction · 1 daysRec. 31 Oct 2026Maintenance of Water Supply at PHC Singchung HQ.
Drinking waterConstruction of water tanks· West Kameng· #325350
₹7.0 L Awaiting sanction · 1 daysRec. 31 Oct 2026C/o Protection Wall for Agricultural Field at Hara Yangfo, Hayawa.
Irrigation, flood & environmentConstruction of flood control embankments/protection walls along riverbanks, hilltops, roadsides· East Kameng· #325351
₹5.0 L Awaiting sanction · 1 daysRec. 31 Oct 2026C/o Drainage work at New Seppa near Tari Bridge, Lochung Yangse Village, Pakoti Circle.
Sanitation & drainageProviding drains and gutters for public drainage· East Kameng· #325352
₹5.0 L Awaiting sanction · 1 daysRec. 31 Oct 2026Repair of Harish Tok Water Canal.
Irrigation, flood & environmentConstruction of public irrigation facilities· Pakke Kessang· #325353
₹5.0 L Awaiting sanction · 1 daysRec. 31 Oct 2026C/o Culvert at Ajing Putung, Mogli Pop, Ganga Village, Itanagar, RWD Itanagar Division.
Roads & bridgesConstruction of culverts and bridges· Papum Pare· #325354
₹5.0 L Awaiting sanction · 1 daysRec. 31 Oct 2026C/o Retaining Wall at Lower Chimi Village near the residence of Techi Nyabo, Ganga Village, Itanagar.
Irrigation, flood & environmentConstruction of flood control embankments/protection walls along riverbanks, hilltops, roadsides· Papum Pare· #325355
₹5.0 L Awaiting sanction · 1 daysRec. 31 Oct 2026General Infrastructure Upgradation and Improvement Measures at Nyokum Namlo, Itanagar under CSD-6/A.
Community buildings & public spacesConstruction of buildings for community cultural activities· Papum Pare· #325356
₹15.0 L Awaiting sanction · 1 daysRec. 31 Oct 2026C/o Terrain Retaining Wall at Pagmar Point, Donyi Polo, Itanagar under CSD-6/A.
Irrigation, flood & environmentConstruction of flood control embankments/protection walls along riverbanks, hilltops, roadsides· Papum Pare· #325357
₹5.0 L Awaiting sanction · 1 daysRec. 31 Oct 2026C/o Retaining Wall for Bachelors Barrack near Cow Farm, Nirjuli.
Irrigation, flood & environmentConstruction of flood control embankments/protection walls along riverbanks, hilltops, roadsides· Papum Pare· #325358
₹5.0 L Awaiting sanction · 1 daysRec. 31 Oct 2026C/o RCC Protection Wall at Upper Tapik colony near Kharsingsa Baptist Church to protect colony LT Line and Power Transformer, Banderdewa Circle.
Irrigation, flood & environmentConstruction of flood control embankments/protection walls along riverbanks, hilltops, roadsides· Papum Pare· #325359
₹5.0 L Awaiting sanction · 1 daysRec. 31 Oct 2026C/o Protection Wall for Flood Control at Upper Tapik Colony at Kharsingsha.
Irrigation, flood & environmentConstruction of flood control embankments/protection walls along riverbanks, hilltops, roadsides· Papum Pare· #325360
₹8.0 L Awaiting sanction · 1 daysRec. 31 Oct 2026C/o Protection Wall at Jullang, Gomi River near TR residence.
Irrigation, flood & environmentConstruction of flood control embankments/protection walls along riverbanks, hilltops, roadsides· Papum Pare· #325361
₹5.0 L Awaiting sanction · 1 daysRec. 31 Oct 2026C/o Retaining Wall at Rakap Stream near Residence of N. Jamja, Lower Rakap Colony, Naharlagun.
Irrigation, flood & environmentConstruction of flood control embankments/protection walls along riverbanks, hilltops, roadsides· Papum Pare· #325362
₹5.0 L Awaiting sanction · 1 daysRec. 31 Oct 2026C/o Protection Wall at Jullang Nallah near ISBT, Lekhi Village, WRD.
Irrigation, flood & environmentConstruction of flood control embankments/protection walls along riverbanks, hilltops, roadsides· Papum Pare· #325363
₹5.0 L Awaiting sanction · 1 daysRec. 31 Oct 2026
18th Lok Sabha MPs from Arunachal Pradesh
Ranked by MP score
| # | MP | Utilisation | Spent | Completed | Score |
|---|---|---|---|---|---|
| 1 | Kiren Rijiju · Arunachal West | 81% | 62% | 126 | 80 |
| 2 | Shri Tapir Gao · Arunachal East | 100% | 71% | 107 | 75 |
Source: MoSPI eSAKSHI (eSAKSHI API (mplads.mospi.gov.in)). Fund utilisation = works recommended ÷ allocated limit (MoSPI’s definition); spent = vendor payments ÷ allocated limit; completion = completed ÷ recommended works. The MP score weighs completion, spending efficiency, utilisation, proof of work, spending and vendor diversity. How it’s calculated.