Skip to content
MPLADSTracker
This is a record from the 17th Lok Sabha (2019–24). eSAKSHI covers its final year only, from April 2023. Comparisons are with other 17th Lok Sabha MPs.

MPLADS report card · 17th Lok Sabha

Shri Shantanu Thakur

Lok SabhaSC seatBangaon · West Bengal

MP score94/10085th of 539 in the 17th Lok Sabha
15th of 42 from West Bengal
Re-elected to the 18th Lok Sabha Then: 72% utilisation, 8 works completed, score 54.

Allocated limit

₹9.78 Cr

Median ₹8.60 Cr

Fund utilisation

100%

₹9.78 Cr recommended · 41 works
About the median

Paid to vendors

₹9.28 Cr

95% of allocation
Above median (88%)

Works completed

36

88% of recommended
Above median (83%)

From recommendation to completion

Every work this MP recommended, by stage

  1. Recommended by the MP41 works

    ₹9.78 Cr · 100% of the ₹9.78 Cr allocated

  2. Sanctioned by the district41 works

    100% sanctioned · took 2.3 months on average (due within 45 days)

  3. Completed36 works

    ₹8.62 Cr final cost · 24.8 months from recommendation on average

In plain words

What the numbers say

  • Recommended 41 works worth ₹9.78 Cr, a fund utilisation of 100%, higher than 87% of 17th Lok Sabha MPs.
  • The district has sanctioned 41 of them, taking 2.3 months on average.
  • ₹9.28 Cr has been paid to vendors, 95% of the allocation.
  • 36 works are complete, typically 24.8 months after recommendation. 36 works have geo-tagged photos on eSAKSHI.
  • The largest share of funds went to Electricity & lighting.
  • Payments went to 14 vendors. The largest received 24%.
  • No citizen ratings have been reported for completed works.

How the score is made

MP score 94/100: finishing works counts most

  1. Works completed 30%88Completed ÷ recommended works.
  2. Spending efficiency 20%93Value of completed works ÷ money paid out. Money paid without works finished scores low.
  3. Fund utilisation 15%100Value of works recommended ÷ allocated limit (MoSPI’s measure).
  4. Proof of work 15%100Share of completed works with photos or documents uploaded on eSAKSHI.
  5. Funds spent 10%95Paid to vendors ÷ allocated limit.
  6. Vendor diversity 10%
    i

    Members of Parliament (MPs) do not have direct, operational control over the specific vendors selected for government public works. However, they exert significant indirect influence by shaping procurement frameworks, passing supplier diversity laws, and conducting oversight.

    95
    How spread out payments are: full marks when no vendor gets over 20% of the money, none when one vendor gets everything.

Largest vendor: E AND C ENGINEERING AND CONSULTANCY SERVICES PRIVATE LIMITED, 24% of payments across 14 vendors.

District sanction speed

96/100 · sanction is the district authority’s job, so this doesn’t change the MP’s rank

  1. Sanction speed 100%96Average days to sanction (full marks within the 45-day guideline, none at a year), and the share of works not overdue.

Activity over time

Recommendations, payments and completions by month

Value of works MPs recommended each month

Who got paid

Top vendors by payments received

Implementing district authorities

The districts that sanction and execute this MP’s works

Works

41 works · tap “Photos” to see geo-tagged photos from eSAKSHI

Open in explorer
  • Installation of Arsenic Free water treatment cum purification along with all related work for Jhikra R.P.School.

    Drinking waterInstalling community drinking water plants· North 24 Parganas· #86971

    ₹21.0 L Completed 27 Aug 2026Rec. 22 Jan 2024Paid ₹21.0 L
  • Construction of Public Toilet & Children Park along with all related work for MISSION TAPOBAN,Deopul.

    Sanitation & drainageConstruction of toilet blocks· North 24 Parganas· #87032

    ₹33.0 L Completed 27 Aug 2026Rec. 23 Jan 2024Paid ₹33.0 L
  • Installation of arsenic free water treatment cum purification plant along with all related work for Sutia F.P. School.

    Drinking waterInstalling community drinking water plants· North 24 Parganas· #86968

    ₹21.0 L Completed 12 Aug 2026Rec. 22 Jan 2024Paid ₹21.0 L
  • SPV along with electrification work for Ghatbaor Anchasl Adarsha Vidyapith.

    Electricity & lightingImprovement of electricity distribution infrastructure· North 24 Parganas· #58949

    ₹27.3 L Completed 11 Aug 2026Rec. 8 Dec 2023Paid ₹27.3 L
  • Installation of arsenic free water treatment cum purification plant along with all related work for Gobrapur F.P.School

    Drinking waterInstalling community drinking water plants· North 24 Parganas· #86969

    ₹21.0 L Completed 11 Aug 2026Rec. 22 Jan 2024Paid ₹21.0 L
  • Installation of silent green generator (Kirloskar 25KVA) with necessary wiring with shed for Thakurnagar High School.

    Electricity & lightingImprovement of electricity distribution infrastructure· North 24 Parganas· #82312

    ₹20.0 L Completed 10 Aug 2026Rec. 15 Jan 2024Paid ₹20.0 L
  • Installation of Arsenic free water treatment cum purification plant along with all related work for Sabaipur Adarsha Vidyapith.

    Drinking waterInstalling community drinking water plants· North 24 Parganas· #86970

    ₹21.0 L Completed 5 Aug 2026Rec. 22 Jan 2024Paid ₹21.0 L
  • SPV (Tata Make) Installation along with electrification work for P.R.Thakur Vidyapith.

    Electricity & lightingImprovement of electricity distribution infrastructure· North 24 Parganas· #86975

    ₹50.0 L Completed 5 Aug 2026Rec. 22 Jan 2024Paid ₹50.0 L
  • Smart Classroom for P.R.Thakur Vidyapith.

    Education & librariesPurchase of IT systems, including hardware and software for educational purposes· North 24 Parganas· #86976

    ₹10.0 L Completed 5 Aug 2026Rec. 22 Jan 2024Paid ₹10.0 L
  • Installation of silent green generator(Kirloskar,25KVA)with necessary wiring with shed for P.R. Thakur Bidyapith.

    Electricity & lightingImprovement of electricity distribution infrastructure· North 24 Parganas· #99182

    ₹20.0 L Completed 5 Aug 2026Rec. 7 Feb 2024Paid ₹20.0 L
  • SPV(TATA MAKE)Installation along with electrification work for Sabaipur Adarsha Vidyapith.

    Electricity & lightingImprovement of electricity distribution infrastructure· North 24 Parganas· #99212

    ₹30.0 L Completed 5 Aug 2026Rec. 7 Feb 2024Paid ₹30.0 L
  • SPV (Tata make) Installation with electrification work for Gaighata High School

    Electricity & lightingImprovement of electricity distribution infrastructure· North 24 Parganas· #97244

    ₹25.0 L Completed 4 Aug 2026Rec. 5 Feb 2024Paid ₹25.0 L
  • Installation of silent green generator (Kirloskar, 25KVA) with necessary wiring with shed for Shashadanga F.P School.

    Electricity & lightingImprovement of electricity distribution infrastructure· North 24 Parganas· #82314

    ₹10.0 L Completed 24 Jul 2026Rec. 15 Jan 2024Paid ₹10.0 L
  • Installation of silent green generator (Kirloskar, 25 KVA) with necessary wiring with shed for Palla GSFP school under North 24 Parganas.

    Electricity & lightingImprovement of electricity distribution infrastructure· North 24 Parganas· #82318

    ₹20.0 L Completed 24 Jul 2026Rec. 15 Jan 2024Paid ₹20.0 L
  • Construction of Additional Class Room for Palla G.S.F.P School.

    Education & librariesConstruction of rooms and halls in school and colleges· North 24 Parganas· #86973

    ₹17.0 L Completed 24 Jul 2026Rec. 22 Jan 2024Paid ₹17.0 L

17th Lok Sabha MPs from West Bengal

Ranked by MP score

#MPUtilisationSpentCompletedScore
1Kalyan Banerjee · Sreerampur100%98%11199
2Ms Mimi Chakraborty · Jadavpur100%96%25097
3Shri Abhishek Banerjee · Diamond Harbour100%97%14997
4Ms Mahua Moitra · Krishnanagar100%100%2797
5Pratima Mondal · Joynagar100%97%14096
6Smt Sajda Ahmed · Uluberia96%96%18096
7Smt Locket Chatterjee · Hooghly100%100%30796
8Smt Satabdi Roy (Banerjee) · Birbhum100%99%12795
9Shri Kunar Hembram · Jhargram100%100%3195
10Dr Sukanta Majumdar · Balurghat94%82%33695
11Asit Kumar Mal · Bolpur100%100%5594
12Shri Deepak (Dev) Adhikari · Ghatal93%87%19594

Source: MoSPI eSAKSHI (eSAKSHI API (mplads.mospi.gov.in)). Fund utilisation = works recommended ÷ allocated limit (MoSPI’s definition); spent = vendor payments ÷ allocated limit; completion = completed ÷ recommended works. The MP score weighs completion, spending efficiency, utilisation, proof of work, spending and vendor diversity. How it’s calculated.