Skip to content
MPLADSTracker

MPLADS report card · 18th Lok Sabha

Shafi Parambil

Lok SabhaINCVadakara · Kerala

MP score46/100396th of 542 in the 18th Lok Sabha
20th of 20 from Kerala
  • Works waiting for sanction

    104 recommended works are still awaiting sanction more than 45 days later. Sanction is the district authority’s responsibility.

Allocated limit

₹14.70 Cr

Median ₹14.70 Cr

Fund utilisation

72%

₹10.51 Cr recommended · 251 works
Below median (76%)

Paid to vendors

₹1.65 Cr

11% of allocation
Below median (37%)

Works completed

34

14% of recommended
Below median (28%)

From recommendation to completion

Every work this MP recommended, by stage

  1. Recommended by the MP251 works

    ₹10.51 Cr · 72% of the ₹14.70 Cr allocated

  2. Sanctioned by the district138 works

    55% sanctioned · took 9.0 months on average (due within 45 days)

  3. Completed34 works

    ₹51.5 L final cost · 15.5 months from recommendation on average

113 works are still awaiting sanction, 104 of them for more than 45 days.

In plain words

What the numbers say

  • Recommended 251 works worth ₹10.51 Cr, a fund utilisation of 72%, higher than 41% of 18th Lok Sabha MPs.
  • The district has sanctioned 138 of them, taking 9.0 months on average.
  • ₹1.65 Cr has been paid to vendors, 11% of the allocation.
  • 34 works are complete, typically 15.5 months after recommendation. 34 works have geo-tagged photos on eSAKSHI.
  • The largest share of funds went to Roads & bridges.
  • Payments went to 14 vendors. The largest received 26%.
  • No citizen ratings have been reported for completed works.

How the score is made

MP score 46/100: finishing works counts most

  1. Works completed 30%14Completed ÷ recommended works.
  2. Spending efficiency 20%31Value of completed works ÷ money paid out. Money paid without works finished scores low.
  3. Fund utilisation 15%72Value of works recommended ÷ allocated limit (MoSPI’s measure).
  4. Proof of work 15%100Share of completed works with photos or documents uploaded on eSAKSHI.
  5. Funds spent 10%11Paid to vendors ÷ allocated limit.
  6. Vendor diversity 10%
    i

    Members of Parliament (MPs) do not have direct, operational control over the specific vendors selected for government public works. However, they exert significant indirect influence by shaping procurement frameworks, passing supplier diversity laws, and conducting oversight.

    93
    How spread out payments are: full marks when no vendor gets over 20% of the money, none when one vendor gets everything.

Largest vendor: TATA MOTORS, 26% of payments across 14 vendors.

District sanction speed

43/100 · sanction is the district authority’s job, so this doesn’t change the MP’s rank

  1. Sanction speed 100%43Average days to sanction (full marks within the 45-day guideline, none at a year), and the share of works not overdue.

Activity over time

Recommendations, payments and completions by month

Value of works MPs recommended each month

Who got paid

Top vendors by payments received

Implementing district authorities

The districts that sanction and execute this MP’s works

Works

251 works · the 60 most recent are listed here, all of them in the explorer · tap “Photos” to see geo-tagged photos from eSAKSHI

Open in explorer
  • Construction of road (10.1), Mavilattu Mukku Malol Mukku Road, Ward 04, Thiruvallur Grama panchayat, Kozhikode District

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Kozhikode· #317753

    ₹5.0 L Sanctioned · 31 Oct 2026Rec. 24 Sep 2026
  • Installation of Mini Mast Light 8mtr, 150w x 5 Nos (9.2), Elangaramkottu Mukku, Ward 04 (New 16), Kayakkodi Grama Panchayat, 2,00,000/- (2 Lakhs)

    Electricity & lightingLighting of public spaces· Kozhikode· #325128

    ₹2.0 L Awaiting sanction · 2 daysRec. 30 Oct 2026
  • Installation of Mini Mast Light 8mtr, 150w x 5 Nos (9.2), Near Namam Kulam area, Ward 07, Vadakara Municipality, Kozhikode District

    Electricity & lightingLighting of public spaces· Kozhikode· #324800

    ₹2.0 L Awaiting sanction · 4 daysRec. 28 Oct 2026
  • Construction of road (10.1), Mandiyattumukku Kandam Kandi Thazha Road, Ward 11, Chorode Grama Panchayat, Kozhikode District,

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Kozhikode· #324801

    ₹3.0 L Awaiting sanction · 4 daysRec. 28 Oct 2026
  • Installation of Mini Mast Light 8mtr, 150w x 5 Nos (9.2), Chirakkottu Thazhe Palli area, Ward 07, Chekkiad Grama Panchayat,

    Electricity & lightingLighting of public spaces· Kozhikode· #324802

    ₹2.0 L Awaiting sanction · 4 daysRec. 28 Oct 2026
  • Construction of road (10.1), Vayalali Chalil Road, Ward 06, Perambra Grama Panchayat, Kozhikode District

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Kozhikode· #324803

    ₹5.0 L Awaiting sanction · 4 daysRec. 28 Oct 2026
  • Purchase of IT systems, including hardware and software for educational purposes (3.3), Dr. B R Ambedkar Government Model Residential School for Girls Ward - 06 Maruthonkara Grama Panchayat, Kozhikode District,

    Education & librariesPurchase of IT systems, including hardware and software for educational purposes· Kozhikode· #324160

    ₹3.5 L Awaiting sanction · 9 daysRec. 23 Oct 2026
  • Construction of road (10.1), Kulangarathazha Thottumugham Bridge approach road Ward 17 (New Ward 19) Moodadi Grama Panchayat,

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Kozhikode· #315559

    ₹8.0 L Sanctioned · 22 Oct 2026Rec. 16 Sep 2026
  • Bavachi Road NAMHSS foot path construction Ward 18 Panoor Municipality, Kannur District

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Kannur· #315755

    ₹8.0 L Sanctioned · 16 Oct 2026Rec. 17 Sep 2026
  • Construction of road (10.1) Kaniyamkandi Malayil Parambu Road Ward 13 Narippatta Grama Panchayat

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Kozhikode· #268165

    ₹4.0 L Sanctioned · 15 Oct 2026Rec. 16 Feb 2026
  • Installation of Mini Mast Light. 8mtr, 150w x 5 Nos. (9.2)

    Electricity & lightingLighting of public spaces· Kozhikode· #188436

    ₹1.9 L Completed 13 Oct 2026Rec. 31 Mar 2025Paid ₹1.9 L
  • Installation of Mini Mast Light. 8mtr, 150w x 5 Nos. (9.2)

    Electricity & lightingLighting of public spaces· Kozhikode· #188455

    ₹1.9 L Completed 13 Oct 2026Rec. 31 Mar 2025Paid ₹1.9 L
  • Installation of Mini Mast Light 8mtr, 150w x 5 Nos (9.2), Near Gandhi Statue Ward 06 Kunnothuparamba Grama panchayat (Kannur)

    Electricity & lightingLighting of public spaces· Kannur· #321284

    ₹2.0 L Awaiting sanction · 23 daysRec. 9 Oct 2026
  • Construction of roads - Nadakku Meethal Pulikkal Thazhe Road, Ward 07, Purameri Grama Panchayat, Kozhikode Dt.

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Kozhikode· #237071

    ₹10.0 L Sanctioned · 7 Oct 2026Rec. 26 Sep 2025
  • Construction of footpaths (10.2) Anela Puthukkudi Anganwadi Footpath Ward 19 Koyilandy Municipality, Kozhikode Dt.

    Roads & bridgesConstruction of footpaths and pedestrian ways· Kozhikode· #237689

    ₹5.0 L Sanctioned · 7 Oct 2026Rec. 23 Jan 2026

18th Lok Sabha MPs from Kerala

Ranked by MP score

Compare
#MPUtilisationSpentCompletedScore
1Adv Dean Kuriakose · Idukki95%42%10273
2Vellalath Kochukrishnan Nair Sreekandan · Palakkad92%32%12371
3Dr Shashi Tharoor · Thiruvananthapuram68%30%5467
4Adv K Francis George · Kottayam98%23%8965
5K Radhakrishnan · Alathur98%21%3062
6Shri NK Premachandran · Kollam77%42%7862
7Shri Hibi Eden · Ernakulam92%19%2961
8Shri Kumbakudi Sudhakaran · Kannur80%19%8161
9Shri Suresh Kodikunnil · Mavelikkara78%26%7060
10K. C Venugopal · Alappuzha64%37%4558
11Shri Benny Behanan · Chalakudy80%20%3658
12Dr. M.P Abdussamad Samadani · Ponnani97%16%6257

Source: MoSPI eSAKSHI (eSAKSHI API (mplads.mospi.gov.in)). Fund utilisation = works recommended ÷ allocated limit (MoSPI’s definition); spent = vendor payments ÷ allocated limit; completion = completed ÷ recommended works. The MP score weighs completion, spending efficiency, utilisation, proof of work, spending and vendor diversity. How it’s calculated.