MPLADS report card · Rajya Sabha

Smt. Sadhna Singh

Rajya SabhaBJPTerm 2024–2030Uttar Pradesh

MP score62/10062nd of 235 in the Rajya Sabha
16th of 30 from Uttar Pradesh

Allocated limit

₹14.70 Cr

Median ₹14.70 Cr

Fund utilisation

83%

₹12.14 Cr recommended · 19 works
Above median (70%)

Paid to vendors

₹10.36 Cr

70% of allocation
Above median (25%)

Works completed

5

26% of recommended
About the median

From recommendation to completion

Every work this MP recommended, by stage

  1. Recommended by the MP19 works

    ₹12.14 Cr · 83% of the ₹14.70 Cr allocated

  2. Sanctioned by the district17 works

    89% sanctioned · took 34 days on average (due within 45 days)

  3. Completed5 works

    ₹8.28 Cr final cost · 8.6 months from recommendation on average

2 works are still awaiting sanction, 1 of them for more than 45 days.

In plain words

What the numbers say

  • Recommended 19 works worth ₹12.14 Cr, a fund utilisation of 83%, higher than 66% of Rajya Sabha MPs.
  • The district has sanctioned 17 of them, taking 34 days on average.
  • ₹10.36 Cr has been paid to vendors, 70% of the allocation.
  • 5 works are complete, typically 8.6 months after recommendation. 4 works have geo-tagged photos on eSAKSHI.
  • The largest share of funds went to Electricity & lighting.
  • Payments went to 7 vendors. The largest received 47%.
  • No citizen ratings have been reported for completed works.

How the score is made

MP score 62/100: finishing works counts most

  1. Works completed 30%26Completed ÷ recommended works.
  2. Spending efficiency 20%80Value of completed works ÷ money paid out. Money paid without works finished scores low.
  3. Fund utilisation 15%83Value of works recommended ÷ allocated limit (MoSPI’s measure).
  4. Proof of work 15%80Share of completed works with photos or documents uploaded on eSAKSHI.
  5. Funds spent 10%70Paid to vendors ÷ allocated limit.
  6. Vendor diversity 10%
    i

    Members of Parliament (MPs) do not have direct, operational control over the specific vendors selected for government public works. However, they exert significant indirect influence by shaping procurement frameworks, passing supplier diversity laws, and conducting oversight.

    66
    How spread out payments are: full marks when no vendor gets over 20% of the money, none when one vendor gets everything.

Largest vendor: UNITED GROUP OF CONSTRUCTION, 47% of payments across 7 vendors.

District sanction speed

97/100 · sanction is the district authority’s job, so this doesn’t change the MP’s rank

  1. Sanction speed 100%97Average days to sanction (full marks within the 45-day guideline, none at a year), and the share of works not overdue.

Activity over time

Recommendations, payments and completions by month

Value of works MPs recommended each month

Who got paid

Top vendors by payments received

Implementing district authorities

The districts that sanction and execute this MP’s works

Works

19 works · tap “Photos” to see geo-tagged photos from eSAKSHI

Open in explorer
  • Construction of a classroom at Swami Vivekanand Kanya Uchchatar Madhyamik Vidyalaya Jaddopatti Sikriganj District Gorakhpur with an approved amount of Rs 10 lakh

    Community buildings & public spacesConstruction of community centers and community halls· Gorakhpur· #321109

    ₹10.0 L Awaiting sanction · 24 daysRec. 8 Oct 2026
  • Supply and Installation of LED Semi High Mast Lights at Different Blocks in District Chandauli List Attached

    Electricity & lightingLighting of public spaces· Chandauli· #296403

    ₹2.30 Cr Work partially Completed · 12 Aug 2026Rec. 18 Jul 2026Paid ₹1.38 Cr
  • Construction work of an interlocking road from the house of Ramashankar Kannojiya to the house of Ravi Giri, in Village Bisunpura

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Chandauli· #277039

    ₹9.6 L Vendor Identification · 19 May 2026Rec. 31 Mar 2026Paid ₹5.7 L
  • Construction of an interlocking road in Gram Sabha Khargipur, from the main road near Shivnarayan field to Munni Lal house.

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Chandauli· #277042

    ₹16.2 L Sanctioned · 19 May 2026Rec. 31 Mar 2026
  • Construction of a Ghat Near Buddhu Baba Temple Under MPLADS

    Irrigation, flood & environmentConstruction of rainwater harvesting structures· Varanasi· #211524

    ₹9.9 L Completed 14 May 2026Rec. 23 Jun 2025Paid ₹9.9 L
  • Supply and installation of LED semi high-mast lights at 120 different locations in District Chandauli.

    Electricity & lightingLighting of public spaces· Chandauli· #241282

    ₹2.85 Cr Completed 20 Apr 2026Rec. 10 Oct 2025Paid ₹2.85 Cr
  • Construction of CC interlocking road from Panchayat Bhawan to Ajay Singh house at Village Paliya Sr No 1

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Chandauli· #261576

    ₹9.2 L Work partially Completed · 17 Mar 2026Rec. 24 Jan 2026Paid ₹9.2 L
  • Construction of CC interlocking road from Ajay Singh house to Surendra Maurya house at Village Paliya Sr. No 2

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Chandauli· #261577

    ₹9.4 L Work partially Completed · 17 Mar 2026Rec. 24 Jan 2026Paid ₹9.4 L
  • Construction of CC interlocking road from Piich Road to Binod Gupta shop at Village Paliya Sr, No 3

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Chandauli· #261578

    ₹7.4 L Work partially Completed · 17 Mar 2026Rec. 24 Jan 2026Paid ₹7.4 L
  • Construction of CC interlocking road from Anand Singh house to Kedaar Singh house at Village Saifpur Sahepur

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Chandauli· #261579

    ₹9.9 L Work partially Completed · 17 Mar 2026Rec. 24 Jan 2026Paid ₹9.9 L
  • Construction work of an interlocking road from the house of Vikas Paswan to the ghat of Pawan Yadav, via the house of Puran Vishwakarma, in Village Jalilpur. The total length of the road is 155 meters. iska hindi

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Chandauli· #270025

    ₹6.7 L Vendor Identification · 17 Mar 2026Rec. 20 Feb 2026Paid ₹3.8 L
  • Construction of an interlocking road and repair work of the drain from the house of Moti Vishwakarma to the house of Arvind Singh on Baburi Road in Chandauli Nagar

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Chandauli· #270026

    ₹3.8 L Vendor Identification · 17 Mar 2026Rec. 20 Feb 2026Paid ₹2.1 L
  • Construction of a ghat Near Temple Shiv, Virendra Singh House Under MPLADS

    Irrigation, flood & environmentConstruction of rainwater harvesting structures· Chandauli· #270027

    ₹24.8 L Vendor Identification · 17 Mar 2026Rec. 20 Feb 2026Paid ₹10.2 L
  • Construction of a road under the MPLADS from Composite Vidyalaya to the house of Rakesh Haridwar Tiwari in Sary Pakwan

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Chandauli· #270029

    ₹12.1 L Vendor Identification · 17 Mar 2026Rec. 20 Feb 2026Paid ₹12.1 L
  • Construction of a road under the MPLADS from Gaudiya Math to the house of Ramdars Singh in Subash Nagar

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Chandauli· #270030

    ₹11.0 L Sanctioned · 17 Mar 2026Rec. 20 Feb 2026

Rajya Sabha MPs from Uttar Pradesh

Ranked by MP score

Compare
#MPUtilisationSpentCompletedScore
1Shri Mithlesh Kumar99%93%19788
2Smt. Geeta alias Chandraprabha100%94%21188
3Shri B.L. Verma100%88%35083
4Smt. Darshana Singh100%89%3181
5Shri Javed Ali Khan99%84%12679
6Smt. Seema Dwivedi100%81%23179
7Shri Hardeep Singh Puri96%80%34479
8Dr. K. Laxman79%63%27577
9Shri Baburam Nishad96%70%43775
10Smt. Sangeeta Yadav100%87%4473
11Shri Ratanjit Pratap Narain Singh79%62%8870
12Shri Ramji100%83%15468

Source: MoSPI eSAKSHI (eSAKSHI API (mplads.mospi.gov.in)). Fund utilisation = works recommended ÷ allocated limit (MoSPI’s definition); spent = vendor payments ÷ allocated limit; completion = completed ÷ recommended works. The MP score weighs completion, spending efficiency, utilisation, proof of work, spending and vendor diversity. How it’s calculated.