Skip to content
MPLADSTracker

MPLADS report card · Rajya Sabha

Shri Javed Ali Khan

Rajya SabhaSPTerm 2022–2028Uttar Pradesh

MP score79/10013th of 235 in the Rajya Sabha
5th of 30 from Uttar Pradesh

Allocated limit

₹19.79 Cr

Median ₹14.70 Cr

Fund utilisation

99%

₹19.59 Cr recommended · 193 works
Above median (70%)

Paid to vendors

₹16.63 Cr

84% of allocation
Above median (25%)

Works completed

126

65% of recommended
Above median (26%)

From recommendation to completion

Every work this MP recommended, by stage

  1. Recommended by the MP193 works

    ₹19.59 Cr · 99% of the ₹19.79 Cr allocated

  2. Sanctioned by the district183 works

    95% sanctioned · took 55 days on average (due within 45 days)

  3. Completed126 works

    ₹12.25 Cr final cost · 8.7 months from recommendation on average

10 works are still awaiting sanction, 8 of them for more than 45 days.

In plain words

What the numbers say

  • Recommended 193 works worth ₹19.59 Cr, a fund utilisation of 99%, higher than 91% of Rajya Sabha MPs.
  • The district has sanctioned 183 of them, taking 55 days on average.
  • ₹16.63 Cr has been paid to vendors, 84% of the allocation.
  • 126 works are complete, typically 8.7 months after recommendation. 119 works have geo-tagged photos on eSAKSHI.
  • The largest share of funds went to Electricity & lighting.
  • Payments went to 31 vendors. The largest received 39%.
  • No citizen ratings have been reported for completed works.

How the score is made

MP score 79/100: finishing works counts most

  1. Works completed 30%65Completed ÷ recommended works.
  2. Spending efficiency 20%74Value of completed works ÷ money paid out. Money paid without works finished scores low.
  3. Fund utilisation 15%99Value of works recommended ÷ allocated limit (MoSPI’s measure).
  4. Proof of work 15%94Share of completed works with photos or documents uploaded on eSAKSHI.
  5. Funds spent 10%84Paid to vendors ÷ allocated limit.
  6. Vendor diversity 10%
    i

    Members of Parliament (MPs) do not have direct, operational control over the specific vendors selected for government public works. However, they exert significant indirect influence by shaping procurement frameworks, passing supplier diversity laws, and conducting oversight.

    76
    How spread out payments are: full marks when no vendor gets over 20% of the money, none when one vendor gets everything.

Largest vendor: HIDAYA QIRAT ENTERPRISES, 39% of payments across 31 vendors.

District sanction speed

96/100 · sanction is the district authority’s job, so this doesn’t change the MP’s rank

  1. Sanction speed 100%96Average days to sanction (full marks within the 45-day guideline, none at a year), and the share of works not overdue.

Activity over time

Recommendations, payments and completions by month

Value of works MPs recommended each month

Who got paid

Top vendors by payments received

Implementing district authorities

The districts that sanction and execute this MP’s works

Works

193 works · the 60 most recent are listed here, all of them in the explorer · tap “Photos” to see geo-tagged photos from eSAKSHI

Open in explorer
  • GRAM ANWARA TEHSIL TUNDLA MEIN LINE PAAR KABRISTAN SE BIJALI GHAR TAK INTERLOCKING WORK LENGTH 300 MTRS

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Firozabad· #299846

    ₹50.0 L Sanctioned · 31 Oct 2026Rec. 30 Jul 2026
  • MAYADEVI HIGHER SECONDARY SCHOOL GRAM CHITAURA, BAHJOI KE BHAWAN NIRMAN HETA Rs. 5 Lakh.

    Education & librariesConstruction of rooms and halls in school and colleges· Sambhal· #316987

    ₹5.0 L Awaiting sanction · 40 daysRec. 22 Sep 2026
  • TEHSIL BIKAPUR, GRAM PARWAR PARA MEIN RAMCHANDRA KE MAKAN SE SEETARAM KE MAKAN TAK CC ROAD KI REPAIR WORK. LENGTH 100 Mtrs. Cost 6,11,000.

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Ayodhya· #317138

    ₹6.1 L Awaiting sanction · 40 daysRec. 22 Sep 2026
  • supply and installation of led semi high mast light at 83 different places in district shahjahanpur

    Electricity & lightingLighting of public spaces· Shahjahanpur· #283439

    ₹2.07 Cr Completed 12 Sept 2026Rec. 24 May 2026Paid ₹2.07 Cr
  • GRAM GAINEE MEIN JAMA MASJID SE BHADON WALI MASJID TAK INTERLOCKING WORK LENGTH 203 MTRS

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Bareilly· #299641

    ₹15.1 L Vendor Identification · 11 Sept 2026Rec. 29 Jul 2026Paid ₹10.7 L
  • TEHSIL BHOGAON GRAM PANCHAYAT SAGAMAI KE GRAM SAGAMAI MEIN SHRI MAHESH BHURJI KE GHAR SE SHRI DAYARAM BHARTI KE GHAR TAK CC AND NALI NIRMAN WORK LENGTH 125 Mtrs COST 11 LAC

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Mainpuri· #281198

    ₹13.6 L Sanctioned · 8 Sept 2026Rec. 16 May 2026
  • GRAM MALAKPUR NAWADA MEIN DARGAH SE RUKHSHAH ALAM KE GHAR SE HOTE HUE SHIKHAVAT KE GHAR TAK INTERLOCKING WORK LENGTH 217 MTRS

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Sambhal· #299644

    ₹18.2 L Vendor Identification · 7 Sept 2026Rec. 29 Jul 2026Paid ₹13.6 L
  • GRAM BERNI MEIN RAJESH KUMAR KE GHAR SE CHANDRASEN KE GHAR TAK INTERLOCKING WORK LENGTH 87 MTRS

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Sambhal· #299645

    ₹11.1 L Vendor Identification · 7 Sept 2026Rec. 29 Jul 2026Paid ₹7.4 L
  • GRAM SEELPUR MEIN AMBEDKAR PARK KE KONE SE KABRISTAN KE DUSRE GATE KO OR INTERLOCKING WORK LENGTH 125 MTRS

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Moradabad· #299643

    ₹23.0 L Vendor Identification · 27 Aug 2026Rec. 29 Jul 2026Paid ₹17.1 L
  • TEHSIL BHOGAON GRAM PANCHAYAT ALLAU KE GRAM DHYANPUR MEIN SHRI ANAR SINGH KE GHAR SE SHRI SUNIL KUMAR KE GHAR TAK CC AND NALI NIRMAN WORK LENGTH 48 Mtrs Cost 4 LAC

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Mainpuri· #281196

    ₹4.0 L Sanctioned · 24 Aug 2026Rec. 16 May 2026
  • TEHSIL BHOGAON GRAM PANCHAYAT SAGAMAI KE GRAM JAGIR MEIN SHRI AVADHESH YADAV (MLC) KE GHAR SE SHRI UTTAM SINGH KE GHAR TAK CC AND NALI NIRMAN WORK LENGTH 165 Mtrs COST 10 LAC

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Mainpuri· #281197

    ₹10.0 L Sanctioned · 24 Aug 2026Rec. 16 May 2026
  • TEHSIL KISHNI GRAM PANCHAYAT MAHOLI SAMSHERGANJ KE GRAM BOJHA MEIN SHRI NANDU YADAV KE GHAR SE SHRI GOPAL FAUZI KE GHAR TAK CC AND NALI NIRMAN WORK LENGTH 100 Mtrs Cost 8 LAC

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Mainpuri· #281200

    ₹8.0 L Sanctioned · 24 Aug 2026Rec. 16 May 2026
  • INSTALLATION OF SOLAR LIGHT. ASHOK NAGAR COLONY, B BLOCK, HOUSE NO 94 NEAR OM MEDICAL STORE KE SAMANE PUBLIC PACE PAR. WARD NO. 96.

    Electricity & lightingStreet lights· Ghaziabad· #302958

    ₹22,500 Awaiting sanction · 82 daysRec. 11 Aug 2026
  • MADRASA DAWATE ISLAM NISWAN NEWARI MANJHANPUR MEIN BHAWAN NIRMAN HETU CONTACT KALEEM AHMAD 9450079646

    Education & librariesConstruction of rooms and halls in school and colleges· Kaushambi· #218868

    ₹5.0 L Completed 5 Aug 2026Rec. 16 Jul 2025Paid ₹5.0 L
  • GRAM TAROULI MEIN (1) MASTER SUNIL KE MAKAN SE LAKHAN KE MAKAN TAK INTERLOCKING WORK LENGTH 136 MTRS (2) KHACHEDI SINGH KE MAKAN SE CHANCHAL KE MAKAN TAK INTERLOCKING WORK LENGTH 80 MTRS

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Amroha· #299642

    ₹17.5 L Awaiting sanction · 95 daysRec. 29 Jul 2026

Rajya Sabha MPs from Uttar Pradesh

Ranked by MP score

Compare
#MPUtilisationSpentCompletedScore
1Shri Mithlesh Kumar99%93%19788
2Smt. Geeta alias Chandraprabha100%94%21188
3Shri B.L. Verma100%88%35083
4Smt. Darshana Singh100%89%3181
5Shri Javed Ali Khan99%84%12679
6Smt. Seema Dwivedi100%81%23179
7Shri Hardeep Singh Puri96%80%34479
8Dr. K. Laxman79%63%27577
9Shri Baburam Nishad96%70%43775
10Smt. Sangeeta Yadav100%87%4473
11Shri Ratanjit Pratap Narain Singh79%62%8870
12Shri Ramji100%83%15468

Source: MoSPI eSAKSHI (eSAKSHI API (mplads.mospi.gov.in)). Fund utilisation = works recommended ÷ allocated limit (MoSPI’s definition); spent = vendor payments ÷ allocated limit; completion = completed ÷ recommended works. The MP score weighs completion, spending efficiency, utilisation, proof of work, spending and vendor diversity. How it’s calculated.