Skip to content
MPLADSTracker

MPLADS report card · Rajya Sabha

Shri Ravi Chandra Vaddiraju

Rajya SabhaBRSTerm 2024–2030Telangana

MP score63/10055th of 235 in the Rajya Sabha
1st of 7 from Telangana

Allocated limit

₹15.27 Cr

Median ₹14.70 Cr

Fund utilisation

92%

₹14.01 Cr recommended · 300 works
Above median (70%)

Paid to vendors

₹7.80 Cr

51% of allocation
Above median (25%)

Works completed

108

36% of recommended
Above median (26%)

From recommendation to completion

Every work this MP recommended, by stage

  1. Recommended by the MP300 works

    ₹14.01 Cr · 92% of the ₹15.27 Cr allocated

  2. Sanctioned by the district230 works

    77% sanctioned · took 5.3 months on average (due within 45 days)

  3. Completed108 works

    ₹4.66 Cr final cost · 7.4 months from recommendation on average

70 works are still awaiting sanction, 48 of them for more than 45 days.

In plain words

What the numbers say

  • Recommended 300 works worth ₹14.01 Cr, a fund utilisation of 92%, higher than 76% of Rajya Sabha MPs.
  • The district has sanctioned 230 of them, taking 5.3 months on average.
  • ₹7.80 Cr has been paid to vendors, 51% of the allocation.
  • 108 works are complete, typically 7.4 months after recommendation. 83 works have geo-tagged photos on eSAKSHI.
  • The largest share of funds went to Roads & bridges.
  • Payments went to 61 vendors. The largest received 7.6%.
  • No citizen ratings have been reported for completed works.

How the score is made

MP score 63/100: finishing works counts most

  1. Works completed 30%36Completed ÷ recommended works.
  2. Spending efficiency 20%60Value of completed works ÷ money paid out. Money paid without works finished scores low.
  3. Fund utilisation 15%92Value of works recommended ÷ allocated limit (MoSPI’s measure).
  4. Proof of work 15%77Share of completed works with photos or documents uploaded on eSAKSHI.
  5. Funds spent 10%51Paid to vendors ÷ allocated limit.
  6. Vendor diversity 10%
    i

    Members of Parliament (MPs) do not have direct, operational control over the specific vendors selected for government public works. However, they exert significant indirect influence by shaping procurement frameworks, passing supplier diversity laws, and conducting oversight.

    100
    How spread out payments are: full marks when no vendor gets over 20% of the money, none when one vendor gets everything.

Largest vendor: BHOJYA GUGULOTH, 7.6% of payments across 61 vendors.

District sanction speed

74/100 · sanction is the district authority’s job, so this doesn’t change the MP’s rank

  1. Sanction speed 100%74Average days to sanction (full marks within the 45-day guideline, none at a year), and the share of works not overdue.

Activity over time

Recommendations, payments and completions by month

Value of works MPs recommended each month

Who got paid

Top vendors by payments received

Implementing district authorities

The districts that sanction and execute this MP’s works

Works

300 works · the 60 most recent are listed here, all of them in the explorer · tap “Photos” to see geo-tagged photos from eSAKSHI

Open in explorer
  • Drilling of Borewell and Fixing with Suitable Motor and Pumpset at Near Bhagyamma House, N.K.Nagar,(Badavath Thanda)GP,Chunchupalli Mandal,Bhadradri Kothagudem District

    Drinking waterInstalling tube-wells and borewells· Bhadradri Kothagudem· #324845

    ₹1.5 L Awaiting sanction · 3 daysRec. 29 Oct 2026
  • Laying of CC Road from Tirupathaiah (H) to Seenu(H) in Thanda, Gundlapally (V&M), Nalgonda Dist.

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Nalgonda· #321679

    ₹5.0 L Awaiting sanction · 20 daysRec. 12 Oct 2026
  • construction of Bus shelter at Neeojipally village , Boinpally (M), Rajanna Sircilla Dist

    Community buildings & public spacesConstruction of common work sheds / common covered sitting area· Rajanna Sircilla· #321680

    ₹10.0 L Awaiting sanction · 20 daysRec. 12 Oct 2026
  • additional structure to community hall in ward no 35

    Community buildings & public spacesConstruction of community centers and community halls· Nalgonda· #315774

    ₹5.0 L Sanctioned · 8 Oct 2026Rec. 17 Sep 2026
  • Providing and installation of high-mast lighting system for illumination of public areas at Alaibalai Park TNGOs Colony, Gachibowli, Financial District, Rangareddy District

    Electricity & lightingLighting of public spaces· Ranga Reddy· #320960

    ₹2.0 L Awaiting sanction · 24 daysRec. 8 Oct 2026
  • Providing and installation of high-mast lighting system for illumination of public areas at at Alaibalai Park , TNGOs Colony, Gachibowli, Financial District, Rangareddy District

    Electricity & lightingLighting of public spaces· Ranga Reddy· #320961

    ₹2.0 L Awaiting sanction · 24 daysRec. 8 Oct 2026
  • Construction of Community Hall in Ward No.4, Avancha(V), Thimmajipet(M), Nagarkurnool Dist.

    Community buildings & public spacesConstruction of community centers and community halls· Nagarkurnool· #320967

    ₹15.0 L Awaiting sanction · 24 daysRec. 8 Oct 2026
  • Construction of Library Building at Ward No.06 in New Laxmipuram(V), Mudigonda(M), Khammam District.

    Education & librariesConstruction of public libraries and reading rooms· Khammam· #292949

    ₹15.0 L Sanctioned · 7 Oct 2026Rec. 8 Jul 2026
  • Bore wells (4 numbers) and installation with motors at Division no 60,Kothagudem (MC) , Badhradri Kothagudem District

    Drinking waterInstalling tube-wells and borewells· Bhadradri Kothagudem· #284982

    ₹6.0 L Sanctioned · 6 Oct 2026Rec. 11 Jun 2026
  • Drilling of Bore well and Fixing a Motor and Pumpset at Palvancha Jayamma Colony, 7th Division of Kothagudem Municipal Corporation.

    Drinking waterInstalling tube-wells and borewells· Bhadradri Kothagudem· #287915

    ₹1.5 L Sanctioned · 6 Oct 2026Rec. 22 Jun 2026
  • Drilling of Bore well and Fixing a Motor and Pumpset at Vikalangula Colony, 7th Division of Kothagudem Municipal Corporation.

    Drinking waterInstalling tube-wells and borewells· Bhadradri Kothagudem· #287916

    ₹1.5 L Sanctioned · 6 Oct 2026Rec. 22 Jun 2026
  • Drilling of Bore well and Fixing a Motor and Pumpset Near by Pragathi Nagar Shivalayam temple, at 30th Division of Kothagudem Municipal Corporation

    Drinking waterInstalling tube-wells and borewells· Bhadradri Kothagudem· #287944

    ₹1.5 L Sanctioned · 6 Oct 2026Rec. 22 Jun 2026
  • Drilling of Bore well and Fixing a Motor and Pumpset at New Gollagudem near by bankka Komaraiah house 30th Division of Kothagudem Municipal Corporation

    Drinking waterInstalling tube-wells and borewells· Bhadradri Kothagudem· #287945

    ₹1.5 L Sanctioned · 6 Oct 2026Rec. 22 Jun 2026
  • Drilling of Bore well and Fixing a Motor and Pumpset at Opposite SRKT School, 53rd Division of Kothagudem Municipal Corporation.

    Drinking waterInstalling tube-wells and borewells· Bhadradri Kothagudem· #287946

    ₹1.5 L Sanctioned · 6 Oct 2026Rec. 22 Jun 2026
  • Drilling of Bore well and Fixing a Motor and Pumpset at Lenin Nagar Near Katta Mysamma Temple line, 53rd Division of Kothagudem Municipal Corporation.

    Drinking waterInstalling tube-wells and borewells· Bhadradri Kothagudem· #287947

    ₹1.5 L Sanctioned · 6 Oct 2026Rec. 22 Jun 2026

Rajya Sabha MPs from Telangana

Ranked by MP score

Compare

Source: MoSPI eSAKSHI (eSAKSHI API (mplads.mospi.gov.in)). Fund utilisation = works recommended ÷ allocated limit (MoSPI’s definition); spent = vendor payments ÷ allocated limit; completion = completed ÷ recommended works. The MP score weighs completion, spending efficiency, utilisation, proof of work, spending and vendor diversity. How it’s calculated.