Skip to content
MPLADSTracker

MPLADS report card · Rajya Sabha

Shri Anil Kumar Yadav Mandadi

Rajya SabhaINCTerm 2024–2030Telangana

MP score62/10061st of 235 in the Rajya Sabha
2nd of 7 from Telangana
  • Payments concentrated with one vendor

    61% of vendor payments went to SANTRIX CONSTRUCTIONS.

Allocated limit

₹14.70 Cr

Median ₹14.70 Cr

Fund utilisation

76%

₹11.13 Cr recommended · 122 works
Above median (70%)

Paid to vendors

₹5.54 Cr

38% of allocation
Above median (25%)

Works completed

71

58% of recommended
Above median (26%)

From recommendation to completion

Every work this MP recommended, by stage

  1. Recommended by the MP122 works

    ₹11.13 Cr · 76% of the ₹14.70 Cr allocated

  2. Sanctioned by the district95 works

    78% sanctioned · took 3.8 months on average (due within 45 days)

  3. Completed71 works

    ₹5.37 Cr final cost · 5.1 months from recommendation on average

27 works are still awaiting sanction, 10 of them for more than 45 days.

In plain words

What the numbers say

  • Recommended 122 works worth ₹11.13 Cr, a fund utilisation of 76%, higher than 56% of Rajya Sabha MPs.
  • The district has sanctioned 95 of them, taking 3.8 months on average.
  • ₹5.54 Cr has been paid to vendors, 38% of the allocation.
  • 71 works are complete, typically 5.1 months after recommendation. 25 works have geo-tagged photos on eSAKSHI.
  • The largest share of funds went to Electricity & lighting.
  • Payments went to 16 vendors. The largest received 61%.
  • No citizen ratings have been reported for completed works.

How the score is made

MP score 62/100: finishing works counts most

  1. Works completed 30%58Completed ÷ recommended works.
  2. Spending efficiency 20%97Value of completed works ÷ money paid out. Money paid without works finished scores low.
  3. Fund utilisation 15%76Value of works recommended ÷ allocated limit (MoSPI’s measure).
  4. Proof of work 15%34Share of completed works with photos or documents uploaded on eSAKSHI.
  5. Funds spent 10%38Paid to vendors ÷ allocated limit.
  6. Vendor diversity 10%
    i

    Members of Parliament (MPs) do not have direct, operational control over the specific vendors selected for government public works. However, they exert significant indirect influence by shaping procurement frameworks, passing supplier diversity laws, and conducting oversight.

    49
    How spread out payments are: full marks when no vendor gets over 20% of the money, none when one vendor gets everything.

Largest vendor: SANTRIX CONSTRUCTIONS, 61% of payments across 16 vendors.

District sanction speed

85/100 · sanction is the district authority’s job, so this doesn’t change the MP’s rank

  1. Sanction speed 100%85Average days to sanction (full marks within the 45-day guideline, none at a year), and the share of works not overdue.

Activity over time

Recommendations, payments and completions by month

Value of works MPs recommended each month

Who got paid

Top vendors by payments received

Implementing district authorities

The districts that sanction and execute this MP’s works

Works

123 works · the 60 most recent are listed here, all of them in the explorer · tap “Photos” to see geo-tagged photos from eSAKSHI

Open in explorer
  • Providing Highmast Lights in Vatti Kampahad Village, Chevvmala Mandal, Suryapet District

    Electricity & lightingLighting of public spaces· Suryapet· #319172

    ₹5.0 L Sanctioned · 24 Oct 2026Rec. 15 Oct 2026
  • Providing Highmast Lights in Puli Thanda (Badi Thanda) Village, Chevvmala Mandal, Suryapet District

    Electricity & lightingLaying of synthetic turfs for hockey and football· Suryapet· #319173

    ₹5.0 L Sanctioned · 24 Oct 2026Rec. 15 Oct 2026
  • Supply, Delivery and Installation of CC TV Cameras in Narsihmulagudem Village of Munagala Mandal

    Safety & securityProviding CCTV camera system for security of public areas· Suryapet· #323558

    ₹5.0 L Awaiting sanction · 13 daysRec. 19 Oct 2026
  • Providing Solar Street Lights in Narsihmulagudem Village of Munagala Mandal

    Electricity & lightingStreet lights· Suryapet· #323559

    ₹5.0 L Awaiting sanction · 13 daysRec. 19 Oct 2026
  • Installation of Second Gate on the Land Owned by the Municipal Council at Punjabi Sewa Sadan at Ward No. 30, Kaithal, Dist. Kaithal, Haryana

    Community buildings & public spacesConstruction of boundary walls of existing public and community buildings· Kaithal· #2336

    ₹7.0 L Awaiting sanction · 13 daysRec. 19 Oct 2026
  • Providing Highmast Lights in BC Colony in Cherla Itykiala Village of Tadoor (M) of Nagarkurnool District.

    Electricity & lightingLighting of public spaces· Nagarkurnool· #320158

    ₹5.0 L Awaiting sanction · 17 daysRec. 15 Oct 2026
  • Providing of 1 No. of High Mast Lights at SC Community Hall in Gudipally (V) of Nagarkurnool (M&D)

    Electricity & lightingLighting of public spaces· Nagarkurnool· #320159

    ₹1.8 L Awaiting sanction · 17 daysRec. 15 Oct 2026
  • Providing of 1 No. of High Mast Lights at Peerla Chavidi in Gudipally (V) of Nagarkurnool (M&D)

    Electricity & lightingLighting of public spaces· Nagarkurnool· #320160

    ₹1.8 L Awaiting sanction · 17 daysRec. 15 Oct 2026
  • Providing of 1 No. of High Mast Lights at Bus Stand in Gudipally (V) of Nagarkurnool (M&D)

    Electricity & lightingLighting of public spaces· Nagarkurnool· #320161

    ₹1.8 L Awaiting sanction · 17 daysRec. 15 Oct 2026
  • Installation of CC Cameras at Various places of Ward No.41 in Miryalaguda Municipality

    Safety & securityProviding CCTV camera system for security of public areas· Nalgonda· #319206

    ₹5.0 L Awaiting sanction · 32 daysRec. 30 Sep 2026
  • Laying of SWG line in Ramalayam Street, Ganesh Nagar, Ramnagar Musheerabad Assembly Hyderabad

    Sanitation & drainageProviding drains and gutters for public drainage· Hyderabad· #318890

    ₹29.0 L Awaiting sanction · 33 daysRec. 29 Sep 2026
  • Laying of VDCC road from 2-1-415/A to 2-1-414/1 at street No 4, Mayuri lane 81, circle-16, SBZ, GHMC, Baglingampally, Musherabad Assembly Hyderabad

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Hyderabad· #318891

    ₹10.0 L Awaiting sanction · 33 daysRec. 29 Sep 2026
  • Laying of VDCC road from Jaya Laxmi Kirana Stores to Sai Sadan Apartment at SBH Colony New Bakaram Gandhi Nagar, Musheerabad Assembly Hyderabad

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Hyderabad· #318894

    ₹23.0 L Awaiting sanction · 33 daysRec. 29 Sep 2026
  • Laying of SWG Pipe line from SC ST Hostel to Miraj Kirana Store, Anjaiah Nagar, Vidya Nagar, Adikmet, Musheerabad Assembly Hyderabad

    Sanitation & drainageProviding drains and gutters for public drainage· Hyderabad· #318897

    ₹10.0 L Awaiting sanction · 33 daysRec. 29 Sep 2026
  • Installation of CC Cameras at Various Places of Ward No.29 in Miryalguda Municipality

    Safety & securityProviding CCTV camera system for security of public areas· Nalgonda· #302157

    ₹5.0 L Sanctioned · 24 Sept 2026Rec. 29 Aug 2026

Rajya Sabha MPs from Telangana

Ranked by MP score

Compare

Source: MoSPI eSAKSHI (eSAKSHI API (mplads.mospi.gov.in)). Fund utilisation = works recommended ÷ allocated limit (MoSPI’s definition); spent = vendor payments ÷ allocated limit; completion = completed ÷ recommended works. The MP score weighs completion, spending efficiency, utilisation, proof of work, spending and vendor diversity. How it’s calculated.