Allocated limit
₹22.13 Cr
Median ₹14.70 Cr
Fund utilisation
100%
₹22.12 Cr recommended · 90 works
Above median (70%)
Paid to vendors
₹18.11 Cr
82% of allocation
Above median (25%)
Works completed
25
28% of recommended
Above median (26%)
From recommendation to completion
Every work this MP recommended, by stage
- Recommended by the MP90 works
₹22.12 Cr · 100% of the ₹22.13 Cr allocated
- Sanctioned by the district85 works
94% sanctioned · took 2.1 months on average (due within 45 days)
- Completed25 works
₹7.87 Cr final cost · 10.1 months from recommendation on average
5 works are still awaiting sanction, 5 of them for more than 45 days.
In plain words
What the numbers say
- Recommended 90 works worth ₹22.12 Cr, a fund utilisation of 100%, higher than 96% of Rajya Sabha MPs.
- The district has sanctioned 85 of them, taking 2.1 months on average.
- ₹18.11 Cr has been paid to vendors, 82% of the allocation.
- 25 works are complete, typically 10.1 months after recommendation. 25 works have geo-tagged photos on eSAKSHI.
- The largest share of funds went to Roads & bridges.
- Payments went to 19 vendors. The largest received 29%.
- No citizen ratings have been reported for completed works.
How the score is made
MP score 64/100: finishing works counts most
- Works completed 30%28Completed ÷ recommended works.
- Spending efficiency 20%43Value of completed works ÷ money paid out. Money paid without works finished scores low.
- Fund utilisation 15%100Value of works recommended ÷ allocated limit (MoSPI’s measure).
- Proof of work 15%100Share of completed works with photos or documents uploaded on eSAKSHI.
- Funds spent 10%82Paid to vendors ÷ allocated limit.
- Vendor diversity 10%89How spread out payments are: full marks when no vendor gets over 20% of the money, none when one vendor gets everything.
i
Members of Parliament (MPs) do not have direct, operational control over the specific vendors selected for government public works. However, they exert significant indirect influence by shaping procurement frameworks, passing supplier diversity laws, and conducting oversight.
Largest vendor: Pradeep Kumar, 29% of payments across 19 vendors.
District sanction speed
94/100 · sanction is the district authority’s job, so this doesn’t change the MP’s rank
- Sanction speed 100%94Average days to sanction (full marks within the 45-day guideline, none at a year), and the share of works not overdue.
Activity over time
Recommendations, payments and completions by month
Sectors
Value of works by category
Who got paid
Top vendors by payments received
Implementing district authorities
The districts that sanction and execute this MP’s works
Works
90 works · the 60 most recent are listed here, all of them in the explorer · tap “Photos” to see geo-tagged photos from eSAKSHI
TEHSIL SIRSAGANJ, BLOCK ARAON. GRAM PANCHAYAT MOHAMMADPUR MADAI, GRAM MOHAMMADPUR MEIN MAINPURI ROAD SE MASJID TAK C.C NIRMAN WORK. LENGTH 100 Mtrs COST 10 LAC.
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Firozabad· #315244
₹10.0 L Sanctioned · 21 Oct 2026Rec. 15 Sep 2026TEHSIL & BLOCK FIROZABAD GRAM MATAMAI MEIN SUBHASH PARK SE LEKAR MATA KE MANDIR TAK C.C. AND NALI NIRMAN WORK. LENGTH 280 Mtrs COST 35 LAC.
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Firozabad· #315245
₹35.0 L Sanctioned · 21 Oct 2026Rec. 15 Sep 2026TEHSIL SIRSAGANJ, BLOCK ARAON. GRAM PANCHAYAT DHATARI KE GRAM NANDPUR MEIN MOOLCHAND JUNIOR HIGH SCHOOL SE JAGDISH GOLA KE MAKAN TAK C.C. NIRMAN WORK. LENGTH 125 Mtrs COST 17 LAC.
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Firozabad· #315246
₹17.0 L Sanctioned · 21 Oct 2026Rec. 15 Sep 2026TEHSIL TUNDLA, BLOCK TUNDLA. GRAM PANCHAYAT CHULHAOALI MAUJA BASAI MEIN OMPRAKASH KE MAKAN SE ARUN CHOUDHARY KE MAKAN TAK C.C. NIRMAN WORK. LENGTH 100 Mtrs AND WIDTH 8 Mtrs COST 24 LAC.
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Firozabad· #315247
₹24.0 L Sanctioned · 21 Oct 2026Rec. 15 Sep 2026TEHSIL SHIKOHABAD, BLOCK HATHWANT, RAJSWAGRAM THANUMAI KE NAGLA DEVSEN MEIN BRIJRAJ SINGH KE MAKAN SE SATYAPAL SINGH KE MAKAN TAK C.C. NIRMAN WORK. LENGTH 180 Mtrs. COST 24 LAC.
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Firozabad· #315248
₹24.0 L Sanctioned · 21 Oct 2026Rec. 15 Sep 2026WARD NO.-44. RAJA RAM KI THAR, SUHAGNAGAR, SECTOR-3 MEIN PHORAN SINGH YADAV KE MAKAN SE MUNNALAL YADAV KE MAKAN TAK C.C. NIRMAN WORK. LENGTH 100 Mtrs & WIDTH 6 Mtrs. COST 18 LAC.
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Firozabad· #315249
₹18.0 L Sanctioned · 21 Oct 2026Rec. 15 Sep 2026TEHSIL SHIKOHABAD, BLOCK SHIKOHABAD. GRAM SALEMPUR MEIN MANDIR SE INDRAPAL KE MAKAN TAK C.C. NIRMAN WORK. LENGTH 150 Mtrs COST 24 LAC.
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Firozabad· #315250
₹23.9 L Sanctioned · 21 Oct 2026Rec. 15 Sep 2026INSTALLATION OF ONE SOLAR LIGHTS (SOLAR HIGH MAST FOUNDATION PAR 7 Mtr OCTAGONAL POLE PAR 18 WATT KI 4 LIGHTS). PLOT NO-6/194, SECTOR-2, RAJENDRA NAGAR, SAHIBABAD, GHAZIABAD (BUDHA PARK WALI GALI MEIN) KE SAMANE. Contact Person- Choudhary Narendra Singh 9868521242
Electricity & lightingStreet lights· Ghaziabad· #315251
₹1.1 L Awaiting sanction · 47 daysRec. 15 Sep 2026TEHSIL SAIFAI KE GRAM PANCHAYAT SAFAI MEIN MUKESH GUPTA KE MAKAN SE PRAMOD YADAV KE MAKAN TAK CC ROAD DONON TARAF NALI SAHIT NIRMAN KARYA. COST 58 LAC.
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Etawah· #314659
₹58.0 L Awaiting sanction · 49 daysRec. 13 Sep 2026TEHSIL SAIFAI KE GRAM MUCHEHRA MEIN PRIYA YADAV KE MAKAN SE ETAWAH-MAINPURI ROAD TAK C.C. NALA NIRMAN. LENGTH 50 MTRS, WIDTH 3 FEET AND DEPTH 3 FEET. COST 7 LAC.
Sanitation & drainageProviding drains and gutters for public drainage· Etawah· #291829
₹7.0 L Sanctioned · 11 Sept 2026Rec. 3 Jul 2026TEHSIL TAKHA GRAM AMTHARI KE MAJRA NAGLA MAYA MEIN ANVEER YADAV KE MAKAN SE LEKAR GAMADEVI KE MANDIR SE HOTE HUE MANSHARAM KRISHAN KUMAR KE MAKAN TAK CC ROAD WITH NALI. LENGTH 200 MTRS.
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Etawah· #300795
₹24.0 L Sanctioned · 11 Sept 2026Rec. 3 Aug 2026TEHSIL SHIKOHABAD KE MADHAVGANJ MEIN SHRI MUKESH YADAV KE MAKAN SE SHRI MANJESH KE MAKAN TAK LENGTH 45 MTRS WIDTH 6 MTRS CC ROAD AND NALI NIRMAN COST 8 LAKH CONTACT PERSON SHRI RAVISH YADAV 9720056400
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Firozabad· #278211
₹8.0 L Vendor Identification · 8 Sept 2026Rec. 15 Apr 2026Paid ₹6.0 LTEHSIL KARHAL GRAM RAJPUR ETAWAH-MAINPURI ROAD SE AHIBARAN SINGH KE MAKAN SE HOTE HUE SURENDRA YADAV KE MAKAN TAK CC ROAD WITH NALI. LENGTH 300 MTRS.
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Mainpuri· #300778
₹36.0 L Awaiting sanction · 90 daysRec. 3 Aug 2026TEHSIL JASWANTNAGAR KE GRAM BHAVALPUR MEIN NH-19 SE TIRUPATI COLD STORAGE HOTE HUE PLAY GROUND TAK SAMPARK MARG BANANE HETU (CC ROAD NIRMAN) LENGTH 110 Mtrs Width 5 Mtrs Cost Rs 20 Lakh
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Etawah· #285762
₹20.0 L Sanctioned · 21 Jul 2026Rec. 15 Jun 2026TEHSIL SAIFAI KE ANTARGAT GRAM MUCHEHRA MEIN ETAWAH-MAINPURI ROAD KE KINARE RIGHT SIDE STADIUM ROAD SE BHALI-MUCHEHRA ESCAPE TAK C.C. NALA NIRMAN. Length 140 Mtrs, Width 4 Feet, Depth 4 Feet & TWO PULIYA NIRMAN WORK 10-10 Mtrs. Cost 18 LAC.
Sanitation & drainageProviding drains and gutters for public drainage· Etawah· #286186
₹18.0 L Physical Inspection · 21 Jul 2026Rec. 17 Jun 2026Paid ₹18.0 L
Rajya Sabha MPs from Uttar Pradesh
Ranked by MP score
| # | MP | Utilisation | Spent | Completed | Score |
|---|---|---|---|---|---|
| 1 | Shri Mithlesh Kumar | 99% | 93% | 197 | 88 |
| 2 | Smt. Geeta alias Chandraprabha | 100% | 94% | 211 | 88 |
| 3 | Shri B.L. Verma | 100% | 88% | 350 | 83 |
| 4 | Smt. Darshana Singh | 100% | 89% | 31 | 81 |
| 5 | Shri Javed Ali Khan | 99% | 84% | 126 | 79 |
| 6 | Smt. Seema Dwivedi | 100% | 81% | 231 | 79 |
| 7 | Shri Hardeep Singh Puri | 96% | 80% | 344 | 79 |
| 8 | Dr. K. Laxman | 79% | 63% | 275 | 77 |
| 9 | Shri Baburam Nishad | 96% | 70% | 437 | 75 |
| 10 | Smt. Sangeeta Yadav | 100% | 87% | 44 | 73 |
| 11 | Shri Ratanjit Pratap Narain Singh | 79% | 62% | 88 | 70 |
| 12 | Shri Ramji | 100% | 83% | 154 | 68 |
Source: MoSPI eSAKSHI (eSAKSHI API (mplads.mospi.gov.in)). Fund utilisation = works recommended ÷ allocated limit (MoSPI’s definition); spent = vendor payments ÷ allocated limit; completion = completed ÷ recommended works. The MP score weighs completion, spending efficiency, utilisation, proof of work, spending and vendor diversity. How it’s calculated.