Allocated limit
₹15.97 Cr
Median ₹14.70 Cr
Fund utilisation
87%
₹13.90 Cr recommended · 179 works
Above median (76%)
Paid to vendors
₹8.70 Cr
55% of allocation
Above median (37%)
Works completed
77
43% of recommended
Above median (28%)
From recommendation to completion
Every work this MP recommended, by stage
- Recommended by the MP179 works
₹13.90 Cr · 87% of the ₹15.97 Cr allocated
- Sanctioned by the district148 works
83% sanctioned · took 2.7 months on average (due within 45 days)
- Completed77 works
₹5.99 Cr final cost · 10.1 months from recommendation on average
31 works are still awaiting sanction.
In plain words
What the numbers say
- Recommended 179 works worth ₹13.90 Cr, a fund utilisation of 87%, higher than 68% of 18th Lok Sabha MPs.
- The district has sanctioned 148 of them, taking 2.7 months on average.
- ₹8.70 Cr has been paid to vendors, 55% of the allocation.
- 77 works are complete, typically 10.1 months after recommendation. 60 works have geo-tagged photos on eSAKSHI.
- The largest share of funds went to Roads & bridges.
- Payments went to 106 vendors. The largest received 4.2%.
- No citizen ratings have been reported for completed works.
How the score is made
MP score 67/100: finishing works counts most
- Works completed 30%43Completed ÷ recommended works.
- Spending efficiency 20%69Value of completed works ÷ money paid out. Money paid without works finished scores low.
- Fund utilisation 15%87Value of works recommended ÷ allocated limit (MoSPI’s measure).
- Proof of work 15%78Share of completed works with photos or documents uploaded on eSAKSHI.
- Funds spent 10%55Paid to vendors ÷ allocated limit.
- Vendor diversity 10%100How spread out payments are: full marks when no vendor gets over 20% of the money, none when one vendor gets everything.
i
Members of Parliament (MPs) do not have direct, operational control over the specific vendors selected for government public works. However, they exert significant indirect influence by shaping procurement frameworks, passing supplier diversity laws, and conducting oversight.
Largest vendor: TRILOCHAN RAM YADAV, 4.2% of payments across 106 vendors.
District sanction speed
94/100 · sanction is the district authority’s job, so this doesn’t change the MP’s rank
- Sanction speed 100%94Average days to sanction (full marks within the 45-day guideline, none at a year), and the share of works not overdue.
Activity over time
Recommendations, payments and completions by month
Sectors
Value of works by category
Who got paid
Top vendors by payments received
Implementing district authorities
The districts that sanction and execute this MP’s works
Works
179 works · the 60 most recent are listed here, all of them in the explorer · tap “Photos” to see geo-tagged photos from eSAKSHI
Construction Of boundary walls at Muktidham
Community buildings & public spacesCrematoriums / Energy efficient crematoriums or structures on burial / cremation ground· Sarangarh-Bilaigarh· #319760
₹10.0 L Sanctioned · 31 Oct 2026Rec. 2 Oct 2026Construction of Shed
Community buildings & public spacesConstruction of common work sheds / common covered sitting area· Raigarh· #275917
₹3.0 L Sanctioned · 28 Oct 2026Rec. 27 Mar 2026Construction Of Cultural Stage
Community buildings & public spacesConstruction of buildings for community cultural activities· Raigarh· #275918
₹2.0 L Sanctioned · 28 Oct 2026Rec. 27 Mar 2026Construction of Culvert/ Bridge
Roads & bridgesConstruction of culverts and bridges· Jashpur· #318462
₹10.0 L Vendor Identification · 27 Oct 2026Rec. 27 Sep 2026Paid ₹5.0 LConstruction of RCC Culvert/ Bridge
Roads & bridgesConstruction of culverts and bridges· Jashpur· #319778
₹10.0 L Sanctioned · 27 Oct 2026Rec. 2 Oct 2026Construction of RCC Culvert / Bridge
Roads & bridgesConstruction of culverts and bridges· Sarangarh-Bilaigarh· #324380
₹10.0 L Awaiting sanction · 8 daysRec. 24 Oct 2026Drain Construction Work
Sanitation & drainageProviding drains and gutters for public drainage· Sarangarh-Bilaigarh· #324386
₹5.0 L Awaiting sanction · 8 daysRec. 24 Oct 2026Construction of Shed/ Covered Sitting Area
Community buildings & public spacesConstruction of common work sheds / common covered sitting area· Raigarh· #316611
₹5.5 L Vendor Identification · 23 Oct 2026Rec. 21 Sep 2026Paid ₹2.8 LConstruction of Shed/ common Covered Sitting area
Community buildings & public spacesConstruction of common work sheds / common covered sitting area· Raigarh· #316612
₹10.0 L Vendor Identification · 23 Oct 2026Rec. 21 Sep 2026Paid ₹5.0 LConstruction of RCC Culvert/ Bridge
Roads & bridgesConstruction of culverts and bridges· Raigarh· #319769
₹19.9 L Work partially Completed · 23 Oct 2026Rec. 2 Oct 2026Paid ₹9.9 LConstruction of C.C. Road
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Raigarh· #319771
₹10.0 L Work partially Completed · 23 Oct 2026Rec. 2 Oct 2026Paid ₹5.0 LConstruction Work of Drainage,
Sanitation & drainageProviding drains and gutters for public drainage· Jashpur· #320369
₹10.0 L Awaiting sanction · 10 daysRec. 22 Oct 2026Construction of RCC Culvert/ Bridge
Roads & bridgesConstruction of culverts and bridges· Jashpur· #322317
₹12.0 L Awaiting sanction · 10 daysRec. 22 Oct 2026C.C. Road Construction
Roads & bridgesConstruction of footpaths and pedestrian ways· Sarangarh-Bilaigarh· #318546
₹10.0 L Vendor Identification · 16 Oct 2026Rec. 27 Sep 2026Construction of C.C. Road
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Sarangarh-Bilaigarh· #318547
₹15.0 L Vendor Identification · 16 Oct 2026Rec. 27 Sep 2026
18th Lok Sabha MPs from Chhattisgarh
Ranked by MP score
| # | MP | Utilisation | Spent | Completed | Score |
|---|---|---|---|---|---|
| 1 | Kamlesh Jangde · Janjgir Champa | 92% | 68% | 261 | 79 |
| 2 | Jyotsna Charandas Mahant · Korba | 84% | 51% | 152 | 68 |
| 3 | Radhe Shyam Rathiya · Raigarh | 87% | 55% | 77 | 67 |
| 4 | Roop Kumari Choudhary · Mahasamund | 80% | 54% | 82 | 64 |
| 5 | Santosh Pandey · Rajnandgaon | 59% | 46% | 74 | 60 |
| 6 | Vijay Baghel · Durg | 96% | 50% | 71 | 59 |
| 7 | Chintamani Maharaj · Sarguja | 70% | 45% | 94 | 57 |
| 8 | Mahesh Kashyap · Bastar | 87% | 46% | 48 | 55 |
| 9 | Tokhan Sahu · Bilaspur | 72% | 40% | 46 | 55 |
| 10 | Brijmohan Agrawal · Raipur | 87% | 47% | 38 | 52 |
| 11 | Bhojraj Nag · Kanker | 49% | 24% | 31 | 51 |
Source: MoSPI eSAKSHI (eSAKSHI API (mplads.mospi.gov.in)). Fund utilisation = works recommended ÷ allocated limit (MoSPI’s definition); spent = vendor payments ÷ allocated limit; completion = completed ÷ recommended works. The MP score weighs completion, spending efficiency, utilisation, proof of work, spending and vendor diversity. How it’s calculated.