Allocated limit
₹14.70 Cr
Median ₹14.70 Cr
Fund utilisation
87%
₹12.81 Cr recommended · 240 works
Above median (76%)
Paid to vendors
₹6.74 Cr
46% of allocation
Above median (37%)
Works completed
48
20% of recommended
Below median (28%)
From recommendation to completion
Every work this MP recommended, by stage
- Recommended by the MP240 works
₹12.81 Cr · 87% of the ₹14.70 Cr allocated
- Sanctioned by the district185 works
77% sanctioned · took 3.6 months on average (due within 45 days)
- Completed48 works
₹2.28 Cr final cost · 14.2 months from recommendation on average
55 works are still awaiting sanction, 21 of them for more than 45 days.
In plain words
What the numbers say
- Recommended 240 works worth ₹12.81 Cr, a fund utilisation of 87%, higher than 69% of 18th Lok Sabha MPs.
- The district has sanctioned 185 of them, taking 3.6 months on average.
- ₹6.74 Cr has been paid to vendors, 46% of the allocation.
- 48 works are complete, typically 14.2 months after recommendation. 48 works have geo-tagged photos on eSAKSHI.
- The largest share of funds went to Community buildings & public spaces.
- Payments went to 119 vendors. The largest received 3.3%.
- No citizen ratings have been reported for completed works.
How the score is made
MP score 55/100: finishing works counts most
- Works completed 30%20Completed ÷ recommended works.
- Spending efficiency 20%34Value of completed works ÷ money paid out. Money paid without works finished scores low.
- Fund utilisation 15%87Value of works recommended ÷ allocated limit (MoSPI’s measure).
- Proof of work 15%100Share of completed works with photos or documents uploaded on eSAKSHI.
- Funds spent 10%46Paid to vendors ÷ allocated limit.
- Vendor diversity 10%100How spread out payments are: full marks when no vendor gets over 20% of the money, none when one vendor gets everything.
i
Members of Parliament (MPs) do not have direct, operational control over the specific vendors selected for government public works. However, they exert significant indirect influence by shaping procurement frameworks, passing supplier diversity laws, and conducting oversight.
Largest vendor: GRAM PANCHAYAT HALLOOR, 3.3% of payments across 119 vendors.
District sanction speed
86/100 · sanction is the district authority’s job, so this doesn’t change the MP’s rank
- Sanction speed 100%86Average days to sanction (full marks within the 45-day guideline, none at a year), and the share of works not overdue.
Activity over time
Recommendations, payments and completions by month
Sectors
Value of works by category
Who got paid
Top vendors by payments received
Implementing district authorities
The districts that sanction and execute this MP’s works
Works
240 works · the 60 most recent are listed here, all of them in the explorer · tap “Photos” to see geo-tagged photos from eSAKSHI
nagar panchayat sukma devgudi ke samip sanskritik bhavan nirman karya
Community buildings & public spacesConstruction of buildings for community cultural activities· Sukma· #160982
₹5.0 L Completed 14 Oct 2026Rec. 23 Dec 2024Paid ₹5.0 Lsunnam guda se bater para tak 270 metre c.c. sadak nirman karya
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Sukma· #209912
₹9.9 L Completed 14 Oct 2026Rec. 17 Jun 2025Paid ₹9.9 Lgram panchayat mageda me Budhi mata mandir ke samip shed nirman kary
Community buildings & public spacesConstruction of common work sheds / common covered sitting area· Kondagaon· #294316
₹8.0 L Sanctioned · 12 Oct 2026Rec. 25 Jul 2026gram panchayat gudra se ganjenar pahunch marg par 02 metre span puliya nirman karya
Roads & bridgesConstruction of culverts and bridges· Sukma· #145568
₹6.9 L Completed 8 Oct 2026Rec. 4 Oct 2024Paid ₹6.9 Lgram panchayat gudra me 150 metre c.c.road nirman karya
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Sukma· #145571
₹5.0 L Completed 8 Oct 2026Rec. 4 Oct 2024Paid ₹5.0 Lgram netanar me main road se patelpara tak 300 metre c.c. sadak nirman karya
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Sukma· #209920
₹9.8 L Completed 7 Oct 2026Rec. 17 Jun 2025Paid ₹9.8 LA 3,000-liter capacity two-wheeled water tanker for drinking water supply in Gram Panchayat Rampal.
Drinking waterPurchase of mobile water tankers· Bastar· #289557
₹1.8 L Sanctioned · 6 Oct 2026Rec. 27 Jun 2026A 3,000-liter capacity two-wheeled water tanker for drinking water supply in Gram Panchayat Amaguda.
Drinking waterPurchase of mobile water tankers· Bastar· #289558
₹1.8 L Sanctioned · 6 Oct 2026Rec. 27 Jun 2026A 3,000-liter capacity two-wheeled water tanker for drinking water supply in Gram Panchayat Ghatpadmoor.
Drinking waterPurchase of mobile water tankers· Bastar· #289559
₹1.8 L Sanctioned · 6 Oct 2026Rec. 27 Jun 2026A 3,000-liter capacity two-wheeled water tanker for drinking water supply in Gram Panchayat Dhaniyaloor.
Drinking waterPurchase of mobile water tankers· Bastar· #289560
₹1.8 L Sanctioned · 6 Oct 2026Rec. 27 Jun 2026A 3,000-liter capacity two-wheeled water tanker for drinking water supply in Gram Panchayat Kakarwada.
Drinking waterPurchase of mobile water tankers· Bastar· #289561
₹1.8 L Sanctioned · 6 Oct 2026Rec. 27 Jun 2026bell metal arts kary hetu shed nirman kary
Community buildings & public spacesConstruction of common work sheds / common covered sitting area· Bastar· #294318
₹6.0 L Vendor Identification · 6 Oct 2026Rec. 25 Jul 2026Paid ₹3.0 LConstruction of a 150-meter CC road in Village Balikonta from Lakhmu's house (near the borewell) to Dasha's house.
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Bastar· #298920
₹4.8 L Time Estimation · 6 Oct 2026Rec. 25 Jul 2026Construction of a 150-meter concrete road from the main road to Siyaram Sahu's house in Morthpal, a dependent village of Gram Panchayat Garvandkhurd.
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Bastar· #298921
₹4.8 L Vendor Identification · 6 Oct 2026Rec. 25 Jul 2026Paid ₹2.4 Lnagar panchayat dornapal hetu 02 chakka 3500 letre ke 02 nag pani tanker praday karne hetu
Drinking waterPurchase of mobile water tankers· Sukma· #197088
₹3.5 L Completed 5 Oct 2026Rec. 17 May 2025Paid ₹3.5 L
18th Lok Sabha MPs from Chhattisgarh
Ranked by MP score
| # | MP | Utilisation | Spent | Completed | Score |
|---|---|---|---|---|---|
| 1 | Kamlesh Jangde · Janjgir Champa | 92% | 68% | 261 | 79 |
| 2 | Jyotsna Charandas Mahant · Korba | 84% | 51% | 152 | 68 |
| 3 | Radhe Shyam Rathiya · Raigarh | 87% | 55% | 77 | 67 |
| 4 | Roop Kumari Choudhary · Mahasamund | 80% | 54% | 82 | 64 |
| 5 | Santosh Pandey · Rajnandgaon | 59% | 46% | 74 | 60 |
| 6 | Vijay Baghel · Durg | 96% | 50% | 71 | 59 |
| 7 | Chintamani Maharaj · Sarguja | 70% | 45% | 94 | 57 |
| 8 | Mahesh Kashyap · Bastar | 87% | 46% | 48 | 55 |
| 9 | Tokhan Sahu · Bilaspur | 72% | 40% | 46 | 55 |
| 10 | Brijmohan Agrawal · Raipur | 87% | 47% | 38 | 52 |
| 11 | Bhojraj Nag · Kanker | 49% | 24% | 31 | 51 |
Source: MoSPI eSAKSHI (eSAKSHI API (mplads.mospi.gov.in)). Fund utilisation = works recommended ÷ allocated limit (MoSPI’s definition); spent = vendor payments ÷ allocated limit; completion = completed ÷ recommended works. The MP score weighs completion, spending efficiency, utilisation, proof of work, spending and vendor diversity. How it’s calculated.