MPLADS report card · Rajya Sabha

Shri R. Dharmar

Rajya SabhaAIADMKTerm 2022–2028Tamil Nadu

MP score86/1007th of 235 in the Rajya Sabha
2nd of 19 from Tamil Nadu

Allocated limit

₹26.44 Cr

Median ₹14.70 Cr

Fund utilisation

83%

₹21.92 Cr recommended · 200 works
Above median (70%)

Paid to vendors

₹20.79 Cr

79% of allocation
Above median (25%)

Works completed

193

97% of recommended
Above median (26%)

From recommendation to completion

Every work this MP recommended, by stage

  1. Recommended by the MP200 works

    ₹21.92 Cr · 83% of the ₹26.44 Cr allocated

  2. Sanctioned by the district194 works

    97% sanctioned · took 2.5 months on average (due within 45 days)

  3. Completed193 works

    ₹20.69 Cr final cost · 4.6 months from recommendation on average

6 works are still awaiting sanction, 6 of them for more than 45 days.

In plain words

What the numbers say

  • Recommended 200 works worth ₹21.92 Cr, a fund utilisation of 83%, higher than 66% of Rajya Sabha MPs.
  • The district has sanctioned 194 of them, taking 2.5 months on average.
  • ₹20.79 Cr has been paid to vendors, 79% of the allocation.
  • 193 works are complete, typically 4.6 months after recommendation. 113 works have geo-tagged photos on eSAKSHI.
  • The largest share of funds went to Roads & bridges.
  • Payments went to 19 vendors. The largest received 36%.
  • No citizen ratings have been reported for completed works.

How the score is made

MP score 86/100: finishing works counts most

  1. Works completed 30%97Completed ÷ recommended works.
  2. Spending efficiency 20%100Value of completed works ÷ money paid out. Money paid without works finished scores low.
  3. Fund utilisation 15%83Value of works recommended ÷ allocated limit (MoSPI’s measure).
  4. Proof of work 15%59Share of completed works with photos or documents uploaded on eSAKSHI.
  5. Funds spent 10%79Paid to vendors ÷ allocated limit.
  6. Vendor diversity 10%
    i

    Members of Parliament (MPs) do not have direct, operational control over the specific vendors selected for government public works. However, they exert significant indirect influence by shaping procurement frameworks, passing supplier diversity laws, and conducting oversight.

    79
    How spread out payments are: full marks when no vendor gets over 20% of the money, none when one vendor gets everything.

Largest vendor: LUCKY ASSOCIATES, 36% of payments across 19 vendors.

District sanction speed

93/100 · sanction is the district authority’s job, so this doesn’t change the MP’s rank

  1. Sanction speed 100%93Average days to sanction (full marks within the 45-day guideline, none at a year), and the share of works not overdue.

Activity over time

Recommendations, payments and completions by month

Value of works MPs recommended each month

Who got paid

Top vendors by payments received

Implementing district authorities

The districts that sanction and execute this MP’s works

Works

200 works · the 60 most recent are listed here, all of them in the explorer · tap “Photos” to see geo-tagged photos from eSAKSHI

Open in explorer
  • Supply of Lab Equipments to Govt Higher Secondary School Velanandal Panchayat

    Education & librariesSetting up of laboratories· Tiruvannamalai· #254298

    ₹6.3 L Completed 2 Sept 2026Rec. 16 Dec 2025Paid ₹6.3 L
  • Supply of Lab Equipments to Govt Higher SecondarySchool,Andampallam Panchayat

    Education & librariesSetting up of laboratories· Tiruvannamalai· #254299

    ₹6.3 L Completed 2 Sept 2026Rec. 16 Dec 2025Paid ₹6.3 L
  • Supply of Lab Equipments to GovtHigher Secondary School SU Valavettu Panchayat

    Education & librariesSetting up of laboratories· Tiruvannamalai· #254300

    ₹6.3 L Completed 2 Sept 2026Rec. 16 Dec 2025Paid ₹6.3 L
  • Supply of Lab Equipments to GovtHigher Secondary School Kolakkudi Panchayat

    Education & librariesSetting up of laboratories· Tiruvannamalai· #254301

    ₹6.3 L Completed 2 Sept 2026Rec. 16 Dec 2025Paid ₹6.3 L
  • Construction of Drama stage at Nallur village in Nallur Panchyat

    Community buildings & public spacesConstruction of buildings for community cultural activities· Ramanathapuram· #203219

    ₹10.0 L Physical Inspection · 22 Jun 2026Rec. 26 May 2025Paid ₹10.0 L
  • Construction of flood production wall in Maruchikattikulam tank in weir Sendamangalam village Melaneelidanallur union at Tenkasi District

    Irrigation, flood & environmentConstruction of flood control embankments/protection walls along riverbanks, hilltops, roadsides· Tenkasi· #283768

    ₹25.0 L Awaiting sanction · 142 daysRec. 12 Jun 2026
  • Construction of flood production wall in Pappankal L.S.1600 M Kadayanallur village Kadayanallur union at Tenkasi District

    Irrigation, flood & environmentConstruction of flood control embankments/protection walls along riverbanks, hilltops, roadsides· Tenkasi· #283769

    ₹25.0 L Awaiting sanction · 142 daysRec. 12 Jun 2026
  • Construction of flood production wall in Pappankal channelL.S.2150 M (Mukku Marichan) Kadayanallur villageKadayanallur union at Tenkasi District

    Irrigation, flood & environmentConstruction of flood control embankments/protection walls along riverbanks, hilltops, roadsides· Tenkasi· #283770

    ₹25.0 L Awaiting sanction · 142 daysRec. 12 Jun 2026
  • Construction of flood production wall in Pappankal channel L.S.2200 M (Mukku Marichan) Kadayanallur village Kadayanallur union at Tenkasi District

    Irrigation, flood & environmentConstruction of flood control embankments/protection walls along riverbanks, hilltops, roadsides· Tenkasi· #283771

    ₹25.0 L Awaiting sanction · 142 daysRec. 12 Jun 2026
  • Providing paver block,culvert at sangaranppan patti.

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Ramanathapuram· #218537

    ₹20.0 L Completed 14 May 2026Rec. 15 Jul 2025Paid ₹20.0 L
  • Construction of Bus shelter at Melakannicheri village in Melakannicheri Panchyat.

    Community buildings & public spacesConstruction of bus-sheds or bus-stops· Ramanathapuram· #204272

    ₹5.5 L Completed 24 Mar 2026Rec. 10 Jun 2025Paid ₹5.5 L
  • Construction of body wall and apron in surplus weir of Sayamalai tank at sayamalai village in kuruvikulam union Tenkasi District

    Irrigation, flood & environmentConstruction of flood control embankments/protection walls along riverbanks, hilltops, roadsides· Tenkasi· #253740

    ₹24.9 L Completed 23 Feb 2026Rec. 20 Dec 2025Paid ₹24.9 L
  • Construction of flood production wall in surplus weir of Sayamalai tank at sayamalai village in kuruvikulam union Tenkasi District

    Irrigation, flood & environmentConstruction of flood control embankments/protection walls along riverbanks, hilltops, roadsides· Tenkasi· #253741

    ₹25.0 L Completed 23 Feb 2026Rec. 20 Dec 2025Paid ₹25.0 L
  • Constructio of cut off wall and apron in weir no.2 in echantha periyakulam tank.in echantha village

    Irrigation, flood & environmentConstruction of flood control embankments/protection walls along riverbanks, hilltops, roadsides· Tenkasi· #253742

    ₹24.7 L Completed 23 Feb 2026Rec. 20 Dec 2025Paid ₹24.7 L
  • Construction of flood production wall in weir No.1 in Echantha periyakulam tank Echantha village in Melaneelidanallur union, Tenkasi District

    Irrigation, flood & environmentConstruction of flood control embankments/protection walls along riverbanks, hilltops, roadsides· Tenkasi· #253743

    ₹24.8 L Completed 23 Feb 2026Rec. 20 Dec 2025Paid ₹24.8 L

Rajya Sabha MPs from Tamil Nadu

Ranked by MP score

Compare
#MPUtilisationSpentCompletedScore
1Shri S. Kalyanasundaram99%86%16687
2Shri R. Dharmar83%79%19386
3Shri K.R.N. Rajeshkumar77%64%8582
4Dr. M. Dhanapal58%27%2764
5Shri R. Girirajan96%71%15564
6Shri Ilaiyaraaja24%21%1761
7Shri I.S. Inbadurai80%24%2560
8Shri P. Chidambaram86%58%7660
9Shri S.R. Sivalingam67%35%2455
10Smt. Rajathi69%26%1653
11Dr. M. Thambi Durai9.2%2.6%242
12Shri P. Wilson86%11%131

Source: MoSPI eSAKSHI (eSAKSHI API (mplads.mospi.gov.in)). Fund utilisation = works recommended ÷ allocated limit (MoSPI’s definition); spent = vendor payments ÷ allocated limit; completion = completed ÷ recommended works. The MP score weighs completion, spending efficiency, utilisation, proof of work, spending and vendor diversity. How it’s calculated.