Allocated limit
₹24.21 Cr
Median ₹14.70 Cr
Fund utilisation
77%
₹18.64 Cr recommended · 102 works
Above median (70%)
Paid to vendors
₹15.53 Cr
64% of allocation
Above median (25%)
Works completed
85
83% of recommended
Above median (26%)
From recommendation to completion
Every work this MP recommended, by stage
- Recommended by the MP102 works
₹18.64 Cr · 77% of the ₹24.21 Cr allocated
- Sanctioned by the district102 works
100% sanctioned · took 2.4 months on average (due within 45 days)
- Completed85 works
₹13.19 Cr final cost · 8.7 months from recommendation on average
In plain words
What the numbers say
- Recommended 102 works worth ₹18.64 Cr, a fund utilisation of 77%, higher than 56% of Rajya Sabha MPs.
- The district has sanctioned 102 of them, taking 2.4 months on average.
- ₹15.53 Cr has been paid to vendors, 64% of the allocation.
- 85 works are complete, typically 8.7 months after recommendation. 70 works have geo-tagged photos on eSAKSHI.
- The largest share of funds went to Community buildings & public spaces.
- Payments went to 56 vendors. The largest received 15%.
- No citizen ratings have been reported for completed works.
How the score is made
MP score 82/100: finishing works counts most
- Works completed 30%83Completed ÷ recommended works.
- Spending efficiency 20%85Value of completed works ÷ money paid out. Money paid without works finished scores low.
- Fund utilisation 15%77Value of works recommended ÷ allocated limit (MoSPI’s measure).
- Proof of work 15%82Share of completed works with photos or documents uploaded on eSAKSHI.
- Funds spent 10%64Paid to vendors ÷ allocated limit.
- Vendor diversity 10%100How spread out payments are: full marks when no vendor gets over 20% of the money, none when one vendor gets everything.
i
Members of Parliament (MPs) do not have direct, operational control over the specific vendors selected for government public works. However, they exert significant indirect influence by shaping procurement frameworks, passing supplier diversity laws, and conducting oversight.
Largest vendor: MOOKAMBIKA CONSTRUCTION, 15% of payments across 56 vendors.
District sanction speed
96/100 · sanction is the district authority’s job, so this doesn’t change the MP’s rank
- Sanction speed 100%96Average days to sanction (full marks within the 45-day guideline, none at a year), and the share of works not overdue.
Activity over time
Recommendations, payments and completions by month
Sectors
Value of works by category
Who got paid
Top vendors by payments received
Implementing district authorities
The districts that sanction and execute this MP’s works
Works
102 works · the 60 most recent are listed here, all of them in the explorer · tap “Photos” to see geo-tagged photos from eSAKSHI
Construction of cement road at Ward No. 10, Kalyan No. 02, Mohanur Town Panchayat
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Namakkal· #254196
₹4.6 L Completed 9 Oct 2026Rec. 19 Dec 2025Paid ₹4.6 LConstruction of second floor of community hall under construction at Villivakkam CITCO Nagar, Chennai District.
Community buildings & public spacesConstruction of community centers and community halls· Chennai· #134188
₹50.0 L Work partially Completed · 25 Aug 2026Rec. 2 Aug 2024Paid ₹49.9 LConstruction of OHT capacity of 60000 liters in the old ward 8th ward new ward 20 of Pallapatti municipality in Karur district.
Drinking waterConstruction of water tanks· Karur· #213255
₹15.2 L Completed 17 Aug 2026Rec. 3 Jul 2025Paid ₹15.2 LConstruction of New Anganwadi building at Anna Colony H/o Athanoor Town panchayat
Education & librariesConstruction of buildings for crèches and anganwadies· Namakkal· #148073
₹18.5 L Completed 10 Aug 2026Rec. 17 Oct 2024Paid ₹18.5 LConstruction of OHT tank in ward no. 26, Chettiyannan Street, Rasipuram municipality.
Drinking waterConstruction of water tanks· Namakkal· #218139
₹7.0 L Completed 5 Aug 2026Rec. 14 Jul 2025Paid ₹7.0 LConstruction of bus stand and satffs room at Dr. Besant Road, Vivekananda House, Ward No. 116, Chepauk, Thiruvallikeni Assembly Constituency
Community buildings & public spacesConstruction of bus-sheds or bus-stops· Chennai· #181930
₹50.0 L Physical Inspection · 27 Jul 2026Rec. 17 Mar 2025Paid ₹49.5 LInstallation of two high mass streetlights near the Maruthakali Amman Temple in Namakkal Corporation- 2 No
Electricity & lightingLighting of public spaces· Namakkal· #256208
₹4.0 L Completed 21 Jul 2026Rec. 30 Dec 2025Paid ₹4.0 LConstruction of New Anganwadi building at Ward 13 Kadai veethi H/o Mohanur Town Panchayat
Education & librariesConstruction of buildings for crèches and anganwadies· Namakkal· #148075
₹18.0 L Completed 10 Jul 2026Rec. 17 Oct 2024Paid ₹18.0 LConstruction of a new Anganwadi center at the municipal primary school on Anna Street in Ward No. 27 of the Rasipuram municipality
Education & librariesConstruction of buildings for crèches and anganwadies· Namakkal· #218138
₹16.0 L Completed 10 Jul 2026Rec. 14 Jul 2025Paid ₹16.0 LConstruction of protection wall at SF number 31 1 sundarangi Palayam Malayalam road Hamlet of Warangal
Irrigation, flood & environmentConstruction of flood control embankments/protection walls along riverbanks, hilltops, roadsides· Namakkal· #259902
₹5.0 L Completed 14 May 2026Rec. 19 Jan 2026Paid ₹5.0 LConstruction of 30000L OHT tank (12 m) in Alavaipatti Panchayat of Vennandur Panchayat Union.
Drinking waterConstruction of water tanks· Namakkal· #228309
₹19.0 L Completed 13 May 2026Rec. 22 Aug 2025Paid ₹19.0 LProviding Earthern Bund and other facilities to Edapalayam Lake adjacent to Cuddalore-Chittoor Road in Tiruvannamalai
Irrigation, flood & environmentConstruction of public irrigation facilities· Tiruvannamalai· #129056
₹1.00 Cr Completed 12 May 2026Rec. 15 Mar 2024Paid ₹1.00 CrConstruction of a new building for the dilapidated old Anganwadi Center in A.S. Pettai, Ward No. 17, Namakkal Corporation
Education & librariesConstruction of buildings for crèches and anganwadies· Namakkal· #170399
₹16.0 L Completed 8 May 2026Rec. 6 Feb 2025Paid ₹16.0 LConstruction of a 10000L capacity OHT tank at the Government Girls Higher Secondary School under Namakkal Corporation
Drinking waterConstruction of water tanks· Namakkal· #231545
₹9.0 L Completed 8 May 2026Rec. 5 Sep 2025Paid ₹9.0 LConstruction of Compound wall and cement road for the public Toilets at Ward No. 17, Varadhan Street, Rasipuram Municipality
Community buildings & public spacesConstruction of boundary walls of existing public and community buildings· Namakkal· #190606
₹4.5 L Completed 5 May 2026Rec. 11 Apr 2025Paid ₹4.5 L
Rajya Sabha MPs from Tamil Nadu
Ranked by MP score
| # | MP | Utilisation | Spent | Completed | Score |
|---|---|---|---|---|---|
| 1 | Shri S. Kalyanasundaram | 99% | 86% | 166 | 87 |
| 2 | Shri R. Dharmar | 83% | 79% | 193 | 86 |
| 3 | Shri K.R.N. Rajeshkumar | 77% | 64% | 85 | 82 |
| 4 | Dr. M. Dhanapal | 58% | 27% | 27 | 64 |
| 5 | Shri R. Girirajan | 96% | 71% | 155 | 64 |
| 6 | Shri Ilaiyaraaja | 24% | 21% | 17 | 61 |
| 7 | Shri I.S. Inbadurai | 80% | 24% | 25 | 60 |
| 8 | Shri P. Chidambaram | 86% | 58% | 76 | 60 |
| 9 | Shri S.R. Sivalingam | 67% | 35% | 24 | 55 |
| 10 | Smt. Rajathi | 69% | 26% | 16 | 53 |
| 11 | Dr. M. Thambi Durai | 9.2% | 2.6% | 2 | 42 |
| 12 | Shri P. Wilson | 86% | 11% | 1 | 31 |
Source: MoSPI eSAKSHI (eSAKSHI API (mplads.mospi.gov.in)). Fund utilisation = works recommended ÷ allocated limit (MoSPI’s definition); spent = vendor payments ÷ allocated limit; completion = completed ÷ recommended works. The MP score weighs completion, spending efficiency, utilisation, proof of work, spending and vendor diversity. How it’s calculated.