Skip to content
MPLADSTracker
This is a record from the 17th Lok Sabha (2019–24). eSAKSHI covers its final year only, from April 2023. Comparisons are with other 17th Lok Sabha MPs.

MPLADS report card · 17th Lok Sabha

Shri Nalin Kumar Kateel

Lok SabhaDakshina Kannada · Karnataka

MP score93/100103rd of 539 in the 17th Lok Sabha
3rd of 28 from Karnataka

Allocated limit

₹7.36 Cr

Median ₹8.60 Cr

Fund utilisation

99%

₹7.31 Cr recommended · 105 works
About the median

Paid to vendors

₹6.91 Cr

94% of allocation
Above median (88%)

Works completed

98

93% of recommended
Above median (83%)

From recommendation to completion

Every work this MP recommended, by stage

  1. Recommended by the MP105 works

    ₹7.31 Cr · 99% of the ₹7.36 Cr allocated

  2. Sanctioned by the district105 works

    100% sanctioned · took 5.2 months on average (due within 45 days)

  3. Completed98 works

    ₹6.81 Cr final cost · 12.1 months from recommendation on average

In plain words

What the numbers say

  • Recommended 105 works worth ₹7.31 Cr, a fund utilisation of 99%, higher than 66% of 17th Lok Sabha MPs.
  • The district has sanctioned 105 of them, taking 5.2 months on average.
  • ₹6.91 Cr has been paid to vendors, 94% of the allocation.
  • 98 works are complete, typically 12.1 months after recommendation. 92 works have geo-tagged photos on eSAKSHI.
  • The largest share of funds went to Roads & bridges.
  • Payments went to 41 vendors. The largest received 46%.
  • No citizen ratings have been reported for completed works.

How the score is made

MP score 93/100: finishing works counts most

  1. Works completed 30%93Completed ÷ recommended works.
  2. Spending efficiency 20%99Value of completed works ÷ money paid out. Money paid without works finished scores low.
  3. Fund utilisation 15%99Value of works recommended ÷ allocated limit (MoSPI’s measure).
  4. Proof of work 15%94Share of completed works with photos or documents uploaded on eSAKSHI.
  5. Funds spent 10%94Paid to vendors ÷ allocated limit.
  6. Vendor diversity 10%
    i

    Members of Parliament (MPs) do not have direct, operational control over the specific vendors selected for government public works. However, they exert significant indirect influence by shaping procurement frameworks, passing supplier diversity laws, and conducting oversight.

    67
    How spread out payments are: full marks when no vendor gets over 20% of the money, none when one vendor gets everything.

Largest vendor: D K NIRMITHI KENDRA, 46% of payments across 41 vendors.

District sanction speed

82/100 · sanction is the district authority’s job, so this doesn’t change the MP’s rank

  1. Sanction speed 100%82Average days to sanction (full marks within the 45-day guideline, none at a year), and the share of works not overdue.

Activity over time

Recommendations, payments and completions by month

Value of works MPs recommended each month

Who got paid

Top vendors by payments received

Implementing district authorities

The districts that sanction and execute this MP’s works

Works

105 works · the 60 most recent are listed here, all of them in the explorer · tap “Photos” to see geo-tagged photos from eSAKSHI

Open in explorer
  • Developement of Road to SC Colony at Nettilabalike, Neringana Panchayat of Ullal Taluk

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Dakshina Kannada· #107522

    ₹5.0 L Completed 13 Oct 2026Rec. 17 Feb 2024Paid ₹5.0 L
  • Development of Road at SC Janatha Colony of Bellandoor Village of Kadaba Taluk

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Dakshina Kannada· #108523

    ₹5.0 L Completed 15 Apr 2026Rec. 18 Feb 2024Paid ₹5.0 L
  • Continuation of Construction of School Building of Sandeepa Special School, Sullia.

    Education & librariesConstruction of rooms and halls in school and colleges· Dakshina Kannada· #111920

    ₹5.0 L Completed 7 Apr 2026Rec. 22 Feb 2024Paid ₹5.0 L
  • Construction of Retaining Wall near Malaraya Daivasthaan at Bolwar Ward of Puttur City

    Roads & bridgesConstruction of footpaths and pedestrian ways· Dakshina Kannada· #101546

    ₹10.0 L Completed 4 Feb 2026Rec. 9 Feb 2024Paid ₹10.0 L
  • Development of Road Between Adyattakanda kundadka SC Colony road at Peruvaje Village of Sullia Taluk

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Dakshina Kannada· #108526

    ₹10.0 L Completed 4 Feb 2026Rec. 18 Feb 2024Paid ₹10.0 L
  • Continuation work of Retaining Wall and Toilet block near Kondela Kondelthaya Daivastana at Kondemula Village, Kateel

    Roads & bridgesConstruction of footpaths and pedestrian ways· Dakshina Kannada· #102684

    ₹12.5 L Sanctioned · 8 Jan 2026Rec. 10 Feb 2024
  • Construction of Retaining Wall & Public Toilet Block near Kondela Kondelthaya Daivastana at Kondemula Village

    Sanitation & drainageConstruction of toilet blocks· Dakshina Kannada· #115216

    ₹15.0 L Completed 5 Dec 2025Rec. 26 Feb 2024Paid ₹15.0 L
  • Construction of Road from Kuttikala to Kallotte of Arala Village

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Dakshina Kannada· #100792

    ₹10.0 L Completed 26 Nov 2025Rec. 8 Feb 2024Paid ₹10.0 L
  • Laying of Flooring Tiles at Govt High School, Papemajalu of Ariyadka.

    Education & librariesConstruction of rooms and halls in school and colleges· Dakshina Kannada· #101638

    ₹2.5 L Completed 4 Oct 2025Rec. 9 Feb 2024Paid ₹2.5 L
  • Construction of Retaining Wall and Drainage near Narimogaru Junction Main Road of Mundoor Village, Puttur Taluk

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Dakshina Kannada· #108612

    ₹5.0 L Completed 4 Oct 2025Rec. 19 Feb 2024Paid ₹5.0 L
  • Development of ST Colony Road at Sulliapadavu Kannadka of Paduvannur Village, Puttur taluk

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Dakshina Kannada· #108487

    ₹5.0 L Completed 3 Oct 2025Rec. 18 Feb 2024Paid ₹5.0 L
  • Construction of Toilet block and Laying Interlock to Road near Baipadi Basadi

    Sanitation & drainageConstruction of toilet blocks· Dakshina Kannada· #101684

    ₹10.0 L Completed 24 Sept 2025Rec. 9 Feb 2024Paid ₹10.0 L
  • Development of Road at Karminadka Parpala ST Colony at Neriya Village of Belthangady Taluk

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Dakshina Kannada· #108534

    ₹5.0 L Completed 24 Sept 2025Rec. 18 Feb 2024Paid ₹5.0 L
  • Construction of Road Retaining Wall near Devandabetta Shri Laxmi Vishnumurthy Temple at Kallige Village

    Roads & bridgesConstruction of footpaths and pedestrian ways· Dakshina Kannada· #103869

    ₹2.5 L Completed 12 Aug 2025Rec. 13 Feb 2024Paid ₹2.5 L
  • Laying of Interlock at ST Colony at Gandi Gopal Naik House to Anil House at Ullal Municipality

    Roads & bridgesConstruction of footpaths and pedestrian ways· Dakshina Kannada· #108493

    ₹2.5 L Completed 6 Aug 2025Rec. 18 Feb 2024Paid ₹2.5 L

17th Lok Sabha MPs from Karnataka

Ranked by MP score

#MPUtilisationSpentCompletedScore
1Gowdar Mallikarjunappa Siddeshwara · Davanagere90%90%7297
2Parvatagouda Chandanagouda Gaddigoudar · Bagalkot98%93%14094
3Shri Nalin Kumar Kateel · Dakshina Kannada99%94%9893
4Doddaalahalli Kempegowda Suresh · Bangalore Rural99%99%8089
5Km Shobha Karandlaje · Udupi Chikmagalur100%90%16087
6Prajwal Revanna · Hassan87%80%20887
7V Srinivas Prasad · Chamarajanagar99%86%8886
8Pralhad Venkatesh Joshi · Dharwad100%70%10483
9Shri DV Sadananda Gowda · Bangalore North100%99%20483
10Shri Gangasandra Siddappa Basavaraj · Tumkur100%86%15481
11Shri B Y Raghavendra · Shimoga94%90%15780
12Bache BN Gowda · Chikballapur100%95%11680

Source: MoSPI eSAKSHI (eSAKSHI API (mplads.mospi.gov.in)). Fund utilisation = works recommended ÷ allocated limit (MoSPI’s definition); spent = vendor payments ÷ allocated limit; completion = completed ÷ recommended works. The MP score weighs completion, spending efficiency, utilisation, proof of work, spending and vendor diversity. How it’s calculated.