MPLADS report card · Rajya Sabha

Shri Khiru Mahto

Rajya SabhaJD(U)Term 2022–2028Bihar

MP score91/1001st of 235 in the Rajya Sabha
1st of 15 from Bihar

Allocated limit

₹23.58 Cr

Median ₹14.70 Cr

Fund utilisation

79%

₹18.59 Cr recommended · 177 works
Above median (70%)

Paid to vendors

₹18.46 Cr

78% of allocation
Above median (25%)

Works completed

171

97% of recommended
Above median (26%)

From recommendation to completion

Every work this MP recommended, by stage

  1. Recommended by the MP177 works

    ₹18.59 Cr · 79% of the ₹23.58 Cr allocated

  2. Sanctioned by the district177 works

    100% sanctioned · took 39 days on average (due within 45 days)

  3. Completed171 works

    ₹17.99 Cr final cost · 7.9 months from recommendation on average

In plain words

What the numbers say

  • Recommended 177 works worth ₹18.59 Cr, a fund utilisation of 79%, higher than 59% of Rajya Sabha MPs.
  • The district has sanctioned 177 of them, taking 39 days on average.
  • ₹18.46 Cr has been paid to vendors, 78% of the allocation.
  • 171 works are complete, typically 7.9 months after recommendation. 159 works have geo-tagged photos on eSAKSHI.
  • The largest share of funds went to Roads & bridges.
  • Payments went to 42 vendors. The largest received 26%.
  • No citizen ratings have been reported for completed works.

How the score is made

MP score 91/100: finishing works counts most

  1. Works completed 30%97Completed ÷ recommended works.
  2. Spending efficiency 20%97Value of completed works ÷ money paid out. Money paid without works finished scores low.
  3. Fund utilisation 15%79Value of works recommended ÷ allocated limit (MoSPI’s measure).
  4. Proof of work 15%93Share of completed works with photos or documents uploaded on eSAKSHI.
  5. Funds spent 10%78Paid to vendors ÷ allocated limit.
  6. Vendor diversity 10%
    i

    Members of Parliament (MPs) do not have direct, operational control over the specific vendors selected for government public works. However, they exert significant indirect influence by shaping procurement frameworks, passing supplier diversity laws, and conducting oversight.

    92
    How spread out payments are: full marks when no vendor gets over 20% of the money, none when one vendor gets everything.

Largest vendor: ASSISTANT ENGINEER FATUHA, 26% of payments across 42 vendors.

District sanction speed

100/100 · sanction is the district authority’s job, so this doesn’t change the MP’s rank

  1. Sanction speed 100%100Average days to sanction (full marks within the 45-day guideline, none at a year), and the share of works not overdue.

Activity over time

Recommendations, payments and completions by month

Value of works MPs recommended each month

Who got paid

Top vendors by payments received

Implementing district authorities

The districts that sanction and execute this MP’s works

Works

177 works · the 60 most recent are listed here, all of them in the explorer · tap “Photos” to see geo-tagged photos from eSAKSHI

Open in explorer
  • Construction of PCC road from Buddhadev Chak main road to the house of Ranjeet Kumar

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Patna· #275275

    ₹15.0 L Completed 12 May 2026Rec. 21 Mar 2026Paid ₹15.0 L
  • Construction of Pcc road from the house of Dhirendra Kumar to the Buddhadev Chak in ward no. 05

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Patna· #275276

    ₹10.0 L Completed 12 May 2026Rec. 21 Mar 2026Paid ₹10.0 L
  • Construction of PCC Road from the patna university Boys hostel towards patna College Gate

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Patna· #275277

    ₹14.9 L Completed 11 May 2026Rec. 21 Mar 2026Paid ₹14.9 L
  • Construction of PCC road from police post Patna university gate towards SESQUICENTENNIAL gate

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Patna· #275281

    ₹14.9 L Completed 11 May 2026Rec. 21 Mar 2026Paid ₹14.9 L
  • Construction of PCC road from patna science college gate towards patna university police post block

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Patna· #275279

    ₹15.0 L Completed 9 May 2026Rec. 21 Mar 2026Paid ₹15.0 L
  • Construction of PCC Road from Patna College SESQUICENTENNIAL gate towards backside of Faraday Hostel

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Patna· #275362

    ₹15.0 L Completed 9 May 2026Rec. 23 Mar 2026Paid ₹15.0 L
  • Construction of PCC Road from Patna University Gate to the backside of Faraday Hostel

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Patna· #275363

    ₹15.0 L Completed 9 May 2026Rec. 23 Mar 2026Paid ₹15.0 L
  • Construction of PCC road from the house of Pappu Singh to the house of Binod singh

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Patna· #272327

    ₹14.9 L Completed 10 Apr 2026Rec. 5 Mar 2026Paid ₹14.9 L
  • Construction of PCC road from the house of Basudeo Rai to the house of rohit rai in ward no. 15

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Patna· #272328

    ₹15.0 L Completed 10 Apr 2026Rec. 5 Mar 2026Paid ₹15.0 L
  • Construction of PCC road from the house of upendra Ram towards the house of Shankar Singh in ward no. 15

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Patna· #272329

    ₹15.0 L Completed 10 Apr 2026Rec. 5 Mar 2026Paid ₹15.0 L
  • Construction of PCC road from visar plant towards the house of Sudhir Kumar in ward no. 05

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Patna· #272330

    ₹10.0 L Completed 10 Apr 2026Rec. 5 Mar 2026Paid ₹10.0 L
  • Construction of PCC road from the house of Sudhir kumar towards the house of Mukesh Kumar

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Patna· #272331

    ₹15.0 L Completed 10 Apr 2026Rec. 5 Mar 2026Paid ₹15.0 L
  • Construction of PCC road from the house of Mukesh jee towards the boundary of Dhirendra Kumar

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Patna· #272332

    ₹10.0 L Completed 10 Apr 2026Rec. 5 Mar 2026Paid ₹10.0 L
  • CONSTRUCTION OF PCC ROAD FROM AJAY YADAV HOUSE TO PANKAJ YADAV HOUSE IN TIKARAMPUR PANCHAYAT

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Munger· #43930

    ₹3.9 L Completed 25 Mar 2026Rec. 2 Nov 2023Paid ₹3.9 L
  • Construction of PCC road from examination building to to Rajendra Prasad multipurpose building in A.N college

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Patna· #272279

    ₹14.9 L Completed 25 Mar 2026Rec. 4 Mar 2026Paid ₹14.9 L

Rajya Sabha MPs from Bihar

Ranked by MP score

Compare
#MPUtilisationSpentCompletedScore
1Shri Khiru Mahto79%78%17191
2Dr. Bhim Singh98%89%25280
3Dr. Dharmshila Gupta100%82%9679
4Shri Satish Chandra Dubey98%77%19375
5Shri Shambhu Sharan Patel96%78%20375
6Shri Akhilesh Prasad Singh43%34%4773
7Dr. Faiyaz Ahmad100%86%13872
8Prof. Manoj Kumar Jha97%49%11063
9Shri Manan Kumar Mishra37%18%3156
10Shri Sanjay Kumar Jha3.4%2.7%452
11Shri Ram Nath Thakur82%6.5%126
12Shri Sanjay Yadav43%0%09

Source: MoSPI eSAKSHI (eSAKSHI API (mplads.mospi.gov.in)). Fund utilisation = works recommended ÷ allocated limit (MoSPI’s definition); spent = vendor payments ÷ allocated limit; completion = completed ÷ recommended works. The MP score weighs completion, spending efficiency, utilisation, proof of work, spending and vendor diversity. How it’s calculated.