2nd of 15 from Bihar
Allocated limit
₹18.62 Cr
Median ₹14.70 Cr
Fund utilisation
98%
₹18.19 Cr recommended · 323 works
Above median (70%)
Paid to vendors
₹16.48 Cr
89% of allocation
Above median (25%)
Works completed
252
78% of recommended
Above median (26%)
From recommendation to completion
Every work this MP recommended, by stage
- Recommended by the MP323 works
₹18.19 Cr · 98% of the ₹18.62 Cr allocated
- Sanctioned by the district316 works
98% sanctioned · took 2.1 months on average (due within 45 days)
- Completed252 works
₹11.90 Cr final cost · 6.1 months from recommendation on average
7 works are still awaiting sanction, 6 of them for more than 45 days.
In plain words
What the numbers say
- Recommended 323 works worth ₹18.19 Cr, a fund utilisation of 98%, higher than 86% of Rajya Sabha MPs.
- The district has sanctioned 316 of them, taking 2.1 months on average.
- ₹16.48 Cr has been paid to vendors, 89% of the allocation.
- 252 works are complete, typically 6.1 months after recommendation. 203 works have geo-tagged photos on eSAKSHI.
- The largest share of funds went to Roads & bridges.
- Payments went to 39 vendors. The largest received 49%.
- No citizen ratings have been reported for completed works.
How the score is made
MP score 80/100: finishing works counts most
- Works completed 30%78Completed ÷ recommended works.
- Spending efficiency 20%72Value of completed works ÷ money paid out. Money paid without works finished scores low.
- Fund utilisation 15%98Value of works recommended ÷ allocated limit (MoSPI’s measure).
- Proof of work 15%81Share of completed works with photos or documents uploaded on eSAKSHI.
- Funds spent 10%89Paid to vendors ÷ allocated limit.
- Vendor diversity 10%64How spread out payments are: full marks when no vendor gets over 20% of the money, none when one vendor gets everything.
i
Members of Parliament (MPs) do not have direct, operational control over the specific vendors selected for government public works. However, they exert significant indirect influence by shaping procurement frameworks, passing supplier diversity laws, and conducting oversight.
Largest vendor: VEDIKA SINGH, 49% of payments across 39 vendors.
District sanction speed
96/100 · sanction is the district authority’s job, so this doesn’t change the MP’s rank
- Sanction speed 100%96Average days to sanction (full marks within the 45-day guideline, none at a year), and the share of works not overdue.
Activity over time
Recommendations, payments and completions by month
Sectors
Value of works by category
Who got paid
Top vendors by payments received
Implementing district authorities
The districts that sanction and execute this MP’s works
Works
323 works · the 60 most recent are listed here, all of them in the explorer · tap “Photos” to see geo-tagged photos from eSAKSHI
Construction work of 20 feet x 15 feet covered Community Chaupal Rural
Community buildings & public spacesConstruction of common work sheds / common covered sitting area· Vaishali· #134650
₹5.2 L Completed 29 Oct 2026Rec. 5 Aug 2024Paid ₹5.2 LRoad construction work
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Patna· #281467
₹14.9 L Completed 2 Oct 2026Rec. 18 May 2026Paid ₹14.9 LRoad construction work
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Patna· #281468
₹14.9 L Completed 2 Oct 2026Rec. 18 May 2026Paid ₹14.9 LRoad and drain construction work
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Patna· #281469
₹14.9 L Completed 2 Oct 2026Rec. 18 May 2026Paid ₹14.9 LRoad and drain construction work
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Patna· #281470
₹7.4 L Completed 2 Oct 2026Rec. 18 May 2026Paid ₹7.4 LRoad construction
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Patna· #283780
₹14.9 L Completed 2 Oct 2026Rec. 26 May 2026Paid ₹14.9 LRoad construction
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Patna· #283781
₹14.9 L Completed 2 Oct 2026Rec. 26 May 2026Paid ₹14.9 LConstruction of road
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Patna· #284196
₹14.8 L Completed 2 Oct 2026Rec. 28 May 2026Paid ₹14.8 LConstruction of PCC road and covered drain
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Patna· #288819
₹14.8 L Completed 1 Oct 2026Rec. 24 Jun 2026Paid ₹14.8 Lroom Construction
Community buildings & public spacesConstruction of additional rooms and halls in the existing public and community building· Patna· #318805
₹10.0 L Awaiting sanction · 34 daysRec. 28 Sep 2026Construction of road and drain
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Patna· #273092
₹15.0 L Completed 23 Sept 2026Rec. 8 Mar 2026Paid ₹15.0 LConstruction of road and drain
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Patna· #273093
₹14.5 L Completed 23 Sept 2026Rec. 8 Mar 2026Paid ₹14.5 LConstruction of road and drain
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Patna· #273094
₹15.0 L Completed 23 Sept 2026Rec. 8 Mar 2026Paid ₹15.0 LConstruction of road and drain
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Patna· #273095
₹11.9 L Completed 23 Sept 2026Rec. 8 Mar 2026Paid ₹11.9 LConstruction of road and drain
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Patna· #273096
₹7.5 L Completed 23 Sept 2026Rec. 8 Mar 2026Paid ₹7.5 L
Rajya Sabha MPs from Bihar
Ranked by MP score
| # | MP | Utilisation | Spent | Completed | Score |
|---|---|---|---|---|---|
| 1 | Shri Khiru Mahto | 79% | 78% | 171 | 91 |
| 2 | Dr. Bhim Singh | 98% | 89% | 252 | 80 |
| 3 | Dr. Dharmshila Gupta | 100% | 82% | 96 | 79 |
| 4 | Shri Satish Chandra Dubey | 98% | 77% | 193 | 75 |
| 5 | Shri Shambhu Sharan Patel | 96% | 78% | 203 | 75 |
| 6 | Shri Akhilesh Prasad Singh | 43% | 34% | 47 | 73 |
| 7 | Dr. Faiyaz Ahmad | 100% | 86% | 138 | 72 |
| 8 | Prof. Manoj Kumar Jha | 97% | 49% | 110 | 63 |
| 9 | Shri Manan Kumar Mishra | 37% | 18% | 31 | 56 |
| 10 | Shri Sanjay Kumar Jha | 3.4% | 2.7% | 4 | 52 |
| 11 | Shri Ram Nath Thakur | 82% | 6.5% | 1 | 26 |
| 12 | Shri Sanjay Yadav | 43% | 0% | 0 | 9 |
Source: MoSPI eSAKSHI (eSAKSHI API (mplads.mospi.gov.in)). Fund utilisation = works recommended ÷ allocated limit (MoSPI’s definition); spent = vendor payments ÷ allocated limit; completion = completed ÷ recommended works. The MP score weighs completion, spending efficiency, utilisation, proof of work, spending and vendor diversity. How it’s calculated.