Skip to content
MPLADSTracker
This is a record from the 17th Lok Sabha (2019–24). eSAKSHI covers its final year only, from April 2023. Comparisons are with other 17th Lok Sabha MPs.

MPLADS report card · 17th Lok Sabha

Khagen Murmu

Lok SabhaMaldaha Uttar · West Bengal

MP score79/100359th of 539 in the 17th Lok Sabha
36th of 42 from West Bengal
Re-elected to the 18th Lok Sabha Then: 26% utilisation, 7 works completed, score 49.

Allocated limit

₹6.35 Cr

Median ₹8.60 Cr

Fund utilisation

100%

₹6.35 Cr recommended · 257 works
About the median

Paid to vendors

₹3.59 Cr

57% of allocation
Below median (88%)

Works completed

144

56% of recommended
Below median (83%)

From recommendation to completion

Every work this MP recommended, by stage

  1. Recommended by the MP257 works

    ₹6.35 Cr · 100% of the ₹6.35 Cr allocated

  2. Sanctioned by the district234 works

    91% sanctioned · took 9.3 months on average (due within 45 days)

  3. Completed144 works

    ₹3.03 Cr final cost · 18.6 months from recommendation on average

23 works are still awaiting sanction, 23 of them for more than 45 days.

In plain words

What the numbers say

  • Recommended 257 works worth ₹6.35 Cr, a fund utilisation of 100%, higher than 87% of 17th Lok Sabha MPs.
  • The district has sanctioned 234 of them, taking 9.3 months on average.
  • ₹3.59 Cr has been paid to vendors, 57% of the allocation.
  • 144 works are complete, typically 18.6 months after recommendation. 142 works have geo-tagged photos on eSAKSHI.
  • The largest share of funds went to Electricity & lighting.
  • Payments went to 80 vendors. The largest received 11%.
  • No citizen ratings have been reported for completed works.

How the score is made

MP score 79/100: finishing works counts most

  1. Works completed 30%56Completed ÷ recommended works.
  2. Spending efficiency 20%84Value of completed works ÷ money paid out. Money paid without works finished scores low.
  3. Fund utilisation 15%100Value of works recommended ÷ allocated limit (MoSPI’s measure).
  4. Proof of work 15%99Share of completed works with photos or documents uploaded on eSAKSHI.
  5. Funds spent 10%57Paid to vendors ÷ allocated limit.
  6. Vendor diversity 10%
    i

    Members of Parliament (MPs) do not have direct, operational control over the specific vendors selected for government public works. However, they exert significant indirect influence by shaping procurement frameworks, passing supplier diversity laws, and conducting oversight.

    100
    How spread out payments are: full marks when no vendor gets over 20% of the money, none when one vendor gets everything.

Largest vendor: ASREFA ENTERPRISE, 11% of payments across 80 vendors.

District sanction speed

58/100 · sanction is the district authority’s job, so this doesn’t change the MP’s rank

  1. Sanction speed 100%58Average days to sanction (full marks within the 45-day guideline, none at a year), and the share of works not overdue.

Activity over time

Recommendations, payments and completions by month

Value of works MPs recommended each month

Who got paid

Top vendors by payments received

Implementing district authorities

The districts that sanction and execute this MP’s works

Works

257 works · the 60 most recent are listed here, all of them in the explorer · tap “Photos” to see geo-tagged photos from eSAKSHI

Open in explorer
  • Construction of Pakka Concrete Bus Stand with Seat Accomodation and Required Solar Panel with battery of 2 no. of 10w Solar Light at Kashitala Bablabona of Rishipur GP of Habibpur Block (Booth No.- ,JL No.-250, Khatiyan – 338, Mouza- Garamari, Plot-1095 , GP- Rishipur, Block- Habibpur)

    Community buildings & public spacesConstruction of common work sheds / common covered sitting area· Malda· #69172

    ₹1.9 L Completed 10 Sept 2026Rec. 25 Dec 2023Paid ₹1.9 L
  • Construction of Pakka Concrete Bus Stand Rest House with Seat Accomodation andRequired Solar Panel with battery of 6 no. of 10w Solar Light in the Bus stand at Krishnanagar Bus stand of Rishipur GP of Habibpur Block (Booth No.- ,JL No.-259, Khatiyan – 2661/2662, Mouza- Rishipur, Plot-1471 , GP- Rishipur, Block- Habibpur)

    Community buildings & public spacesConstruction of bus-sheds or bus-stops· Malda· #69173

    ₹2.2 L Completed 10 Sept 2026Rec. 25 Dec 2023Paid ₹2.2 L
  • Construction of Pakka Concrete Rest House with Seat Accomodation and Required Solar Panel with battery of 6 no. of 10w Solar Light in the Bus stand at Dakhin Chandpur Bazar of Rishipur GP of Habibpur Block (Booth No.- ,JL No.-251, Khatiyan – 1706, Mouza- Rishipur, Plot-291 , GP- Rishipur, Block- Habibpur)

    Community buildings & public spacesConstruction of bus-sheds or bus-stops· Malda· #69174

    ₹2.4 L Completed 10 Sept 2026Rec. 25 Dec 2023Paid ₹2.4 L
  • Installation of Rashmi Star 1 pc*30w Solar Light at 1 Places (include MP name and Recommendation year branding, light should be certified from OEM, ZED Manufacturer, 2/3 years onsite warranty) and 7 meter Octagonal GI Pole at Sekendra Mouza, Location- Near Maneswar Mandal House (JL No.- 186, Mouza- Secendra, GP- Habibpur, Block- Habibpur )

    Electricity & lightingLighting of public spaces· Malda· #103045

    ₹48,450 Completed 10 Sept 2026Rec. 12 Feb 2024Paid ₹48,450
  • Construction of two Iron Crematorium on 1st Floor Bulbulchandi Samshan Ghat(Booth No.- 236, JL No.- 213, Mouza- Kendua, GP- Bulbulchandi, Block- Habibpur )

    Community buildings & public spacesCrematoriums / Energy efficient crematoriums or structures on burial / cremation ground· Malda· #108047

    ₹3.5 L Completed 10 Sept 2026Rec. 17 Feb 2024Paid ₹3.5 L
  • Installation of Sub Marshal with Reservior 2000 Ltr at Bulbulchandi Samshan Ghat(Booth No.- 236, JL No.- 213, Mouza- Kendua, GP- Bulbulchandi, Block- Habibpur )

    Drinking waterConstruction of water tanks· Malda· #108048

    ₹1.9 L Completed 10 Sept 2026Rec. 17 Feb 2024Paid ₹1.9 L
  • Construction of Boundary on 1st floor Creamtoriom place Bulbulchandi Samshan Ghat(Booth No.- 236, JL No.- 213, Mouza- Kendua, GP- Bulbulchandi, Block- Habibpur )

    Community buildings & public spacesCrematoriums / Energy efficient crematoriums or structures on burial / cremation ground· Malda· #108049

    ₹1.4 L Completed 10 Sept 2026Rec. 17 Feb 2024Paid ₹1.4 L
  • Installation of Rashmi Star 4pc*120w LED Flood High Mast Light (include MP name and Recommendation year branding, light should be certified from OEM,ZED Manufacturer, 2/3 years onsite warranty) and 10.5 meter octagonal pole at Tarasankar Charity Sebashram( JL-274 , Mouza - Nasratpur , GP-Srirampur , Block –Habibpur )

    Electricity & lightingLighting of public spaces· Malda· #125266

    ₹1.3 L Completed 10 Sept 2026Rec. 11 Mar 2024Paid ₹1.3 L
  • Installation of 1 no. of Solar Light at 4 places of Tajpur Bharat Seva Ashram (JL No.-193, Mouza- Kokabirni, Block- Habibpur)

    Electricity & lightingLighting of public spaces· Malda· #127225

    ₹1.2 L Completed 10 Sept 2026Rec. 13 Mar 2024Paid ₹1.2 L
  • Construction of P.C.C Open Mancha infront of Manikora Maa Kali Mandir(Booth No.-178, JL No.- 93, Mouza- Manikora, GP- Jajole, Block- Habibpur) Please allot the fund Prodhan, Jajole Gram Panchayet

    Community buildings & public spacesConstruction of common work sheds / common covered sitting area· Malda· #102837

    ₹8.1 L Completed 7 Sept 2026Rec. 11 Feb 2024Paid ₹8.1 L
  • Installation of Rashmi Star 1 pc*15w Solar Light at 4 places(include MP name and Recommendation year branding, light should be certified from OEM, ZED Manufacturer, 2/3 years onsite warranty) and 6 meter GI Pole at Bhabuk Mouza, JL No.- 89, Jajail GP, Habibpur Block [ Locations- i. Near Malin Mandal House ( Plot No.- 122 ), ii. Near Tridip Roy House ( Plot No.- 101 ), iii. i. Near Nimai Roy House ( Plot No.- 122 ),iv. Near Bisinda More (Plot No.- 1088) ]

    Electricity & lightingLighting of public spaces· Malda· #103029

    ₹1.3 L Completed 7 Sept 2026Rec. 12 Feb 2024Paid ₹1.3 L
  • Installation of Rashmi Star 1 pc*15w Solar Light at 4 places and 6 meter GI Pole at Agra Mouza, JL No.- 84, Jajail GP, Habibpur Block [ Locations- i. Near Pranab Roy House ( Plot No.- 1275 ), ii. Near Arup Haldar House ( Plot No.- 638 ), iii. i. Near Biswanath Chowdhury House ( Plot No.- 1008), iv. Near Durbapara Nilratan Roy House (Plot No.- 1610), v. Near Dubapara Suman Mallik House (Plot No.-1162) ]

    Electricity & lightingLighting of public spaces· Malda· #103030

    ₹1.6 L Completed 7 Sept 2026Rec. 12 Feb 2024Paid ₹1.6 L
  • Installation of Rashmi Star 1 pc*15w Solar Light at 3 places (include MP name and Recommendation year branding, light should be certified from OEM, ZED Manufacturer, 2/3 years onsite warranty) and 6 meter GI Pole at Kathalbanpur Mouza, JL No.- 101, Jajail GP, Habibpur Block [ Locations- i. Near Shib Shakti Mandir ( Plot No.- 1008 ), ii. Near Vaverihat ( Plot No.- 1008 ), iii. Near Suku Roy House (Plot No.- 680)]

    Electricity & lightingLighting of public spaces· Malda· #103031

    ₹66,850 Completed 7 Sept 2026Rec. 12 Feb 2024Paid ₹66,850
  • Installation of Rashmi Star 1 pc*15w Solar Light at 1 Places (include MP name and Recommendation year branding, light should be certified from OEM, ZED Manufacturer, 2/3 years onsite warranty) and 6 meter GI Pole at Bishnupur Mouza, JL No.- 87, Jajail GP, Habibpur Block [ Locations- i. Near Joydeb Sarkar House (Plot No.- 104)]

    Electricity & lightingLighting of public spaces· Malda· #103037

    ₹31,847 Completed 7 Sept 2026Rec. 12 Feb 2024Paid ₹31,847
  • Installation of Rashmi Star 1 pc*15w Solar Light at 2 Places (include MP name and Recommendation year branding, light should be certified from OEM, ZED Manufacturer, 2/3 years onsite warranty) and 6 meter GI Pole at Joydebpur Mouza, JL No.- 86, Jajail GP, Habibpur Block [ Locations- i. Near Joydebpur Pry School (Plot No.- 1064), ii. Near Chandra Barman House (Plot No.- 1108)]

    Electricity & lightingLighting of public spaces· Malda· #103040

    ₹63,694 Completed 7 Sept 2026Rec. 12 Feb 2024Paid ₹63,694

17th Lok Sabha MPs from West Bengal

Ranked by MP score

#MPUtilisationSpentCompletedScore
1Kalyan Banerjee · Sreerampur100%98%11199
2Ms Mimi Chakraborty · Jadavpur100%96%25097
3Shri Abhishek Banerjee · Diamond Harbour100%97%14997
4Ms Mahua Moitra · Krishnanagar100%100%2797
5Pratima Mondal · Joynagar100%97%14096
6Smt Sajda Ahmed · Uluberia96%96%18096
7Smt Locket Chatterjee · Hooghly100%100%30796
8Smt Satabdi Roy (Banerjee) · Birbhum100%99%12795
9Shri Kunar Hembram · Jhargram100%100%3195
10Dr Sukanta Majumdar · Balurghat94%82%33695
11Asit Kumar Mal · Bolpur100%100%5594
12Shri Deepak (Dev) Adhikari · Ghatal93%87%19594

Source: MoSPI eSAKSHI (eSAKSHI API (mplads.mospi.gov.in)). Fund utilisation = works recommended ÷ allocated limit (MoSPI’s definition); spent = vendor payments ÷ allocated limit; completion = completed ÷ recommended works. The MP score weighs completion, spending efficiency, utilisation, proof of work, spending and vendor diversity. How it’s calculated.