Skip to content
MPLADSTracker

MPLADS report card · 18th Lok Sabha

Mitesh Rameshbhai Bakabhai Patel

Lok SabhaBJPAnand · Gujarat

MP score65/100159th of 542 in the 18th Lok Sabha
10th of 26 from Gujarat
Also an MP in the 17th Lok Sabha Then: 97% utilisation, 359 works completed, score 83.

Allocated limit

₹14.70 Cr

Median ₹14.70 Cr

Fund utilisation

83%

₹12.23 Cr recommended · 554 works
Above median (76%)

Paid to vendors

₹7.75 Cr

53% of allocation
Above median (37%)

Works completed

267

48% of recommended
Above median (28%)

From recommendation to completion

Every work this MP recommended, by stage

  1. Recommended by the MP554 works

    ₹12.23 Cr · 83% of the ₹14.70 Cr allocated

  2. Sanctioned by the district517 works

    93% sanctioned · took 2.0 months on average (due within 45 days)

  3. Completed267 works

    ₹5.12 Cr final cost · 9.2 months from recommendation on average

37 works are still awaiting sanction, 26 of them for more than 45 days.

In plain words

What the numbers say

  • Recommended 554 works worth ₹12.23 Cr, a fund utilisation of 83%, higher than 62% of 18th Lok Sabha MPs.
  • The district has sanctioned 517 of them, taking 2.0 months on average.
  • ₹7.75 Cr has been paid to vendors, 53% of the allocation.
  • 267 works are complete, typically 9.2 months after recommendation. 167 works have geo-tagged photos on eSAKSHI.
  • The largest share of funds went to Roads & bridges.
  • Payments went to 181 vendors. The largest received 16%.
  • Citizens rated completed works 5.0 / 5 on average (1 rated works).

How the score is made

MP score 65/100: finishing works counts most

  1. Works completed 30%48Completed ÷ recommended works.
  2. Spending efficiency 20%66Value of completed works ÷ money paid out. Money paid without works finished scores low.
  3. Fund utilisation 15%83Value of works recommended ÷ allocated limit (MoSPI’s measure).
  4. Proof of work 15%63Share of completed works with photos or documents uploaded on eSAKSHI.
  5. Funds spent 10%53Paid to vendors ÷ allocated limit.
  6. Vendor diversity 10%
    i

    Members of Parliament (MPs) do not have direct, operational control over the specific vendors selected for government public works. However, they exert significant indirect influence by shaping procurement frameworks, passing supplier diversity laws, and conducting oversight.

    100
    How spread out payments are: full marks when no vendor gets over 20% of the money, none when one vendor gets everything.

Largest vendor: aastha construction, 16% of payments across 181 vendors.

District sanction speed

95/100 · sanction is the district authority’s job, so this doesn’t change the MP’s rank

  1. Sanction speed 100%95Average days to sanction (full marks within the 45-day guideline, none at a year), and the share of works not overdue.

Activity over time

Recommendations, payments and completions by month

Value of works MPs recommended each month

Who got paid

Top vendors by payments received

Implementing district authorities

The districts that sanction and execute this MP’s works

Works

554 works · the 60 most recent are listed here, all of them in the explorer · tap “Photos” to see geo-tagged photos from eSAKSHI

Open in explorer
  • Bhalabhai Mangalbhai Na Ghar thi Changa Valetva Road G.E.B Sudhi C.C. Road nu Kam

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Anand· #294228

    ₹5.0 L Completed 29 Oct 2026Rec. 11 Jul 2026Paid ₹5.0 L
  • Bhatiel Railway Station ni pase barot samajh tatha patel samajh na vistar ma block Paving nu kam

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Anand· #294242

    ₹4.0 L Completed 29 Oct 2026Rec. 11 Jul 2026Paid ₹4.0 L
  • Ward No. 4 ma chotiya talav pase fulabhai chaturbhai na ghar najik na vistarma Shed nu Kam

    Community buildings & public spacesConstruction of common work sheds / common covered sitting area· Anand· #319015

    ₹1.0 L Sanctioned · 27 Oct 2026Rec. 29 Sep 2026
  • Nagar Prathmik Shala Number 8 Mangalpura, Anand ma Madhyahan Bhojan Shed nu Banavanu Kam

    Community buildings & public spacesConstruction of common work sheds / common covered sitting area· Anand· #255729

    ₹3.0 L Sanctioned · 22 Oct 2026Rec. 29 Dec 2025
  • Bhilleshwar Gamtal Vistarma Block Paving nu Kam

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Anand· #319009

    ₹4.0 L Sanctioned · 22 Oct 2026Rec. 29 Sep 2026
  • Ramdevpir Mandir Vistar ma Block Paving Nu Kam

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Anand· #319010

    ₹1.3 L Sanctioned · 22 Oct 2026Rec. 29 Sep 2026
  • Vishrampura dudh utpadak sahkari Mandali Li. Chok ma khutti kadi no C.C road nu kam

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Anand· #319013

    ₹60,000 Sanctioned · 22 Oct 2026Rec. 29 Sep 2026
  • Parmar Shivabhai Dhulabhai Ghar ni Pachal thi Parmar Rameshbhai Jashbhai Dhulabhai na Ghar sudhi C.C. Road nu Kam

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Anand· #319016

    ₹2.0 L Sanctioned · 22 Oct 2026Rec. 29 Sep 2026
  • Kelavani Mandap Sanchalit Highschool ni Bajumathi 5 thi 7 highschool ane ITI ma Java valo Rasta nu C.C. Road nu kam

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Anand· #319017

    ₹5.0 L Sanctioned · 22 Oct 2026Rec. 29 Sep 2026
  • Nar game Malav Bhagol thi Lakatar mata mandir C.C. road nu khutti kadi nu kam

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Anand· #319018

    ₹2.5 L Vendor Identification · 22 Oct 2026Rec. 29 Sep 2026Paid ₹2.5 L
  • bhutiya vad pase bipinsinh raj na ghar pase block paving nu kam

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Anand· #319049

    ₹1.0 L Sanctioned · 22 Oct 2026Rec. 29 Sep 2026
  • Rangaipura Dharmnagar society na vistar ma C.C. road nu kam

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Anand· #319050

    ₹3.0 L Sanctioned · 22 Oct 2026Rec. 29 Sep 2026
  • Vaghpura Vistar ma Jitubhai tatha Teenabhai na Ghar pase Block pAving nu kam

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Anand· #319051

    ₹3.0 L Sanctioned · 22 Oct 2026Rec. 29 Sep 2026
  • The Chamby Education Society Na Vaghela Vidyabhavan Ma Compund ma Block Paving nu Kam

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Anand· #162846

    ₹3.0 L Sanctioned · 29 Sept 2026Rec. 31 Dec 2024
  • Kaniya game Thakor ane Patel Samajh na Samashan ma Diwal nu Kam

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Anand· #231535

    ₹1.0 L Completed 29 Sept 2026Rec. 13 Sep 2025Paid ₹1.0 L

18th Lok Sabha MPs from Gujarat

Ranked by MP score

Compare
#MPUtilisationSpentCompletedScore
1C R Patil · Navsari83%48%27881
2Bharatbhai Manubhai Sutariya · Amreli90%47%20076
3Mansukhbhai Dhanjibhai Vasava · Bharuch81%47%23171
4Bharatsinhji Shankarji Dabhi · Patan88%57%16271
5Rajeshbhai Naranbhai Chudasama · Junagadh98%41%15771
6Mukeshkumar Chandrakaant Dalal · Surat83%29%10969
7Shobhanaben Mahendrasinh Baraiya · Sabarkantha77%43%13167
8Parshottambhai Rupala · Rajkot91%30%11567
9Dhaval Laxmanbhai Patel · Valsad64%30%7866
10Mitesh Rameshbhai Bakabhai Patel · Anand83%53%26765
11Dr. Mansukh Mandaviya · Porbandar96%28%8264
12Jaswantsinh Sumanbhai Bhabhor · Dahod90%21%9964

Source: MoSPI eSAKSHI (eSAKSHI API (mplads.mospi.gov.in)). Fund utilisation = works recommended ÷ allocated limit (MoSPI’s definition); spent = vendor payments ÷ allocated limit; completion = completed ÷ recommended works. The MP score weighs completion, spending efficiency, utilisation, proof of work, spending and vendor diversity. How it’s calculated.