1st of 39 from Tamil Nadu
Allocated limit
₹9.53 Cr
Median ₹8.60 Cr
Fund utilisation
100%
₹9.53 Cr recommended · 102 works
About the median
Paid to vendors
₹9.53 Cr
100% of allocation
Above median (88%)
Works completed
101
99% of recommended
Above median (83%)
From recommendation to completion
Every work this MP recommended, by stage
- Recommended by the MP102 works
₹9.53 Cr · 100% of the ₹9.53 Cr allocated
- Sanctioned by the district102 works
100% sanctioned · took 2.7 months on average (due within 45 days)
- Completed101 works
₹9.43 Cr final cost · 4.3 months from recommendation on average
In plain words
What the numbers say
- Recommended 102 works worth ₹9.53 Cr, a fund utilisation of 100%, higher than 87% of 17th Lok Sabha MPs.
- The district has sanctioned 102 of them, taking 2.7 months on average.
- ₹9.53 Cr has been paid to vendors, 100% of the allocation.
- 101 works are complete, typically 4.3 months after recommendation. 97 works have geo-tagged photos on eSAKSHI.
- The largest share of funds went to Roads & bridges.
- Payments went to 51 vendors. The largest received 11%.
- No citizen ratings have been reported for completed works.
How the score is made
MP score 99/100: finishing works counts most
- Works completed 30%99Completed ÷ recommended works.
- Spending efficiency 20%99Value of completed works ÷ money paid out. Money paid without works finished scores low.
- Fund utilisation 15%100Value of works recommended ÷ allocated limit (MoSPI’s measure).
- Proof of work 15%96Share of completed works with photos or documents uploaded on eSAKSHI.
- Funds spent 10%100Paid to vendors ÷ allocated limit.
- Vendor diversity 10%100How spread out payments are: full marks when no vendor gets over 20% of the money, none when one vendor gets everything.
i
Members of Parliament (MPs) do not have direct, operational control over the specific vendors selected for government public works. However, they exert significant indirect influence by shaping procurement frameworks, passing supplier diversity laws, and conducting oversight.
Largest vendor: MERITON CONSTRUCTION, 11% of payments across 51 vendors.
District sanction speed
94/100 · sanction is the district authority’s job, so this doesn’t change the MP’s rank
- Sanction speed 100%94Average days to sanction (full marks within the 45-day guideline, none at a year), and the share of works not overdue.
Activity over time
Recommendations, payments and completions by month
Sectors
Value of works by category
Who got paid
Top vendors by payments received
Implementing district authorities
The districts that sanction and execute this MP’s works
Works
102 works · the 60 most recent are listed here, all of them in the explorer · tap “Photos” to see geo-tagged photos from eSAKSHI
Construction of Public Toilets at Ellapalayam Kavadi Street in Sivanmalai Panchayat. 2023-24
Sanitation & drainageConstruction of public toilets and bathrooms· Tiruppur· #51931
₹9.5 L Physical Inspection · 18 Jun 2026Rec. 22 Nov 2023Paid ₹9.5 LInstallation of CCTV Cameras in Ward 16 at Vairapalayam, Krishanampalayam in Veerappan Chatram. 2023-24
Safety & securityProviding CCTV camera system for security of public areas· Erode· #132147
₹10.0 L Completed 13 Aug 2025Rec. 16 Mar 2024Paid ₹10.0 LConstruction of Waiting Shed for PHC in Eswarasettipalayam at Sadayapalayam Panchayat.- 2023-24
Community buildings & public spacesConstruction of common work sheds / common covered sitting area· Tiruppur· #107638
₹5.0 L Completed 10 Jan 2025Rec. 17 Feb 2024Paid ₹5.0 LSetting up of 5000 Ltr. Syntex Tank and extension of pipeline in Ward No.1 at Periyanna goundenvalasu. - 2023-24
Drinking waterConstruction of water tanks· Tiruppur· #107599
₹1.5 L Completed 18 Dec 2024Rec. 17 Feb 2024Paid ₹1.5 LConstruction of Bus Shelter in Ward No.5 near Pudhukottai Pirivu at Mulanur Kilangundal Salai - 2022-23
Community buildings & public spacesConstruction of platforms and passenger sheds at railway stations· Tiruppur· #52031
₹8.5 L Completed 7 Dec 2024Rec. 23 Nov 2023Paid ₹8.5 LConstruction of Bus Shelter in Ward No.19, Sivanathapuram at Vellakovil Municipality - 2023-24
Community buildings & public spacesConstruction of platforms and passenger sheds at railway stations· Tiruppur· #51955
₹5.0 L Completed 22 Nov 2024Rec. 22 Nov 2023Paid ₹5.0 LConstruction of Culvert in Ward No.4 Muslim Smart Chathram Street of Kangayam Municipality - 2022-23
Roads & bridgesConstruction of culverts and bridges· Tiruppur· #121891
₹3.0 L Completed 28 Oct 2024Rec. 6 Mar 2024Paid ₹3.0 LFormation of BT road in the left side bund of Kalingarayan Channel from mile 0-2-195 to 0-6-620 in Erode. - 2022-23
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Erode· #52419
₹13.0 L Completed 18 Oct 2024Rec. 24 Nov 2023Paid ₹13.0 LConstruction of drainage at Agraharam Baai house to street end road at Pallipalayam. 2022-23
Sanitation & drainageProviding drains and gutters for public drainage· Namakkal· #52440
₹3.0 L Completed 26 Sept 2024Rec. 24 Nov 2023Paid ₹3.0 LConstruction of 30000 Ltr. OHT and distribution of water in Ward No.13 at Yerikarukku Main Street (Punganthurai) in Modakkurichi. 2022-23
Drinking waterConstruction of water tanks· Erode· #52518
₹12.2 L Completed 12 Sept 2024Rec. 24 Nov 2023Paid ₹12.2 LConstruction of drainage and Cement concrete road at Agraharam Mohan house to Main road at Pallipalayam. 2022-23
Sanitation & drainageProviding drains and gutters for public drainage· Namakkal· #52442
₹5.0 L Completed 3 Sept 2024Rec. 24 Nov 2023Paid ₹5.0 LConstruction of Drainage and Laying Concrete Road from Agraharam Sivam house to Mori at Pallipalayam. 2022-23
Sanitation & drainageProviding drains and gutters for public drainage· Namakkal· #52450
₹8.0 L Completed 3 Sept 2024Rec. 24 Nov 2023Paid ₹8.0 LInstallation of Highmast Light in Zone-3 in Ward No.46, NGGO Colony 70 Feet 7th Street Junction in Erode Corporation.(2022-23)
Electricity & lightingStreet lights· Erode· #48744
₹3.8 L Completed 29 Aug 2024Rec. 11 Nov 2023Paid ₹3.8 LInstallation of Mini Highmast Light in Ward No.17 at Cauvery road, Mosque Street near Pallivasal in Erode Corporation. 2023-24
Electricity & lightingStreet lights· Erode· #52392
₹3.8 L Completed 29 Aug 2024Rec. 24 Nov 2023Paid ₹3.8 LConstruction of Compound Wall and installation of Lights in Ward No.3 at Suriya Nagar in Erode Croporation. 2022-23
Community buildings & public spacesConstruction of boundary walls of existing public and community buildings· Erode· #52439
₹6.0 L Completed 29 Aug 2024Rec. 24 Nov 2023Paid ₹6.0 L
17th Lok Sabha MPs from Tamil Nadu
Ranked by MP score
| # | MP | Utilisation | Spent | Completed | Score |
|---|---|---|---|---|---|
| 1 | A Ganeshamurthi · Erode | 100% | 100% | 101 | 99 |
| 2 | Ganesan Selvam · Kancheepuram | 100% | 97% | 206 | 97 |
| 3 | Dhanush M Kumar · Tenkasi | 100% | 99% | 211 | 97 |
| 4 | S Gnanathiraviam · Tirunelveli | 97% | 94% | 93 | 97 |
| 5 | Kanimozhi Karunanidhi · Thoothukkudi | 99% | 96% | 62 | 97 |
| 6 | Thirumaa Valavan Thol · Chidambaram | 99% | 96% | 81 | 96 |
| 7 | S Venkatesan · Madurai | 97% | 96% | 165 | 96 |
| 8 | Kalanidhi Veeraswamy · Chennai North | 99% | 98% | 32 | 96 |
| 9 | AKP Chinraj · Namakkal | 98% | 98% | 93 | 96 |
| 10 | MK Vishnu Prasad · Arani | 100% | 100% | 102 | 95 |
| 11 | TRVS Ramesh · Cuddalore | 96% | 89% | 114 | 95 |
| 12 | M Selvaraj · Nagapattinam | 99% | 99% | 76 | 95 |
Source: MoSPI eSAKSHI (eSAKSHI API (mplads.mospi.gov.in)). Fund utilisation = works recommended ÷ allocated limit (MoSPI’s definition); spent = vendor payments ÷ allocated limit; completion = completed ÷ recommended works. The MP score weighs completion, spending efficiency, utilisation, proof of work, spending and vendor diversity. How it’s calculated.