This is a record from the 17th Lok Sabha (2019–24). eSAKSHI covers its final year only, from April 2023. Comparisons are with other 17th Lok Sabha MPs.

MPLADS report card · 17th Lok Sabha

Vaithilingam Ve

Lok SabhaPuducherry · Puducherry

MP score84/100285th of 539 in the 17th Lok Sabha
Re-elected to the 18th Lok Sabha Then: 74% utilisation, 13 works completed, score 49.

Allocated limit

₹7.89 Cr

Median ₹8.60 Cr

Fund utilisation

99%

₹7.78 Cr recommended · 62 works
About the median

Paid to vendors

₹6.76 Cr

86% of allocation
About the median

Works completed

47

76% of recommended
Below median (83%)

From recommendation to completion

Every work this MP recommended, by stage

  1. Recommended by the MP62 works

    ₹7.78 Cr · 99% of the ₹7.89 Cr allocated

  2. Sanctioned by the district59 works

    95% sanctioned · took 6.5 months on average (due within 45 days)

  3. Completed47 works

    ₹5.59 Cr final cost · 7.9 months from recommendation on average

3 works are still awaiting sanction, 3 of them for more than 45 days.

In plain words

What the numbers say

  • Recommended 62 works worth ₹7.78 Cr, a fund utilisation of 99%, higher than 55% of 17th Lok Sabha MPs.
  • The district has sanctioned 59 of them, taking 6.5 months on average.
  • ₹6.76 Cr has been paid to vendors, 86% of the allocation.
  • 47 works are complete, typically 7.9 months after recommendation. 35 works have geo-tagged photos on eSAKSHI.
  • The largest share of funds went to Roads & bridges.
  • Payments went to 43 vendors. The largest received 10%.
  • No citizen ratings have been reported for completed works.

How the score is made

MP score 84/100: finishing works counts most

  1. Works completed 30%76Completed ÷ recommended works.
  2. Spending efficiency 20%83Value of completed works ÷ money paid out. Money paid without works finished scores low.
  3. Fund utilisation 15%99Value of works recommended ÷ allocated limit (MoSPI’s measure).
  4. Proof of work 15%74Share of completed works with photos or documents uploaded on eSAKSHI.
  5. Funds spent 10%86Paid to vendors ÷ allocated limit.
  6. Vendor diversity 10%
    i

    Members of Parliament (MPs) do not have direct, operational control over the specific vendors selected for government public works. However, they exert significant indirect influence by shaping procurement frameworks, passing supplier diversity laws, and conducting oversight.

    100
    How spread out payments are: full marks when no vendor gets over 20% of the money, none when one vendor gets everything.

Largest vendor: THE NATIONAL SMALL INDUSTRIES CORPORATION LIMITED, 10% of payments across 43 vendors.

District sanction speed

74/100 · sanction is the district authority’s job, so this doesn’t change the MP’s rank

  1. Sanction speed 100%74Average days to sanction (full marks within the 45-day guideline, none at a year), and the share of works not overdue.

Activity over time

Recommendations, payments and completions by month

Value of works MPs recommended each month

Who got paid

Top vendors by payments received

Implementing district authorities

The districts that sanction and execute this MP’s works

Works

62 works · the 60 most recent are listed here, all of them in the explorer · tap “Photos” to see geo-tagged photos from eSAKSHI

Open in explorer
  • Providing additional facilities in Community hall owned by Bahour Commune Panchayat at Aranganur Village, Puducherry with required equipment from M/s Kendriya Bhandar (Central Govt Employees Cooperative Society Ltd.)

    Community buildings & public spacesConstruction of additional rooms and halls in the existing public and community building· Puducherry· #71420

    ₹30.0 L Physical Inspection · 13 Jul 2026Rec. 29 Dec 2023Paid ₹29.9 L
  • Providing and installing High Mast light at Mariamman koil junction, silukkaripalayam Village in Thirubuvanai Constituency

    Electricity & lightingLighting of public spaces· Puducherry· #132081

    ₹1.9 L Completed 14 May 2026Rec. 16 Mar 2024Paid ₹1.9 L
  • Improvements to the road leading to cremation yard at Pattinacherri, TR Pattinam, Karaikal.

    Roads & bridgesConstruction of footpaths and pedestrian ways· Puducherry· #55205

    ₹18.7 L Completed 10 Mar 2026Rec. 1 Dec 2023Paid ₹18.7 L
  • Providing drainage facilities to the Engineers colony mainroad from pump house junction leading to Tirupurkumaran Nagar main road in Velrampet, Mudaliarpet constituency, Puducherry.

    Sanitation & drainageProviding drains and gutters for public drainage· Puducherry· #131148

    ₹20.0 L Completed 23 Feb 2026Rec. 16 Mar 2024Paid ₹20.0 L
  • Formation of Road to Sri Venkateswara Nagar at Reddiyarpalayam in Oulgaret Constituency.

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Puducherry· #54583

    ₹7.7 L Completed 4 Feb 2026Rec. 29 Nov 2023Paid ₹7.7 L
  • Construction of anganwadi centre at Pudhu Nagar Kuruvinatham East Bahour Commune Pondicherry

    Education & librariesConstruction of buildings for crèches and anganwadies· Puducherry· #254633

    ₹15.0 L Work partially Completed · 24 Dec 2025Rec. 18 Apr 2023Paid ₹15.0 L
  • Construction of library building at Bahourpet Bahour Commune Panchayat Puducherry

    Education & librariesConstruction of public libraries and reading rooms· Puducherry· #254635

    ₹15.0 L Work partially Completed · 24 Dec 2025Rec. 19 Jul 2023Paid ₹9.4 L
  • Improvements to the road from Hassan Mukku and Patch works to Mottemmel road and branch roads, Pandakkal in Mahe

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Puducherry· #132010

    ₹1.0 L Completed 23 Oct 2025Rec. 16 Mar 2024Paid ₹1.0 L
  • Construction of Open stage at Pudhu Nagar Mariamman Koil Junction, Periyar Nagar, Kuruvinatham, Bahour Commune, Puducherry.

    Community buildings & public spacesConstruction of buildings for community cultural activities· Puducherry· #132176

    ₹6.7 L Completed 10 Sept 2025Rec. 16 Mar 2024Paid ₹6.7 L
  • Improvements to the link road and cross roads of Krishna nagar (North) 12th Cross-I cross extn leading to ECR, Lawspet in Kamaraj Nagar Constituency, Puducherry.

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Puducherry· #54581

    ₹14.0 L Completed 6 Jun 2025Rec. 29 Nov 2023Paid ₹14.0 L
  • Construction of one new classroom and a Dining hall at Govt. Primary School, Velrampet, Puducherry

    Education & librariesConstruction of rooms and halls in school and colleges· Puducherry· #98186

    ₹12.8 L Completed 16 May 2025Rec. 6 Feb 2024Paid ₹12.8 L
  • Construction of Indoor Tennis Court/Badminton Court at Government Aided Wiseman Higher Secondary School, Velrampet, Puducherry.

    Sports & fitnessDevelopment of playground· Puducherry· #55211

    ₹13.4 L Completed 24 Mar 2025Rec. 1 Dec 2023Paid ₹13.4 L
  • Strengthening of damaged canal at Kamaraj Nagar in kamaraj Nagar constituency, Puducherry

    Sanitation & drainageProviding drains and gutters for public drainage· Puducherry· #131312

    ₹7.0 L Completed 3 Feb 2025Rec. 16 Mar 2024Paid ₹7.0 L
  • Providing and Installing High Mast light near Kanuvapet, Pudhu Nagar Entrance arch in Mangalam Constituency

    Electricity & lightingLighting of public spaces· Puducherry· #132138

    ₹2.0 L Work partially Completed · 26 Nov 2024Rec. 16 Mar 2024Paid ₹82,667
  • Improvements to internal roads on the north side at Thirumalai Thaayar Nagar, Moolakulam, Puducherry.

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Puducherry· #54883

    ₹16.8 L Completed 15 Nov 2024Rec. 30 Nov 2023Paid ₹16.8 L

17th Lok Sabha MPs from Puducherry

Ranked by MP score

#MPUtilisationSpentCompletedScore
1Vaithilingam Ve · Puducherry99%86%4784

Source: MoSPI eSAKSHI (eSAKSHI API (mplads.mospi.gov.in)). Fund utilisation = works recommended ÷ allocated limit (MoSPI’s definition); spent = vendor payments ÷ allocated limit; completion = completed ÷ recommended works. The MP score weighs completion, spending efficiency, utilisation, proof of work, spending and vendor diversity. How it’s calculated.