No completed works reported
20 works recommended, none reported complete yet.
Allocated limit
₹7.35 Cr
Median ₹14.70 Cr
Fund utilisation
27%
₹2.01 Cr recommended · 20 works
Below median (70%)
Paid to vendors
₹0
0% of allocation
Below median (25%)
Works completed
0
0% of recommended
Below median (26%)
From recommendation to completion
Every work this MP recommended, by stage
- Recommended by the MP20 works
₹2.01 Cr · 27% of the ₹7.35 Cr allocated
- Sanctioned by the district18 works
90% sanctioned · took 12 days on average (due within 45 days)
- Completed0 works
₹0 final cost
2 works are still awaiting sanction, 2 of them for more than 45 days.
In plain words
What the numbers say
- Recommended 20 works worth ₹2.01 Cr, a fund utilisation of 27%, higher than 23% of Rajya Sabha MPs.
- The district has sanctioned 18 of them, taking 12 days on average.
- ₹0 has been paid to vendors, 0% of the allocation.
- 0 works are complete.
- The largest share of funds went to Community buildings & public spaces.
- No citizen ratings have been reported for completed works.
How the score is made
MP score 6/100: finishing works counts most
- Works completed 30%0Completed ÷ recommended works.
- Spending efficiency 20%Not enough dataValue of completed works ÷ money paid out. Money paid without works finished scores low.
- Fund utilisation 15%27Value of works recommended ÷ allocated limit (MoSPI’s measure).
- Proof of work 15%0Share of completed works with photos or documents uploaded on eSAKSHI.
- Funds spent 10%0Paid to vendors ÷ allocated limit.
- Vendor diversity 10%Not enough dataHow spread out payments are: full marks when no vendor gets over 20% of the money, none when one vendor gets everything.
i
Members of Parliament (MPs) do not have direct, operational control over the specific vendors selected for government public works. However, they exert significant indirect influence by shaping procurement frameworks, passing supplier diversity laws, and conducting oversight.
District sanction speed
95/100 · sanction is the district authority’s job, so this doesn’t change the MP’s rank
- Sanction speed 100%95Average days to sanction (full marks within the 45-day guideline, none at a year), and the share of works not overdue.
Activity over time
Recommendations, payments and completions by month
Sectors
Value of works by category
Who got paid
Top vendors by payments received
No vendor payments recorded yet.
Implementing district authorities
The districts that sanction and execute this MP’s works
Works
20 works · tap “Photos” to see geo-tagged photos from eSAKSHI
Bore well near orchard of Tariq Ahmed qadri, village Mashwara, teh Keller
Drinking waterInstalling tube-wells and borewells· Shopian· #316625
₹9.7 L Sanctioned · 29 Oct 2026Rec. 21 Sep 2026construction of cow shed for kameshwar gaushalla adjoining kameshwar mandir, akhnoor, pyt Daskal block akhnoor
Agriculture & animal careConstruction of shelters for animals· Jammu· #316986
₹20.0 L Sanctioned · 7 Oct 2026Rec. 22 Sep 2026construction of 125 mm dia borewell with submersible pump set at chander bhaga colony, ward no 63, lower thather, bantalab, jammu
Drinking waterInstalling tube-wells and borewells· Jammu· #316995
₹5.7 L Sanctioned · 7 Oct 2026Rec. 22 Sep 2026repair of old drain & construction of slab over the drain at ward no 15 near dudhadhari mandir udhampur
Sanitation & drainageProviding drains and gutters for public drainage· Udhampur· #316628
₹4.6 L Sanctioned · 25 Sept 2026Rec. 21 Sep 2026sitting shed at cremation ground
Community buildings & public spacesConstruction of common work sheds / common covered sitting area· Jammu· #307884
₹15.0 L Sanctioned · 10 Sept 2026Rec. 25 Aug 2026bathing shed at cremation ground
Community buildings & public spacesConstruction of common work sheds / common covered sitting area· Jammu· #307888
₹5.0 L Sanctioned · 10 Sept 2026Rec. 25 Aug 2026AMPHITHEATRE
Community buildings & public spacesConstruction of common work sheds / common covered sitting area· Kathua· #308466
₹18.4 L Sanctioned · 5 Sept 2026Rec. 26 Aug 2026parking facility
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Doda· #307876
₹6.4 L Sanctioned · 3 Sept 2026Rec. 25 Aug 2026hand pump
Drinking waterInstalling hand pumps· Rajouri· #308360
₹3.6 L Sanctioned · 2 Sept 2026Rec. 26 Aug 2026hand pump
Drinking waterInstalling hand pumps· Rajouri· #308461
₹3.6 L Sanctioned · 2 Sept 2026Rec. 26 Aug 2026hand pump
Drinking waterInstalling hand pumps· Rajouri· #308463
₹3.6 L Sanctioned · 2 Sept 2026Rec. 26 Aug 2026hand pump
Drinking waterInstalling hand pumps· Rajouri· #308464
₹4.0 L Sanctioned · 2 Sept 2026Rec. 26 Aug 2026hand pump
Drinking waterInstalling hand pumps· Rajouri· #308465
₹4.0 L Sanctioned · 2 Sept 2026Rec. 26 Aug 2026Community bunker
Community buildings & public spacesConstruction of common work sheds / common covered sitting area· Poonch· #307845
₹16.0 L Sanctioned · 27 Aug 2026Rec. 25 Aug 2026farmer training centre
Agriculture & animal careSetting up of farmers’ training and assistance centers· Udhampur· #308796
₹40.0 L Awaiting sanction · 66 daysRec. 27 Aug 2026
Rajya Sabha MPs from Jammu and Kashmir
Ranked by MP score
| # | MP | Utilisation | Spent | Completed | Score |
|---|---|---|---|---|---|
| 1 | Shri Gulam Ali | 84% | 69% | 156 | 80 |
| 2 | Shri Sajjad Ahmad Kichloo | 65% | 0% | 0 | 14 |
| 3 | Shri Chowdry Mohammad Ramzan | 58% | 0% | 0 | 12 |
| 4 | Shri Sat Paul Sharma | 27% | 0% | 0 | 6 |
| 5 | Shri Gurwinder Singh Oberoi | 0% | 0% | 0 | 0 |
Source: MoSPI eSAKSHI (eSAKSHI API (mplads.mospi.gov.in)). Fund utilisation = works recommended ÷ allocated limit (MoSPI’s definition); spent = vendor payments ÷ allocated limit; completion = completed ÷ recommended works. The MP score weighs completion, spending efficiency, utilisation, proof of work, spending and vendor diversity. How it’s calculated.