MPLADS report card · Rajya Sabha
Shri Chowdry Mohammad Ramzan
Rajya Sabha
JKNCTerm 2025–2031Jammu and Kashmir
3rd of 5 from Jammu and Kashmir
Recommended, but little spent
58% of funds recommended, but only 0.0% paid out to vendors.
No completed works reported
33 works recommended, none reported complete yet.
Allocated limit
₹7.35 Cr
Median ₹14.70 Cr
Fund utilisation
58%
₹4.29 Cr recommended · 33 works
Below median (70%)
Paid to vendors
₹0
0% of allocation
Below median (25%)
Works completed
0
0% of recommended
Below median (26%)
From recommendation to completion
Every work this MP recommended, by stage
- Recommended by the MP33 works
₹4.29 Cr · 58% of the ₹7.35 Cr allocated
- Sanctioned by the district3 works
9.1% sanctioned · took 26 days on average (due within 45 days)
- Completed0 works
₹0 final cost
30 works are still awaiting sanction, 12 of them for more than 45 days.
In plain words
What the numbers say
- Recommended 33 works worth ₹4.29 Cr, a fund utilisation of 58%, higher than 39% of Rajya Sabha MPs.
- The district has sanctioned 3 of them, taking 26 days on average.
- ₹0 has been paid to vendors, 0% of the allocation.
- 0 works are complete.
- The largest share of funds went to Electricity & lighting.
- No citizen ratings have been reported for completed works.
How the score is made
MP score 12/100: finishing works counts most
- Works completed 30%0Completed ÷ recommended works.
- Spending efficiency 20%Not enough dataValue of completed works ÷ money paid out. Money paid without works finished scores low.
- Fund utilisation 15%58Value of works recommended ÷ allocated limit (MoSPI’s measure).
- Proof of work 15%0Share of completed works with photos or documents uploaded on eSAKSHI.
- Funds spent 10%0Paid to vendors ÷ allocated limit.
- Vendor diversity 10%Not enough dataHow spread out payments are: full marks when no vendor gets over 20% of the money, none when one vendor gets everything.
i
Members of Parliament (MPs) do not have direct, operational control over the specific vendors selected for government public works. However, they exert significant indirect influence by shaping procurement frameworks, passing supplier diversity laws, and conducting oversight.
District sanction speed
64/100 · sanction is the district authority’s job, so this doesn’t change the MP’s rank
- Sanction speed 100%64Average days to sanction (full marks within the 45-day guideline, none at a year), and the share of works not overdue.
Activity over time
Recommendations, payments and completions by month
Sectors
Value of works by category
Who got paid
Top vendors by payments received
No vendor payments recorded yet.
Implementing district authorities
The districts that sanction and execute this MP’s works
Works
33 works · tap “Photos” to see geo-tagged photos from eSAKSHI
Improvement of Wagoora-Vizer Road by way of R-Wall and fillings at various places as Given in S.No. 1 in D.O Letter Attached
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Baramulla· #320022
₹10.0 L Awaiting sanction · 28 daysRec. 4 Oct 2026construction of two Borewells Near the Land of Haroon Rashid Mir and others at Takiya tapper and near the orchard Land of irshad Ahmad Dar and others at Takiya Tapper waripora, through Agriculture department as given Serial 1 and 2 respectively in D.O Letter attached
Drinking waterInstalling tube-wells and borewells· Baramulla· #320023
₹4.0 L Awaiting sanction · 28 daysRec. 4 Oct 2026Construction of borewell Near the House of Sajad Ahmad Lone and others at College Colony Thidoma, through Agriculture department as given Serial 3 in D.O Letter attached.
Drinking waterInstalling tube-wells and borewells· Baramulla· #320025
₹2.0 L Awaiting sanction · 28 daysRec. 4 Oct 2026Installation of two 63kva Transformers at Tilgam-A, Baghat Mohallah and Thokar mohallah Firdous Colony Near Al-Huda medicine Kalamtra Baramullah as given Serial 5 and 6 in D.O Letter attached.
Electricity & lightingImprovement of electricity distribution infrastructure· Baramulla· #320026
₹5.0 L Awaiting sanction · 28 daysRec. 4 Oct 2026Installation of Solar Street lights in different Villages of Wagoora-Kreeri Constituency as given in serial 7 in D.o Letter attached.
Electricity & lightingStreet lights· Baramulla· #320027
₹7.0 L Awaiting sanction · 28 daysRec. 4 Oct 2026Installation of Solar Street Lights in Different Villages of wagoora-Kreeri Constituency as given in serial 8 in D.O Letter attached
Electricity & lightingStreet lights· Baramulla· #320034
₹7.0 L Awaiting sanction · 28 daysRec. 4 Oct 2026Construction of Auditorium at Skims Soura
Community buildings & public spacesConstruction of buildings for community cultural activities· Srinagar· #320035
₹50.0 L Awaiting sanction · 28 daysRec. 4 Oct 2026Purchase of 01 Medical equipment for wound healing having Topical Wound Microenvironment Modulation system using combined negative pressure wound therapy with topical oxygen in single portable device for Govt Medical College Handwara.
HealthPurchase of hospital equipment· Kupwara· #320037
₹10.0 L Awaiting sanction · 28 daysRec. 4 Oct 2026Purchase of 01 Medical equipment for wound healing having Topical Wound Microenvironment Modulation system using combined negative pressure wound therapy with topical oxygen in single portable device ,for Skims Soura.
HealthPurchase of hospital equipment· Srinagar· #320040
₹10.0 L Awaiting sanction · 28 daysRec. 4 Oct 2026Cutting/Filling/Levelling of playground at Check Gund kaisar Near DRM school in Arin Block , as Given in S.No. 1 in D.O Letter attached
Sports & fitnessDevelopment of playfields and sports grounds· Bandipora· #319879
₹2.5 L Awaiting sanction · 29 daysRec. 3 Oct 2026Upgradation of Link Road from Masjid Sharief Vijbera to Sanaullah Bhat's House as Given in S.No. 2 in D.O Letter attached
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Bandipora· #319880
₹2.5 L Awaiting sanction · 29 daysRec. 3 Oct 2026Construction of Culvert at Village Gund Kaisar near house of Nayimul Islam in Arin block as Given in S.No. 3 in D.O Letter attached.
Roads & bridgesConstruction of culverts and bridges· Bandipora· #319883
₹3.0 L Awaiting sanction · 29 daysRec. 3 Oct 2026Procurement of Cricket Kits in my Territorial constituency Handwara
Sports & fitnessProviding sports equipment, except consumable items· Kupwara· #312372
₹22.0 L Sanctioned · 1 Oct 2026Rec. 5 Sep 2026Procurement of Sports uniforms for my territorial Constituency Handwara
Sports & fitnessProviding sports equipment, except consumable items· Kupwara· #312379
₹9.5 L Sanctioned · 1 Oct 2026Rec. 5 Sep 2026Procurement of sports equipments for my Territorial Constituency Handwara
Sports & fitnessProviding sports equipment, except consumable items· Kupwara· #312380
₹5.0 L Sanctioned · 1 Oct 2026Rec. 5 Sep 2026
Rajya Sabha MPs from Jammu and Kashmir
Ranked by MP score
| # | MP | Utilisation | Spent | Completed | Score |
|---|---|---|---|---|---|
| 1 | Shri Gulam Ali | 84% | 69% | 156 | 80 |
| 2 | Shri Sajjad Ahmad Kichloo | 65% | 0% | 0 | 14 |
| 3 | Shri Chowdry Mohammad Ramzan | 58% | 0% | 0 | 12 |
| 4 | Shri Sat Paul Sharma | 27% | 0% | 0 | 6 |
| 5 | Shri Gurwinder Singh Oberoi | 0% | 0% | 0 | 0 |
Source: MoSPI eSAKSHI (eSAKSHI API (mplads.mospi.gov.in)). Fund utilisation = works recommended ÷ allocated limit (MoSPI’s definition); spent = vendor payments ÷ allocated limit; completion = completed ÷ recommended works. The MP score weighs completion, spending efficiency, utilisation, proof of work, spending and vendor diversity. How it’s calculated.