Skip to content
MPLADSTracker

MPLADS report card · 18th Lok Sabha

Saptagiri Sankar Ulaka

Lok SabhaINCST seatKoraput · Odisha

MP score54/100300th of 542 in the 18th Lok Sabha
5th of 21 from Odisha
Also an MP in the 17th Lok Sabha Then: 97% utilisation, 184 works completed, score 81.

Allocated limit

₹26.95 Cr

Median ₹14.70 Cr

Fund utilisation

73%

₹19.76 Cr recommended · 603 works
About the median

Paid to vendors

₹7.67 Cr

28% of allocation
Below median (37%)

Works completed

201

33% of recommended
Above median (28%)

From recommendation to completion

Every work this MP recommended, by stage

  1. Recommended by the MP603 works

    ₹19.76 Cr · 73% of the ₹26.95 Cr allocated

  2. Sanctioned by the district503 works

    83% sanctioned · took 4.3 months on average (due within 45 days)

  3. Completed201 works

    ₹5.89 Cr final cost · 6.9 months from recommendation on average

100 works are still awaiting sanction, 72 of them for more than 45 days.

In plain words

What the numbers say

  • Recommended 603 works worth ₹19.76 Cr, a fund utilisation of 73%, higher than 45% of 18th Lok Sabha MPs.
  • The district has sanctioned 503 of them, taking 4.3 months on average.
  • ₹7.67 Cr has been paid to vendors, 28% of the allocation.
  • 201 works are complete, typically 6.9 months after recommendation. 69 works have geo-tagged photos on eSAKSHI.
  • The largest share of funds went to Roads & bridges.
  • Payments went to 70 vendors. The largest received 14%.
  • No citizen ratings have been reported for completed works.

How the score is made

MP score 54/100: finishing works counts most

  1. Works completed 30%33Completed ÷ recommended works.
  2. Spending efficiency 20%77Value of completed works ÷ money paid out. Money paid without works finished scores low.
  3. Fund utilisation 15%73Value of works recommended ÷ allocated limit (MoSPI’s measure).
  4. Proof of work 15%34Share of completed works with photos or documents uploaded on eSAKSHI.
  5. Funds spent 10%28Paid to vendors ÷ allocated limit.
  6. Vendor diversity 10%
    i

    Members of Parliament (MPs) do not have direct, operational control over the specific vendors selected for government public works. However, they exert significant indirect influence by shaping procurement frameworks, passing supplier diversity laws, and conducting oversight.

    100
    How spread out payments are: full marks when no vendor gets over 20% of the money, none when one vendor gets everything.

Largest vendor: RAMESWAR NAIK, 14% of payments across 70 vendors.

District sanction speed

81/100 · sanction is the district authority’s job, so this doesn’t change the MP’s rank

  1. Sanction speed 100%81Average days to sanction (full marks within the 45-day guideline, none at a year), and the share of works not overdue.

Activity over time

Recommendations, payments and completions by month

Value of works MPs recommended each month

Who got paid

Top vendors by payments received

Implementing district authorities

The districts that sanction and execute this MP’s works

Works

603 works · the 60 most recent are listed here, all of them in the explorer · tap “Photos” to see geo-tagged photos from eSAKSHI

Open in explorer
  • Construction of CC road at Patra Sahi of Buruja Village, Burja GP, Laxmipur Block

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Koraput· #234696

    ₹2.5 L Completed 30 Oct 2026Rec. 16 Sep 2025Paid ₹2.5 L
  • Construction of Field Channel at Khajuriguda Champi, Village Champi, GP Champi, Laxmipur Block

    Irrigation, flood & environmentConstruction of public irrigation facilities· Koraput· #234709

    ₹2.5 L Completed 30 Oct 2026Rec. 16 Sep 2025Paid ₹2.5 L
  • Construction of CC Road for Tala Street at Village Dasamantpur, GP Dasamantpur, Block - Boipariguda

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Koraput· #321524

    ₹2.5 L Awaiting sanction · 17 daysRec. 15 Oct 2026
  • Const. of Culvert for Hanuman Nagar at Vill/GP/Block-Boipariguda.

    Roads & bridgesConstruction of culverts and bridges· Koraput· #321643

    ₹2.5 L Awaiting sanction · 17 daysRec. 15 Oct 2026
  • Const. of CC road from Electrical office road to Diamond field road at Vill/GP/Block-Boipariguda.

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Koraput· #321644

    ₹2.5 L Awaiting sanction · 17 daysRec. 15 Oct 2026
  • Const. of CC road for SC street at Ganiput, GP-Kollar, Block-Boipariguda.

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Koraput· #321645

    ₹2.5 L Awaiting sanction · 17 daysRec. 15 Oct 2026
  • Const. of CC road at Khaliguda, GP-Chipakur, Block-Boipariguda.

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Koraput· #321646

    ₹2.5 L Awaiting sanction · 17 daysRec. 15 Oct 2026
  • Const. of CC road for Bisoi Street at Majhiguda, GP-Doraguda, Block-Boipariguda.

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Koraput· #321648

    ₹2.5 L Awaiting sanction · 17 daysRec. 15 Oct 2026
  • Const. of CC road for Tala Street at Kadamguda, GP-Kenduguda, Block-Boipariguda.

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Koraput· #321649

    ₹2.5 L Awaiting sanction · 17 daysRec. 15 Oct 2026
  • Const. of CC road for Bhumia Street at Tangriguda, GP-Kenduguda, Block-Boipariguda.

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Koraput· #321650

    ₹2.5 L Awaiting sanction · 17 daysRec. 15 Oct 2026
  • Const. of CC road for Majhi Street at Basniguda, GP-Pujariguda, Block-Boipariguda.

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Koraput· #321651

    ₹2.5 L Awaiting sanction · 17 daysRec. 15 Oct 2026
  • Const. of CC road from ST street Kurkuti to Bhumia Street, GP-Badaput, Vill-Kurkuti, Block-Boipariguda.

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Koraput· #321655

    ₹2.5 L Awaiting sanction · 17 daysRec. 15 Oct 2026
  • Const. of CC road for Talo Street at Doraguda, GP-Chandrapada, Block-Boipariguda.

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Koraput· #321658

    ₹2.5 L Awaiting sanction · 17 daysRec. 15 Oct 2026
  • Const. of CC road at Bhejaguda, GP-Chandrapada, Block-Boipariguda.

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Koraput· #321661

    ₹2.0 L Awaiting sanction · 17 daysRec. 15 Oct 2026
  • Const. of CC road for Tala Street at Ladka Guda, GP-Mathapada, Block-Boipariguda.

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Koraput· #321664

    ₹2.5 L Awaiting sanction · 17 daysRec. 15 Oct 2026

18th Lok Sabha MPs from Odisha

Ranked by MP score

Compare
#MPUtilisationSpentCompletedScore
1Sambit Patra · Puri84%30%55272
2Shri Jual Oram · Sundargarh94%40%9166
3Sukanta Kumar Panigrahi · Kandhamal65%32%15559
4Shri Bhartruhari Mahtab · Cuttack99%31%8959
5Saptagiri Sankar Ulaka · Koraput73%28%20154
6Pradeep Purohit · Bargarh86%27%5252
7Balabhadra Majhi · Nabarangpur67%17%3449
8Anita Subhadarshini · Aska41%10%2648
9Malvika Devi · Kalahandi69%35%9647
10Naba Charan Majhi · Mayurbhanj99%32%2746
11Smt Aparajita Sarangi · Bhubaneswar74%25%4745
12Smt Sangeeta Kumari Singh Deo · Bolangir54%6.0%1245

Source: MoSPI eSAKSHI (eSAKSHI API (mplads.mospi.gov.in)). Fund utilisation = works recommended ÷ allocated limit (MoSPI’s definition); spent = vendor payments ÷ allocated limit; completion = completed ÷ recommended works. The MP score weighs completion, spending efficiency, utilisation, proof of work, spending and vendor diversity. How it’s calculated.