Payments concentrated with one vendor
53% of vendor payments went to KHIVRAJ MOTORS.
Allocated limit
₹14.70 Cr
Median ₹14.70 Cr
Fund utilisation
66%
₹9.75 Cr recommended · 13 works
Below median (70%)
Paid to vendors
₹4.73 Cr
32% of allocation
Above median (25%)
Works completed
0
0% of recommended
Below median (26%)
From recommendation to completion
Every work this MP recommended, by stage
- Recommended by the MP13 works
₹9.75 Cr · 66% of the ₹14.70 Cr allocated
- Sanctioned by the district13 works
100% sanctioned · took 2.9 months on average (due within 45 days)
- Completed0 works
₹0 final cost
In plain words
What the numbers say
- Recommended 13 works worth ₹9.75 Cr, a fund utilisation of 66%, higher than 44% of Rajya Sabha MPs.
- The district has sanctioned 13 of them, taking 2.9 months on average.
- ₹4.73 Cr has been paid to vendors, 32% of the allocation.
- 0 works are complete.
- The largest share of funds went to Health.
- Payments went to 6 vendors. The largest received 53%.
- No citizen ratings have been reported for completed works.
How the score is made
MP score 19/100: finishing works counts most
- Works completed 30%0Completed ÷ recommended works.
- Spending efficiency 20%0Value of completed works ÷ money paid out. Money paid without works finished scores low.
- Fund utilisation 15%66Value of works recommended ÷ allocated limit (MoSPI’s measure).
- Proof of work 15%0Share of completed works with photos or documents uploaded on eSAKSHI.
- Funds spent 10%32Paid to vendors ÷ allocated limit.
- Vendor diversity 10%58How spread out payments are: full marks when no vendor gets over 20% of the money, none when one vendor gets everything.
i
Members of Parliament (MPs) do not have direct, operational control over the specific vendors selected for government public works. However, they exert significant indirect influence by shaping procurement frameworks, passing supplier diversity laws, and conducting oversight.
Largest vendor: KHIVRAJ MOTORS, 53% of payments across 6 vendors.
District sanction speed
93/100 · sanction is the district authority’s job, so this doesn’t change the MP’s rank
- Sanction speed 100%93Average days to sanction (full marks within the 45-day guideline, none at a year), and the share of works not overdue.
Activity over time
Recommendations, payments and completions by month
Sectors
Value of works by category
Who got paid
Top vendors by payments received
Implementing district authorities
The districts that sanction and execute this MP’s works
Works
13 works · tap “Photos” to see geo-tagged photos from eSAKSHI
Construction of Harijora culvert - Barabazar Block
Roads & bridgesConstruction of culverts and bridges· Purulia· #262286
₹20.0 L Sanctioned · 29 May 2026Rec. 29 Jan 2026Construction of 1KM long 18ft wide PCC road at Chaupad village
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Purulia· #262301
₹32.5 L Sanctioned · 29 May 2026Rec. 29 Jan 2026Construction of 1 KM long 20ft wide PCC road with culvert 30ft into 20ft over Bhusudih canal from Bhakuadih Haat to Bhusudih village
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Purulia· #262312
₹60.0 L Sanctioned · 29 May 2026Rec. 29 Jan 2026Strengthening of road from Baram to Deolghata Prachin Mandir approx 1.5 KM under Arsha Development Block Purulia
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Purulia· #262352
₹52.5 L Sanctioned · 29 May 2026Rec. 29 Jan 2026Construction of PCC road from Arsha Road to Hirapuradardih via Keta village and Chatambari High School of 1.5 KM
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Purulia· #262377
₹52.5 L Sanctioned · 29 May 2026Rec. 29 Jan 2026Construction of PCC road from Borgora More to Baramisa Pull of 800 metre
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Purulia· #262382
₹35.0 L Sanctioned · 29 May 2026Rec. 29 Jan 2026Construction of PCC road 1KM long road from Futiyari Dam to Rangadi Village under Kalabani GP and 1KM long road from Hura Main Road to Dhanera village under Simla-Dhanara GP
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Purulia· #262895
₹70.0 L Sanctioned · 29 May 2026Rec. 29 Jan 2026Contruction of PCC road from C-Type Gate to Belkuda Ashwini Mukherjees house 1.5KM
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Purulia· #262905
₹50.0 L Sanctioned · 29 May 2026Rec. 29 Jan 2026Repair of 10KM long bituminous road from Subhas More to Santuri Block Office
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Purulia· #262908
₹70.0 L Sanctioned · 29 May 2026Rec. 29 Jan 2026Development of Footpath of M M Ali Road (Western Flank) by laying Paver Block from crossing of Sudhir Bose to crossing of Ekbalpore Road in ward no 77 under KMC.
Roads & bridgesConstruction of footpaths and pedestrian ways· Kolkata· #271177
₹2.5 L Sanctioned · 28 Feb 2026Rec. 26 Feb 2026Installation of three pumps from Jorobari village Booth No 220 and Golpara Uparpara ICDS centre and Ankro Barakadam Durjoy Para Booth No 243
Electricity & lightingPurchase of non-conventional energy system and devices for community use· Purulia· #262915
₹20.0 L Sanctioned · 27 Feb 2026Rec. 29 Jan 2026Installation of solar pumps from Rongiladi village 1 unit and Narayangar Majhi Para 1 unit under Kashipur GP and Lohet Kanthalpara 1 unit and Cheliya Kamarpara 1 unit under Kalidaha GP
Electricity & lightingPurchase of non-conventional energy system and devices for community use· Purulia· #262920
₹20.0 L Sanctioned · 27 Feb 2026Rec. 29 Jan 2026Purchase of Mobile Medical Unit
HealthPurchase of vehicle for mobile dispensaries (Four, three and two wheelers)· Kolkata· #171164
₹4.90 Cr Vendor Identification · 11 Feb 2025Rec. 4 Feb 2025Paid ₹4.73 Cr
Rajya Sabha MPs from West Bengal
Ranked by MP score
| # | MP | Utilisation | Spent | Completed | Score |
|---|---|---|---|---|---|
| 1 | Shri Nagendra Ray | 71% | 60% | 20 | 86 |
| 2 | Smt. Mamata Thakur | 37% | 30% | 52 | 69 |
| 3 | Shri Samik Bhattacharya | 56% | 19% | 10 | 49 |
| 4 | Ms. Dola Sen | 71% | 40% | 1 | 26 |
| 5 | Shri Mohammed Nadimul Haque | 66% | 31% | 1 | 24 |
| 6 | Shri Derek O' Brien | 71% | 41% | 0 | 21 |
| 7 | Shri Samirul Islam | 71% | 42% | 0 | 21 |
| 8 | Smt. Sagarika Ghose | 66% | 32% | 0 | 19 |
| 9 | Shri Prakash Chik Baraik | 81% | 0% | 0 | 17 |
| 10 | Shri Harsh Vardhan Shringla | 13% | 0% | 0 | 3 |
| 11 | Shri Biswajit Sinha (Rahul Sinha) | 1.4% | 0% | 0 | 0 |
| 12 | Shri Rajeev Kumar | 0% | 0% | 0 | 0 |
Source: MoSPI eSAKSHI (eSAKSHI API (mplads.mospi.gov.in)). Fund utilisation = works recommended ÷ allocated limit (MoSPI’s definition); spent = vendor payments ÷ allocated limit; completion = completed ÷ recommended works. The MP score weighs completion, spending efficiency, utilisation, proof of work, spending and vendor diversity. How it’s calculated.