Skip to content
MPLADSTracker
This is a record from the 17th Lok Sabha (2019–24). eSAKSHI covers its final year only, from April 2023. Comparisons are with other 17th Lok Sabha MPs.

MPLADS report card · 17th Lok Sabha

S. Jagathrakshakan

Lok SabhaArakkonam · Tamil Nadu

MP score87/100230th of 539 in the 17th Lok Sabha
31st of 39 from Tamil Nadu
Re-elected to the 18th Lok Sabha Then: 82% utilisation, 53 works completed, score 61.

Allocated limit

₹9.43 Cr

Median ₹8.60 Cr

Fund utilisation

92%

₹8.71 Cr recommended · 78 works
Below median (98%)

Paid to vendors

₹7.80 Cr

83% of allocation
Below median (88%)

Works completed

67

86% of recommended
About the median

From recommendation to completion

Every work this MP recommended, by stage

  1. Recommended by the MP78 works

    ₹8.71 Cr · 92% of the ₹9.43 Cr allocated

  2. Sanctioned by the district71 works

    91% sanctioned · took 5.7 months on average (due within 45 days)

  3. Completed67 works

    ₹7.07 Cr final cost · 10.8 months from recommendation on average

7 works are still awaiting sanction, 7 of them for more than 45 days.

In plain words

What the numbers say

  • Recommended 78 works worth ₹8.71 Cr, a fund utilisation of 92%, higher than 22% of 17th Lok Sabha MPs.
  • The district has sanctioned 71 of them, taking 5.7 months on average.
  • ₹7.80 Cr has been paid to vendors, 83% of the allocation.
  • 67 works are complete, typically 10.8 months after recommendation. 48 works have geo-tagged photos on eSAKSHI.
  • The largest share of funds went to Roads & bridges.
  • Payments went to 43 vendors. The largest received 10%.
  • No citizen ratings have been reported for completed works.

How the score is made

MP score 87/100: finishing works counts most

  1. Works completed 30%86Completed ÷ recommended works.
  2. Spending efficiency 20%91Value of completed works ÷ money paid out. Money paid without works finished scores low.
  3. Fund utilisation 15%92Value of works recommended ÷ allocated limit (MoSPI’s measure).
  4. Proof of work 15%72Share of completed works with photos or documents uploaded on eSAKSHI.
  5. Funds spent 10%83Paid to vendors ÷ allocated limit.
  6. Vendor diversity 10%
    i

    Members of Parliament (MPs) do not have direct, operational control over the specific vendors selected for government public works. However, they exert significant indirect influence by shaping procurement frameworks, passing supplier diversity laws, and conducting oversight.

    100
    How spread out payments are: full marks when no vendor gets over 20% of the money, none when one vendor gets everything.

Largest vendor: Raveendhra G, 10% of payments across 43 vendors.

District sanction speed

75/100 · sanction is the district authority’s job, so this doesn’t change the MP’s rank

  1. Sanction speed 100%75Average days to sanction (full marks within the 45-day guideline, none at a year), and the share of works not overdue.

Activity over time

Recommendations, payments and completions by month

Value of works MPs recommended each month

Who got paid

Top vendors by payments received

Implementing district authorities

The districts that sanction and execute this MP’s works

Works

78 works · the 60 most recent are listed here, all of them in the explorer · tap “Photos” to see geo-tagged photos from eSAKSHI

Open in explorer
  • Drilling of deep borewell and Installlation of Mini power pump at

    Drinking waterInstalling tube-wells and borewells· Ranipet· #41102

    ₹2.1 L Completed 7 Oct 2026Rec. 27 Oct 2023Paid ₹2.1 L
  • Drilling of Deep borewell and Installation of Mini power Pump

    Drinking waterInstalling tube-wells and borewells· Ranipet· #41103

    ₹2.1 L Completed 7 Oct 2026Rec. 27 Oct 2023Paid ₹2.1 L
  • Construction of Road Linking from Madhavan Nagar to Golden Nagar in Adi dravidar area

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Ranipet· #105599

    ₹19.0 L Completed 7 Oct 2026Rec. 15 Feb 2024Paid ₹19.0 L
  • construction of Road from kalivarikandigai gas godown kurukku street in Adi dravidar area

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Ranipet· #105600

    ₹4.5 L Completed 7 Oct 2026Rec. 15 Feb 2024Paid ₹4.5 L
  • Construction of Cremation Slab

    Community buildings & public spacesCrematoriums / Energy efficient crematoriums or structures on burial / cremation ground· Ranipet· #41104

    ₹8.4 L Completed 2 Sept 2026Rec. 27 Oct 2023Paid ₹8.4 L
  • Construction of Cement Concrete Drainage at Chandravilasapuram Panchayat in Vinayagar Koil Street

    Sanitation & drainageProviding drains and gutters for public drainage· Thiruvallur· #53319

    ₹10.0 L Completed 23 Feb 2026Rec. 27 Nov 2023Paid ₹10.0 L
  • Construction of Anganwadi building at Jp pettai 1st Street

    Education & librariesConstruction of buildings for crèches and anganwadies· Ranipet· #41101

    ₹15.0 L Completed 23 Oct 2025Rec. 27 Oct 2023Paid ₹15.0 L
  • Construction of Cooperative Society in Periya Kukkundi Village

    Safety & securityConstruction of Government office buildings (Post office, Police station, Police chauki, etc.)· Ranipet· #72276

    ₹13.9 L Completed 26 Jul 2025Rec. 31 Dec 2023Paid ₹13.9 L
  • construction of PDS shop in Anandali mathura village .Keezhputhpettai

    Education & librariesConstruction of buildings for crèches and anganwadies· Ranipet· #72289

    ₹13.8 L Completed 28 May 2025Rec. 31 Dec 2023Paid ₹13.8 L
  • Construction of Bus Shelter in Annaimallur Adi Dravidar Colony

    Community buildings & public spacesConstruction of bus-sheds or bus-stops· Ranipet· #72279

    ₹7.0 L Completed 24 Mar 2025Rec. 31 Dec 2023Paid ₹7.0 L
  • Contruction of Anganwadi Building in Bazaar street

    Education & librariesConstruction of buildings for crèches and anganwadies· Ranipet· #48716

    ₹15.0 L Completed 22 Mar 2025Rec. 11 Nov 2023Paid ₹15.0 L
  • Construction of Culvert Bridges

    Roads & bridgesConstruction of culverts and bridges· Ranipet· #72273

    ₹15.0 L Completed 21 Mar 2025Rec. 31 Dec 2023Paid ₹15.0 L
  • Construction of Community Hall at Thirowpathiyamman Koil Thidal

    Community buildings & public spacesConstruction of community centers and community halls· Vellore· #115782

    ₹80.0 L Physical Inspection · 17 Mar 2025Rec. 27 Feb 2024Paid ₹73.4 L
  • Construction of Community Building in Arapakkam Municpality

    Community buildings & public spacesConstruction of buildings for community cultural activities· Ranipet· #73929

    ₹10.9 L Completed 13 Mar 2025Rec. 3 Jan 2024Paid ₹10.9 L
  • Construction of Bus Shelter in Valayathoor Kootroad in Valayathoor

    Community buildings & public spacesConstruction of bus-sheds or bus-stops· Ranipet· #72278

    ₹7.0 L Completed 11 Mar 2025Rec. 31 Dec 2023Paid ₹7.0 L

17th Lok Sabha MPs from Tamil Nadu

Ranked by MP score

#MPUtilisationSpentCompletedScore
1A Ganeshamurthi · Erode100%100%10199
2Ganesan Selvam · Kancheepuram100%97%20697
3Dhanush M Kumar · Tenkasi100%99%21197
4S Gnanathiraviam · Tirunelveli97%94%9397
5Kanimozhi Karunanidhi · Thoothukkudi99%96%6297
6Thirumaa Valavan Thol · Chidambaram99%96%8196
7S Venkatesan · Madurai97%96%16596
8Kalanidhi Veeraswamy · Chennai North99%98%3296
9AKP Chinraj · Namakkal98%98%9396
10MK Vishnu Prasad · Arani100%100%10295
11TRVS Ramesh · Cuddalore96%89%11495
12M Selvaraj · Nagapattinam99%99%7695

Source: MoSPI eSAKSHI (eSAKSHI API (mplads.mospi.gov.in)). Fund utilisation = works recommended ÷ allocated limit (MoSPI’s definition); spent = vendor payments ÷ allocated limit; completion = completed ÷ recommended works. The MP score weighs completion, spending efficiency, utilisation, proof of work, spending and vendor diversity. How it’s calculated.