Skip to content
MPLADSTracker

MPLADS report card · 18th Lok Sabha

Smt Poonamben Hematbhai Maadam

Lok SabhaBJPJamnagar · Gujarat

MP score64/100169th of 542 in the 18th Lok Sabha
13th of 26 from Gujarat
Also an MP in the 17th Lok Sabha Then: 66% utilisation, 245 works completed, score 90.

Allocated limit

₹14.70 Cr

Median ₹14.70 Cr

Fund utilisation

57%

₹8.35 Cr recommended · 177 works
Below median (76%)

Paid to vendors

₹3.05 Cr

21% of allocation
Below median (37%)

Works completed

64

36% of recommended
Above median (28%)

From recommendation to completion

Every work this MP recommended, by stage

  1. Recommended by the MP177 works

    ₹8.35 Cr · 57% of the ₹14.70 Cr allocated

  2. Sanctioned by the district162 works

    92% sanctioned · took 4.3 months on average (due within 45 days)

  3. Completed64 works

    ₹2.71 Cr final cost · 10.5 months from recommendation on average

15 works are still awaiting sanction, 15 of them for more than 45 days.

In plain words

What the numbers say

  • Recommended 177 works worth ₹8.35 Cr, a fund utilisation of 57%, higher than 18% of 18th Lok Sabha MPs.
  • The district has sanctioned 162 of them, taking 4.3 months on average.
  • ₹3.05 Cr has been paid to vendors, 21% of the allocation.
  • 64 works are complete, typically 10.5 months after recommendation. 62 works have geo-tagged photos on eSAKSHI.
  • The largest share of funds went to Roads & bridges.
  • Payments went to 63 vendors. The largest received 4.9%.
  • No citizen ratings have been reported for completed works.

How the score is made

MP score 64/100: finishing works counts most

  1. Works completed 30%36Completed ÷ recommended works.
  2. Spending efficiency 20%89Value of completed works ÷ money paid out. Money paid without works finished scores low.
  3. Fund utilisation 15%57Value of works recommended ÷ allocated limit (MoSPI’s measure).
  4. Proof of work 15%97Share of completed works with photos or documents uploaded on eSAKSHI.
  5. Funds spent 10%21Paid to vendors ÷ allocated limit.
  6. Vendor diversity 10%
    i

    Members of Parliament (MPs) do not have direct, operational control over the specific vendors selected for government public works. However, they exert significant indirect influence by shaping procurement frameworks, passing supplier diversity laws, and conducting oversight.

    100
    How spread out payments are: full marks when no vendor gets over 20% of the money, none when one vendor gets everything.

Largest vendor: KHIMALIYA GRAM PANCHAYAT, 4.9% of payments across 63 vendors.

District sanction speed

82/100 · sanction is the district authority’s job, so this doesn’t change the MP’s rank

  1. Sanction speed 100%82Average days to sanction (full marks within the 45-day guideline, none at a year), and the share of works not overdue.

Activity over time

Recommendations, payments and completions by month

Value of works MPs recommended each month

Who got paid

Top vendors by payments received

Implementing district authorities

The districts that sanction and execute this MP’s works

Works

177 works · the 60 most recent are listed here, all of them in the explorer · tap “Photos” to see geo-tagged photos from eSAKSHI

Open in explorer
  • For the work of community hall in Shri Ahir Samaj Trust Samaj Wadi in Nana Garediya village of Dhrol taluka

    Community buildings & public spacesConstruction of community centers and community halls· Jamnagar· #257754

    ₹10.0 L Sanctioned · 29 Oct 2026Rec. 7 Jan 2026
  • For paver block work from Ramapira Chowk to Padar in Suvarda village.

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Jamnagar· #295442

    ₹3.5 L Sanctioned · 29 Oct 2026Rec. 16 Jul 2026
  • For the construction of a shed for the shelter of cows in the cowshed in Jivapar village of Jamnagar taluka

    Agriculture & animal careConstruction of shelters for animals· Jamnagar· #295611

    ₹5.0 L Sanctioned · 29 Oct 2026Rec. 16 Jul 2026
  • For work of CC road from Panghat to Mahajan wadi at Chela village of Jamnagar taluk

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Jamnagar· #295613

    ₹8.0 L Sanctioned · 29 Oct 2026Rec. 16 Jul 2026
  • For paver block work in the internal roads of the village in Vijaypur village of Bhanvad taluka.

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Devbhumi Dwarka· #296652

    ₹4.0 L Completed 29 Oct 2026Rec. 18 Jul 2026Paid ₹4.0 L
  • paverblocks in crematorium at Nawa Mokhana area

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Jamnagar· #299139

    ₹5.0 L Sanctioned · 29 Oct 2026Rec. 27 Jul 2026
  • For the work of a community hall in Vavdi village of Jodiya taluka.

    Community buildings & public spacesConstruction of community centers and community halls· Jamnagar· #299143

    ₹5.0 L Sanctioned · 29 Oct 2026Rec. 27 Jul 2026
  • For the work of missing paver blocks in Vavdi village of Jodiya taluka

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Jamnagar· #299144

    ₹2.5 L Sanctioned · 29 Oct 2026Rec. 27 Jul 2026
  • For the work of CC Road on the way from Rameshbhai Ranabhai Dangar's house to Devpara Primary School in Hamapar village of Dhrol taluka

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Jamnagar· #301653

    ₹5.0 L Sanctioned · 29 Oct 2026Rec. 6 Aug 2026
  • For the work of community hall in the Scheduled tribe area near the temple of Nagbai Mataji in Mokhana village

    Community buildings & public spacesConstruction of community centers and community halls· Devbhumi Dwarka· #213418

    ₹5.0 L Completed 23 Oct 2026Rec. 28 Jun 2025Paid ₹5.0 L
  • For the work of community hall in the main market next to the temple of Khodiyar Mataji in Motavagudad village of Dhrol taluka

    Community buildings & public spacesConstruction of community centers and community halls· Jamnagar· #296690

    ₹5.0 L Sanctioned · 19 Oct 2026Rec. 18 Jul 2026
  • For the work of a community hall in Sardar Nagar Society, Latipur village, Dhrol taluka

    Community buildings & public spacesConstruction of community centers and community halls· Jamnagar· #296709

    ₹5.0 L Sanctioned · 19 Oct 2026Rec. 18 Jul 2026
  • For paver block work from the garden to the highway in the cowshed in Latipur village of Dhrol taluka.

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Jamnagar· #296718

    ₹3.0 L Sanctioned · 19 Oct 2026Rec. 18 Jul 2026
  • For the work of CC road from Hareshbhai Punjabhai Mungra's shop to Jivrajbhai Ramani's house in Latipur village of Dhrol taluka.

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Jamnagar· #296720

    ₹4.0 L Sanctioned · 19 Oct 2026Rec. 18 Jul 2026
  • For flood protection wall work near the Scheduled Caste crematorium in Hamapar village of Dhrol taluka.

    Irrigation, flood & environmentConstruction of flood control embankments/protection walls along riverbanks, hilltops, roadsides· Jamnagar· #296743

    ₹5.0 L Sanctioned · 19 Oct 2026Rec. 18 Jul 2026

18th Lok Sabha MPs from Gujarat

Ranked by MP score

Compare
#MPUtilisationSpentCompletedScore
1C R Patil · Navsari83%48%27881
2Bharatbhai Manubhai Sutariya · Amreli90%47%20076
3Mansukhbhai Dhanjibhai Vasava · Bharuch81%47%23171
4Bharatsinhji Shankarji Dabhi · Patan88%57%16271
5Rajeshbhai Naranbhai Chudasama · Junagadh98%41%15771
6Mukeshkumar Chandrakaant Dalal · Surat83%29%10969
7Shobhanaben Mahendrasinh Baraiya · Sabarkantha77%43%13167
8Parshottambhai Rupala · Rajkot91%30%11567
9Dhaval Laxmanbhai Patel · Valsad64%30%7866
10Mitesh Rameshbhai Bakabhai Patel · Anand83%53%26765
11Dr. Mansukh Mandaviya · Porbandar96%28%8264
12Jaswantsinh Sumanbhai Bhabhor · Dahod90%21%9964

Source: MoSPI eSAKSHI (eSAKSHI API (mplads.mospi.gov.in)). Fund utilisation = works recommended ÷ allocated limit (MoSPI’s definition); spent = vendor payments ÷ allocated limit; completion = completed ÷ recommended works. The MP score weighs completion, spending efficiency, utilisation, proof of work, spending and vendor diversity. How it’s calculated.