Skip to content
MPLADSTracker

MPLADS report card · 18th Lok Sabha

Mian Altaf Ahmad

Lok SabhaJKNCAnantnag · Jammu and Kashmir

MP score52/100337th of 542 in the 18th Lok Sabha
5th of 5 from Jammu and Kashmir

Allocated limit

₹15.48 Cr

Median ₹14.70 Cr

Fund utilisation

93%

₹14.33 Cr recommended · 143 works
Above median (76%)

Paid to vendors

₹3.28 Cr

21% of allocation
Below median (37%)

Works completed

22

15% of recommended
Below median (28%)

From recommendation to completion

Every work this MP recommended, by stage

  1. Recommended by the MP143 works

    ₹14.33 Cr · 93% of the ₹15.48 Cr allocated

  2. Sanctioned by the district131 works

    92% sanctioned · took 50 days on average (due within 45 days)

  3. Completed22 works

    ₹1.12 Cr final cost · 9.6 months from recommendation on average

12 works are still awaiting sanction, 2 of them for more than 45 days.

In plain words

What the numbers say

  • Recommended 143 works worth ₹14.33 Cr, a fund utilisation of 93%, higher than 79% of 18th Lok Sabha MPs.
  • The district has sanctioned 131 of them, taking 50 days on average.
  • ₹3.28 Cr has been paid to vendors, 21% of the allocation.
  • 22 works are complete, typically 9.6 months after recommendation. 21 works have geo-tagged photos on eSAKSHI.
  • The largest share of funds went to Health.
  • Payments went to 32 vendors. The largest received 21%.
  • No citizen ratings have been reported for completed works.

How the score is made

MP score 52/100: finishing works counts most

  1. Works completed 30%15Completed ÷ recommended works.
  2. Spending efficiency 20%34Value of completed works ÷ money paid out. Money paid without works finished scores low.
  3. Fund utilisation 15%93Value of works recommended ÷ allocated limit (MoSPI’s measure).
  4. Proof of work 15%95Share of completed works with photos or documents uploaded on eSAKSHI.
  5. Funds spent 10%21Paid to vendors ÷ allocated limit.
  6. Vendor diversity 10%
    i

    Members of Parliament (MPs) do not have direct, operational control over the specific vendors selected for government public works. However, they exert significant indirect influence by shaping procurement frameworks, passing supplier diversity laws, and conducting oversight.

    99
    How spread out payments are: full marks when no vendor gets over 20% of the money, none when one vendor gets everything.

Largest vendor: MASRAT SIDIQ GILKAR, 21% of payments across 32 vendors.

District sanction speed

98/100 · sanction is the district authority’s job, so this doesn’t change the MP’s rank

  1. Sanction speed 100%98Average days to sanction (full marks within the 45-day guideline, none at a year), and the share of works not overdue.

Activity over time

Recommendations, payments and completions by month

Value of works MPs recommended each month

Who got paid

Top vendors by payments received

Implementing district authorities

The districts that sanction and execute this MP’s works

Works

143 works · the 60 most recent are listed here, all of them in the explorer · tap “Photos” to see geo-tagged photos from eSAKSHI

Open in explorer
  • augmentation of 25kva to 63 kva at saaskhudan kapran

    Electricity & lightingImprovement of electricity distribution infrastructure· Anantnag· #304159

    ₹3.1 L Sanctioned · 29 Oct 2026Rec. 15 Aug 2026
  • construction of cement concrete lining wall on RS of zamindari khul BWO modijan ladh near pandith mohalla y k pora qazigund

    Irrigation, flood & environmentConstruction of flood control embankments/protection walls along riverbanks, hilltops, roadsides· Anantnag· #324096

    ₹2.4 L Awaiting sanction · 9 daysRec. 23 Oct 2026
  • construction of link road with drain from main road todangi mohalla pakhtoon pora wantrag mattan

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Anantnag· #324098

    ₹3.5 L Awaiting sanction · 9 daysRec. 23 Oct 2026
  • construction of 600 m,eter link road from main road to mohalla moori w no 4 Lathoong

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Poonch· #324100

    ₹13.0 L Awaiting sanction · 9 daysRec. 23 Oct 2026
  • construction of link road to mohalla som raj ward no. 3 doongi challas road pyt dherian block doongi

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Rajouri· #324105

    ₹8.0 L Awaiting sanction · 9 daysRec. 23 Oct 2026
  • construction of bathroom near masjid shrief mohalla uddari marhote ward no 6 panchayat hill hundian block surankote

    Sanitation & drainageConstruction of public toilets and bathrooms· Poonch· #324110

    ₹6.3 L Awaiting sanction · 9 daysRec. 23 Oct 2026
  • construction of toilet bathroom at madrasa zaiya ul quran traranwali block buffliaz

    Sanitation & drainageConstruction of public toilets and bathrooms· Poonch· #324111

    ₹10.0 L Awaiting sanction · 9 daysRec. 23 Oct 2026
  • construction of 13 mtr span steel foot bridge over sabzi nallah NHO mohd hussain s/o dil mohd r/o lower dodaj -c

    Roads & bridgesConstruction of culverts and bridges· Rajouri· #324112

    ₹27.6 L Awaiting sanction · 9 daysRec. 23 Oct 2026
  • construction of foot bridge at paswal mohalla kuller ward no 7 pahalgam

    Roads & bridgesConstruction of culverts and bridges· Anantnag· #324114

    ₹2.6 L Awaiting sanction · 9 daysRec. 23 Oct 2026
  • construction of culvert at mohalla soniwali katha nlo zanaid ch ward no 6 panchayat dhoke block thanmandi rajouri

    Roads & bridgesConstruction of culverts and bridges· Rajouri· #324115

    ₹6.0 L Awaiting sanction · 9 daysRec. 23 Oct 2026
  • additional amount for purchase of tata magic petrol ambulance 6 p BS 6 k p colony vessu kulgam

    HealthPurchase of ambulances (Four, Three and Two wheelers)· Kulgam· #324118

    ₹29,000 Awaiting sanction · 9 daysRec. 23 Oct 2026
  • levelling of school ground and construction of tile path at Government middle school badaran block phalgam

    Roads & bridgesConstruction of footpaths and pedestrian ways· Anantnag· #304164

    ₹2.8 L Sanctioned · 22 Oct 2026Rec. 15 Aug 2026
  • c/o crossing at tulpath ara-khoshipora block shahabad

    Safety & securitySecurity gates in streets/public place for safety purpose· Anantnag· #304203

    ₹4.5 L Sanctioned · 22 Oct 2026Rec. 15 Aug 2026
  • c/o crossing at kumar mohalla tangloo over nallah trumbdi block hiller shahabad

    Roads & bridgesConstruction of culverts and bridges· Anantnag· #304208

    ₹3.5 L Sanctioned · 22 Oct 2026Rec. 15 Aug 2026
  • c/o crossing NHO movli bashir ahmad dar and others at nagam block breng

    Roads & bridgesConstruction of culverts and bridges· Anantnag· #304209

    ₹2.0 L Sanctioned · 22 Oct 2026Rec. 15 Aug 2026

18th Lok Sabha MPs from Jammu and Kashmir

Ranked by MP score

Compare
#MPUtilisationSpentCompletedScore
1Jitendra Singh · Udhampur81%36%19574
2Aga Syed Ruhullah Mehdi · Srinagar99%17%6662
3Shri Jugal Kishore Sharma · Jammu78%24%5155
4Abdul Rashid Sheikh · Baramullah60%22%5053
5Mian Altaf Ahmad · Anantnag93%21%2252

Source: MoSPI eSAKSHI (eSAKSHI API (mplads.mospi.gov.in)). Fund utilisation = works recommended ÷ allocated limit (MoSPI’s definition); spent = vendor payments ÷ allocated limit; completion = completed ÷ recommended works. The MP score weighs completion, spending efficiency, utilisation, proof of work, spending and vendor diversity. How it’s calculated.