MPLADS report card · 18th Lok Sabha

Manoj Tiwari

Lok SabhaBJPNorth East Delhi · Delhi

MP score41/100438th of 542 in the 18th Lok Sabha
7th of 7 from Delhi
Also an MP in the 17th Lok Sabha Then: 67% utilisation, 30 works completed, score 69.
  • Payments concentrated with one vendor

    76% of vendor payments went to Central Electronics Limited.

Allocated limit

₹22.58 Cr

Median ₹14.70 Cr

Fund utilisation

57%

₹12.91 Cr recommended · 24 works
Below median (76%)

Paid to vendors

₹2.97 Cr

13% of allocation
Below median (37%)

Works completed

7

29% of recommended
About the median

From recommendation to completion

Every work this MP recommended, by stage

  1. Recommended by the MP24 works

    ₹12.91 Cr · 57% of the ₹22.58 Cr allocated

  2. Sanctioned by the district16 works

    67% sanctioned · took 3.3 months on average (due within 45 days)

  3. Completed7 works

    ₹68.4 L final cost · 13.1 months from recommendation on average

8 works are still awaiting sanction, 8 of them for more than 45 days.

In plain words

What the numbers say

  • Recommended 24 works worth ₹12.91 Cr, a fund utilisation of 57%, higher than 19% of 18th Lok Sabha MPs.
  • The district has sanctioned 16 of them, taking 3.3 months on average.
  • ₹2.97 Cr has been paid to vendors, 13% of the allocation.
  • 7 works are complete, typically 13.1 months after recommendation. 7 works have geo-tagged photos on eSAKSHI.
  • The largest share of funds went to Safety & security.
  • Payments went to 8 vendors. The largest received 76%.
  • No citizen ratings have been reported for completed works.

How the score is made

MP score 41/100: finishing works counts most

  1. Works completed 30%29Completed ÷ recommended works.
  2. Spending efficiency 20%23Value of completed works ÷ money paid out. Money paid without works finished scores low.
  3. Fund utilisation 15%57Value of works recommended ÷ allocated limit (MoSPI’s measure).
  4. Proof of work 15%100Share of completed works with photos or documents uploaded on eSAKSHI.
  5. Funds spent 10%13Paid to vendors ÷ allocated limit.
  6. Vendor diversity 10%
    i

    Members of Parliament (MPs) do not have direct, operational control over the specific vendors selected for government public works. However, they exert significant indirect influence by shaping procurement frameworks, passing supplier diversity laws, and conducting oversight.

    30
    How spread out payments are: full marks when no vendor gets over 20% of the money, none when one vendor gets everything.

Largest vendor: Central Electronics Limited, 76% of payments across 8 vendors.

District sanction speed

75/100 · sanction is the district authority’s job, so this doesn’t change the MP’s rank

  1. Sanction speed 100%75Average days to sanction (full marks within the 45-day guideline, none at a year), and the share of works not overdue.

Activity over time

Recommendations, payments and completions by month

Value of works MPs recommended each month

Who got paid

Top vendors by payments received

Implementing district authorities

The districts that sanction and execute this MP’s works

Works

24 works · tap “Photos” to see geo-tagged photos from eSAKSHI

Open in explorer
  • Provision of 01 no Semi High Mast Poles with LED Lights for proper illumination in water body Park/chhatt Puja Park Tahirpur Dilshad Garden North East Delhi under EEE I Shahdara North Zone

    Electricity & lightingLighting of public spaces· North East· #316889

    ₹1.8 L Sanctioned · 1 Oct 2026Rec. 22 Sep 2026
  • Providing and fixing of SHM Poles with LED Lights

    Electricity & lightingStreet lights· North East· #249186

    ₹10.8 L Completed 29 Sept 2026Rec. 18 Nov 2025Paid ₹10.8 L
  • Installation of 200 Smart Al Surveillance based CCTV Cameras and Integrated Public Safety System

    Safety & securityProviding CCTV camera system for security of public areas· Central· #315523

    ₹3.00 Cr Awaiting sanction · 46 daysRec. 16 Sep 2026
  • Provision of 1000 Precast RCC Benches with Back rest

    Community buildings & public spacesFitting of sitting RCC Benches in public places· East· #277012

    ₹54.0 L Sanctioned · 25 Aug 2026Rec. 31 Mar 2026
  • Installing of 14 units water cooler with water purifier (100 LPH)

    Drinking waterInstalling community drinking water plants· Central· #304742

    ₹63.5 L Awaiting sanction · 76 daysRec. 17 Aug 2026
  • Provision of Lighting arrangment with street light & Poles

    Electricity & lightingLighting of public spaces· North East· #290397

    ₹22.8 L Sanctioned · 11 Aug 2026Rec. 30 Jun 2026
  • Provision of Lighting arrangment with Street Light Poles

    Electricity & lightingLighting of public spaces· North East· #290401

    ₹22.2 L Sanctioned · 11 Aug 2026Rec. 30 Jun 2026
  • Provision of Lighting arrangement with Street light poles

    Electricity & lightingStreet lights· East· #146721

    ₹10.5 L Completed 6 Aug 2026Rec. 10 Oct 2024Paid ₹10.5 L
  • provision of lighting arrangement with street light poles

    Electricity & lightingStreet lights· East· #146722

    ₹9.0 L Completed 6 Aug 2026Rec. 10 Oct 2024Paid ₹9.0 L
  • provision of 12 mtr SHM pole at Veer Sawarkar Hospital road, Shiv Vihar Tiraha and Near Yamuna Dairy. Dayalpur Ward No. 242, North-East Delhi

    Electricity & lightingStreet lights· East· #234324

    ₹13.4 L Completed 28 Jul 2026Rec. 15 Sep 2025Paid ₹13.4 L
  • Installation of Smart AI Surveillance based CCTV cameras and Integrated Public Safety System.

    Safety & securityProviding CCTV camera system for security of public areas· East· #286942

    ₹1.00 Cr Awaiting sanction · 136 daysRec. 18 Jun 2026
  • Installation of Smart AI Surveillance based CCTV cameras and Integrated Public Safety System.

    Safety & securityProviding CCTV camera system for security of public areas· East· #286943

    ₹1.00 Cr Awaiting sanction · 136 daysRec. 18 Jun 2026
  • Installation of Smart AI Surveillance based CCTV cameras and Integrated Public Safety System.

    Safety & securityProviding CCTV camera system for security of public areas· East· #286944

    ₹1.00 Cr Awaiting sanction · 136 daysRec. 18 Jun 2026
  • Installation of Smart AI Surveillance based CCTV cameras and Integrated Public Safety System.

    Safety & securityProviding CCTV camera system for security of public areas· East· #286945

    ₹1.00 Cr Awaiting sanction · 136 daysRec. 18 Jun 2026
  • Provision of SHM Pole with LED Lights

    Electricity & lightingStreet lights· Central· #236965

    ₹7.0 L Completed 26 Mar 2026Rec. 23 Sep 2025Paid ₹7.0 L

18th Lok Sabha MPs from Delhi

Ranked by MP score

Compare
#MPUtilisationSpentCompletedScore
1Kamaljeet Sehrawat · West Delhi63%11%3266
2Praveen Khandelwal · Chandini Chowk43%21%3865
3Harsh Malhotra · East Delhi53%25%6564
4Bansuri Swaraj · New Delhi46%19%4762
5Ramvir Singh Bidhuri · South Delhi88%25%4362
6Yogendra Chandoliya · North West Delhi62%10%1151
7Manoj Tiwari · North East Delhi57%13%741

Source: MoSPI eSAKSHI (eSAKSHI API (mplads.mospi.gov.in)). Fund utilisation = works recommended ÷ allocated limit (MoSPI’s definition); spent = vendor payments ÷ allocated limit; completion = completed ÷ recommended works. The MP score weighs completion, spending efficiency, utilisation, proof of work, spending and vendor diversity. How it’s calculated.