Skip to content
MPLADSTracker

MPLADS report card · 18th Lok Sabha

Haribhai Patel

Lok SabhaBJPMahesana · Gujarat

MP score55/100298th of 542 in the 18th Lok Sabha
22nd of 26 from Gujarat

Allocated limit

₹15.39 Cr

Median ₹14.70 Cr

Fund utilisation

81%

₹12.43 Cr recommended · 654 works
Above median (76%)

Paid to vendors

₹5.76 Cr

37% of allocation
About the median

Works completed

150

23% of recommended
Below median (28%)

From recommendation to completion

Every work this MP recommended, by stage

  1. Recommended by the MP654 works

    ₹12.43 Cr · 81% of the ₹15.39 Cr allocated

  2. Sanctioned by the district516 works

    79% sanctioned · took 4.0 months on average (due within 45 days)

  3. Completed150 works

    ₹2.79 Cr final cost · 7.1 months from recommendation on average

138 works are still awaiting sanction, 101 of them for more than 45 days.

In plain words

What the numbers say

  • Recommended 654 works worth ₹12.43 Cr, a fund utilisation of 81%, higher than 57% of 18th Lok Sabha MPs.
  • The district has sanctioned 516 of them, taking 4.0 months on average.
  • ₹5.76 Cr has been paid to vendors, 37% of the allocation.
  • 150 works are complete, typically 7.1 months after recommendation. 121 works have geo-tagged photos on eSAKSHI.
  • The largest share of funds went to Roads & bridges.
  • Payments went to 222 vendors. The largest received 4.8%.
  • No citizen ratings have been reported for completed works.

How the score is made

MP score 55/100: finishing works counts most

  1. Works completed 30%23Completed ÷ recommended works.
  2. Spending efficiency 20%48Value of completed works ÷ money paid out. Money paid without works finished scores low.
  3. Fund utilisation 15%81Value of works recommended ÷ allocated limit (MoSPI’s measure).
  4. Proof of work 15%81Share of completed works with photos or documents uploaded on eSAKSHI.
  5. Funds spent 10%37Paid to vendors ÷ allocated limit.
  6. Vendor diversity 10%
    i

    Members of Parliament (MPs) do not have direct, operational control over the specific vendors selected for government public works. However, they exert significant indirect influence by shaping procurement frameworks, passing supplier diversity laws, and conducting oversight.

    100
    How spread out payments are: full marks when no vendor gets over 20% of the money, none when one vendor gets everything.

Largest vendor: AMICHANDBHAI PATEL GROUP SERVICES, 4.8% of payments across 222 vendors.

District sanction speed

80/100 · sanction is the district authority’s job, so this doesn’t change the MP’s rank

  1. Sanction speed 100%80Average days to sanction (full marks within the 45-day guideline, none at a year), and the share of works not overdue.

Activity over time

Recommendations, payments and completions by month

Value of works MPs recommended each month

Who got paid

Top vendors by payments received

Implementing district authorities

The districts that sanction and execute this MP’s works

Works

654 works · the 60 most recent are listed here, all of them in the explorer · tap “Photos” to see geo-tagged photos from eSAKSHI

Open in explorer
  • Construction of Incomplete RCC road work from Senma Kamuben Bhikhabhai house to Rajput Bhalabhai Takhaji house

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Mahesana· #308845

    ₹1.0 L Sanctioned · 30 Oct 2026Rec. 27 Aug 2026
  • Construction of Incomplete CC road work from High School to Goga Chowk

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Mahesana· #308846

    ₹2.0 L Sanctioned · 30 Oct 2026Rec. 27 Aug 2026
  • Construction of RCC road Work towards Charmkund in the scheduled area

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Mahesana· #308849

    ₹1.5 L Sanctioned · 30 Oct 2026Rec. 27 Aug 2026
  • Construction of RCC road Work from Devipujak area towards Chaudhary Virambhai Haribhai house

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Mahesana· #308850

    ₹1.0 L Sanctioned · 30 Oct 2026Rec. 27 Aug 2026
  • Construction of RCC road Work from Bhikhumiya Hashmahamad house towards Surabkhan Mirkhan house

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Mahesana· #308851

    ₹1.0 L Sanctioned · 30 Oct 2026Rec. 27 Aug 2026
  • Construction of incomplete flood protection wall work From Timbavas Corner to Rabari Jamabhai Sartanbhai wall

    Community buildings & public spacesConstruction of boundary walls of existing public and community buildings· Mahesana· #308862

    ₹1.0 L Sanctioned · 30 Oct 2026Rec. 27 Aug 2026
  • Construction of a water tank for drinking water for children in Rajgarh Primary School

    Drinking waterConstruction of water tanks· Mahesana· #308869

    ₹1.0 L Sanctioned · 30 Oct 2026Rec. 27 Aug 2026
  • Construction of compound wall Work of the primary school

    Community buildings & public spacesConstruction of boundary walls of existing public and community buildings· Mahesana· #308870

    ₹1.0 L Sanctioned · 30 Oct 2026Rec. 27 Aug 2026
  • Construction of RCC Road work from near the Sulai Mata temple in Sunshi village towards the house of Patel Dwarkadas Kashiramdas

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Mahesana· #308872

    ₹1.0 L Sanctioned · 30 Oct 2026Rec. 27 Aug 2026
  • CONSTRUCTION OF RCC PAVER BLOCK WORK ON BOTH SIDE OF CC ROAD FROM GRAM PANCHAYAT TO SANJAY PATEL HOUSE

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Mahesana· #324534

    ₹1.0 L Awaiting sanction · 3 daysRec. 29 Oct 2026
  • Construction of RCC Road from Chaudhary Fuljibhai Virsangbhai house to Public Library

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Mahesana· #324535

    ₹2.0 L Awaiting sanction · 3 daysRec. 29 Oct 2026
  • Construction of RCC Paver Block work near Panchvati to Neelkanth Mahadev Temple for public place

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Mahesana· #324536

    ₹2.5 L Awaiting sanction · 3 daysRec. 29 Oct 2026
  • Construction of New room in S.C crematorium

    Community buildings & public spacesCrematoriums / Energy efficient crematoriums or structures on burial / cremation ground· Mahesana· #324537

    ₹1.0 L Awaiting sanction · 3 daysRec. 29 Oct 2026
  • Construction of Shelter in S.C crematorium

    Community buildings & public spacesCrematoriums / Energy efficient crematoriums or structures on burial / cremation ground· Mahesana· #324538

    ₹1.0 L Awaiting sanction · 3 daysRec. 29 Oct 2026
  • Construction of RCC Paver Block work near Varahi Mata Chock for public place

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Mahesana· #324539

    ₹1.5 L Awaiting sanction · 3 daysRec. 29 Oct 2026

18th Lok Sabha MPs from Gujarat

Ranked by MP score

Compare
#MPUtilisationSpentCompletedScore
1C R Patil · Navsari83%48%27881
2Bharatbhai Manubhai Sutariya · Amreli90%47%20076
3Mansukhbhai Dhanjibhai Vasava · Bharuch81%47%23171
4Bharatsinhji Shankarji Dabhi · Patan88%57%16271
5Rajeshbhai Naranbhai Chudasama · Junagadh98%41%15771
6Mukeshkumar Chandrakaant Dalal · Surat83%29%10969
7Shobhanaben Mahendrasinh Baraiya · Sabarkantha77%43%13167
8Parshottambhai Rupala · Rajkot91%30%11567
9Dhaval Laxmanbhai Patel · Valsad64%30%7866
10Mitesh Rameshbhai Bakabhai Patel · Anand83%53%26765
11Dr. Mansukh Mandaviya · Porbandar96%28%8264
12Jaswantsinh Sumanbhai Bhabhor · Dahod90%21%9964

Source: MoSPI eSAKSHI (eSAKSHI API (mplads.mospi.gov.in)). Fund utilisation = works recommended ÷ allocated limit (MoSPI’s definition); spent = vendor payments ÷ allocated limit; completion = completed ÷ recommended works. The MP score weighs completion, spending efficiency, utilisation, proof of work, spending and vendor diversity. How it’s calculated.