22nd of 26 from Gujarat
Allocated limit
₹15.39 Cr
Median ₹14.70 Cr
Fund utilisation
81%
₹12.43 Cr recommended · 654 works
Above median (76%)
Paid to vendors
₹5.76 Cr
37% of allocation
About the median
Works completed
150
23% of recommended
Below median (28%)
From recommendation to completion
Every work this MP recommended, by stage
- Recommended by the MP654 works
₹12.43 Cr · 81% of the ₹15.39 Cr allocated
- Sanctioned by the district516 works
79% sanctioned · took 4.0 months on average (due within 45 days)
- Completed150 works
₹2.79 Cr final cost · 7.1 months from recommendation on average
138 works are still awaiting sanction, 101 of them for more than 45 days.
In plain words
What the numbers say
- Recommended 654 works worth ₹12.43 Cr, a fund utilisation of 81%, higher than 57% of 18th Lok Sabha MPs.
- The district has sanctioned 516 of them, taking 4.0 months on average.
- ₹5.76 Cr has been paid to vendors, 37% of the allocation.
- 150 works are complete, typically 7.1 months after recommendation. 121 works have geo-tagged photos on eSAKSHI.
- The largest share of funds went to Roads & bridges.
- Payments went to 222 vendors. The largest received 4.8%.
- No citizen ratings have been reported for completed works.
How the score is made
MP score 55/100: finishing works counts most
- Works completed 30%23Completed ÷ recommended works.
- Spending efficiency 20%48Value of completed works ÷ money paid out. Money paid without works finished scores low.
- Fund utilisation 15%81Value of works recommended ÷ allocated limit (MoSPI’s measure).
- Proof of work 15%81Share of completed works with photos or documents uploaded on eSAKSHI.
- Funds spent 10%37Paid to vendors ÷ allocated limit.
- Vendor diversity 10%100How spread out payments are: full marks when no vendor gets over 20% of the money, none when one vendor gets everything.
i
Members of Parliament (MPs) do not have direct, operational control over the specific vendors selected for government public works. However, they exert significant indirect influence by shaping procurement frameworks, passing supplier diversity laws, and conducting oversight.
Largest vendor: AMICHANDBHAI PATEL GROUP SERVICES, 4.8% of payments across 222 vendors.
District sanction speed
80/100 · sanction is the district authority’s job, so this doesn’t change the MP’s rank
- Sanction speed 100%80Average days to sanction (full marks within the 45-day guideline, none at a year), and the share of works not overdue.
Activity over time
Recommendations, payments and completions by month
Sectors
Value of works by category
Who got paid
Top vendors by payments received
Implementing district authorities
The districts that sanction and execute this MP’s works
Works
654 works · the 60 most recent are listed here, all of them in the explorer · tap “Photos” to see geo-tagged photos from eSAKSHI
Construction of Incomplete RCC road work from Senma Kamuben Bhikhabhai house to Rajput Bhalabhai Takhaji house
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Mahesana· #308845
₹1.0 L Sanctioned · 30 Oct 2026Rec. 27 Aug 2026Construction of Incomplete CC road work from High School to Goga Chowk
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Mahesana· #308846
₹2.0 L Sanctioned · 30 Oct 2026Rec. 27 Aug 2026Construction of RCC road Work towards Charmkund in the scheduled area
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Mahesana· #308849
₹1.5 L Sanctioned · 30 Oct 2026Rec. 27 Aug 2026Construction of RCC road Work from Devipujak area towards Chaudhary Virambhai Haribhai house
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Mahesana· #308850
₹1.0 L Sanctioned · 30 Oct 2026Rec. 27 Aug 2026Construction of RCC road Work from Bhikhumiya Hashmahamad house towards Surabkhan Mirkhan house
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Mahesana· #308851
₹1.0 L Sanctioned · 30 Oct 2026Rec. 27 Aug 2026Construction of incomplete flood protection wall work From Timbavas Corner to Rabari Jamabhai Sartanbhai wall
Community buildings & public spacesConstruction of boundary walls of existing public and community buildings· Mahesana· #308862
₹1.0 L Sanctioned · 30 Oct 2026Rec. 27 Aug 2026Construction of a water tank for drinking water for children in Rajgarh Primary School
Drinking waterConstruction of water tanks· Mahesana· #308869
₹1.0 L Sanctioned · 30 Oct 2026Rec. 27 Aug 2026Construction of compound wall Work of the primary school
Community buildings & public spacesConstruction of boundary walls of existing public and community buildings· Mahesana· #308870
₹1.0 L Sanctioned · 30 Oct 2026Rec. 27 Aug 2026Construction of RCC Road work from near the Sulai Mata temple in Sunshi village towards the house of Patel Dwarkadas Kashiramdas
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Mahesana· #308872
₹1.0 L Sanctioned · 30 Oct 2026Rec. 27 Aug 2026CONSTRUCTION OF RCC PAVER BLOCK WORK ON BOTH SIDE OF CC ROAD FROM GRAM PANCHAYAT TO SANJAY PATEL HOUSE
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Mahesana· #324534
₹1.0 L Awaiting sanction · 3 daysRec. 29 Oct 2026Construction of RCC Road from Chaudhary Fuljibhai Virsangbhai house to Public Library
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Mahesana· #324535
₹2.0 L Awaiting sanction · 3 daysRec. 29 Oct 2026Construction of RCC Paver Block work near Panchvati to Neelkanth Mahadev Temple for public place
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Mahesana· #324536
₹2.5 L Awaiting sanction · 3 daysRec. 29 Oct 2026Construction of New room in S.C crematorium
Community buildings & public spacesCrematoriums / Energy efficient crematoriums or structures on burial / cremation ground· Mahesana· #324537
₹1.0 L Awaiting sanction · 3 daysRec. 29 Oct 2026Construction of Shelter in S.C crematorium
Community buildings & public spacesCrematoriums / Energy efficient crematoriums or structures on burial / cremation ground· Mahesana· #324538
₹1.0 L Awaiting sanction · 3 daysRec. 29 Oct 2026Construction of RCC Paver Block work near Varahi Mata Chock for public place
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Mahesana· #324539
₹1.5 L Awaiting sanction · 3 daysRec. 29 Oct 2026
18th Lok Sabha MPs from Gujarat
Ranked by MP score
| # | MP | Utilisation | Spent | Completed | Score |
|---|---|---|---|---|---|
| 1 | C R Patil · Navsari | 83% | 48% | 278 | 81 |
| 2 | Bharatbhai Manubhai Sutariya · Amreli | 90% | 47% | 200 | 76 |
| 3 | Mansukhbhai Dhanjibhai Vasava · Bharuch | 81% | 47% | 231 | 71 |
| 4 | Bharatsinhji Shankarji Dabhi · Patan | 88% | 57% | 162 | 71 |
| 5 | Rajeshbhai Naranbhai Chudasama · Junagadh | 98% | 41% | 157 | 71 |
| 6 | Mukeshkumar Chandrakaant Dalal · Surat | 83% | 29% | 109 | 69 |
| 7 | Shobhanaben Mahendrasinh Baraiya · Sabarkantha | 77% | 43% | 131 | 67 |
| 8 | Parshottambhai Rupala · Rajkot | 91% | 30% | 115 | 67 |
| 9 | Dhaval Laxmanbhai Patel · Valsad | 64% | 30% | 78 | 66 |
| 10 | Mitesh Rameshbhai Bakabhai Patel · Anand | 83% | 53% | 267 | 65 |
| 11 | Dr. Mansukh Mandaviya · Porbandar | 96% | 28% | 82 | 64 |
| 12 | Jaswantsinh Sumanbhai Bhabhor · Dahod | 90% | 21% | 99 | 64 |
Source: MoSPI eSAKSHI (eSAKSHI API (mplads.mospi.gov.in)). Fund utilisation = works recommended ÷ allocated limit (MoSPI’s definition); spent = vendor payments ÷ allocated limit; completion = completed ÷ recommended works. The MP score weighs completion, spending efficiency, utilisation, proof of work, spending and vendor diversity. How it’s calculated.