5th of 10 from Rajasthan
Allocated limit
₹14.70 Cr
Median ₹14.70 Cr
Fund utilisation
96%
₹14.05 Cr recommended · 175 works
Above median (70%)
Paid to vendors
₹8.76 Cr
60% of allocation
Above median (25%)
Works completed
26
15% of recommended
Below median (26%)
From recommendation to completion
Every work this MP recommended, by stage
- Recommended by the MP175 works
₹14.05 Cr · 96% of the ₹14.70 Cr allocated
- Sanctioned by the district161 works
92% sanctioned · took 2.6 months on average (due within 45 days)
- Completed26 works
₹4.03 Cr final cost · 11.1 months from recommendation on average
14 works are still awaiting sanction, 14 of them for more than 45 days.
In plain words
What the numbers say
- Recommended 175 works worth ₹14.05 Cr, a fund utilisation of 96%, higher than 83% of Rajya Sabha MPs.
- The district has sanctioned 161 of them, taking 2.6 months on average.
- ₹8.76 Cr has been paid to vendors, 60% of the allocation.
- 26 works are complete, typically 11.1 months after recommendation. 21 works have geo-tagged photos on eSAKSHI.
- The largest share of funds went to Roads & bridges.
- Payments went to 105 vendors. The largest received 8.6%.
- No citizen ratings have been reported for completed works.
How the score is made
MP score 55/100: finishing works counts most
- Works completed 30%15Completed ÷ recommended works.
- Spending efficiency 20%46Value of completed works ÷ money paid out. Money paid without works finished scores low.
- Fund utilisation 15%96Value of works recommended ÷ allocated limit (MoSPI’s measure).
- Proof of work 15%73Share of completed works with photos or documents uploaded on eSAKSHI.
- Funds spent 10%60Paid to vendors ÷ allocated limit.
- Vendor diversity 10%100How spread out payments are: full marks when no vendor gets over 20% of the money, none when one vendor gets everything.
i
Members of Parliament (MPs) do not have direct, operational control over the specific vendors selected for government public works. However, they exert significant indirect influence by shaping procurement frameworks, passing supplier diversity laws, and conducting oversight.
Largest vendor: MEHTA RAMESHKUMAR GOUTAMLAL, 8.6% of payments across 105 vendors.
District sanction speed
90/100 · sanction is the district authority’s job, so this doesn’t change the MP’s rank
- Sanction speed 100%90Average days to sanction (full marks within the 45-day guideline, none at a year), and the share of works not overdue.
Activity over time
Recommendations, payments and completions by month
Sectors
Value of works by category
Who got paid
Top vendors by payments received
Implementing district authorities
The districts that sanction and execute this MP’s works
Works
177 works · the 60 most recent are listed here, all of them in the explorer · tap “Photos” to see geo-tagged photos from eSAKSHI
Handpump installation near Geeta Kaseya house, Tilatphala village, Charpotia
Drinking waterInstalling hand pumps· Pratapgarh· #273332
₹27,000 Sanctioned · 22 Oct 2026Rec. 11 Mar 2026Hand pump installation near Dinesh Nanka house, Chunabhati Ghanera
Drinking waterInstalling hand pumps· Pratapgarh· #273333
₹27,000 Sanctioned · 22 Oct 2026Rec. 11 Mar 2026Ring wall with filling work from Badaliya main road to Badaliya dhuni village Badaliya Gram Panchayat Badaliya Aspur Dungarpur
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Dungarpur· #190991
₹2.9 L Completed 10 Oct 2026Rec. 16 Apr 2025Paid ₹2.9 LGada Sialia main road ring wall work till cremation ground Gada Sialia village Gada Sialia Gram Panchayat Badaliya Aspur Dungarpur
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Dungarpur· #190994
₹4.3 L Completed 10 Oct 2026Rec. 16 Apr 2025Paid ₹4.3 LHead pump installation in Holi Phala Upli Basti in village Khunta
Drinking waterInstalling hand pumps· Pratapgarh· #271557
₹27,000 Sanctioned · 3 Oct 2026Rec. 11 Mar 2026Electric Panghat Work, Kanhaiya/Manji Damor, Village Ubli Ubli, Gadameditiya
Drinking waterInstalling community drinking water plants· Dungarpur· #292898
₹2.6 L Sanctioned · 2 Oct 2026Rec. 8 Jul 2026Electric Panghat Work Jeevaram Garasiya/Savji Garasiya, Village Ubli Gadameditiya
Drinking waterInstalling community drinking water plants· Dungarpur· #292899
₹2.6 L Sanctioned · 2 Oct 2026Rec. 8 Jul 2026Electric Panghat Work, Devilal/Kaluram Garasiya, Village Ubli Ubli, Gadameditiya
Drinking waterInstalling community drinking water plants· Dungarpur· #292901
₹2.6 L Sanctioned · 2 Oct 2026Rec. 8 Jul 2026Electric Panghat Work, Nathulal/Ramchandra Garasiya, Village Ubli Ubli, Gadameditiya
Drinking waterInstalling community drinking water plants· Dungarpur· #292903
₹2.6 L Sanctioned · 2 Oct 2026Rec. 8 Jul 2026Electric Panghat Work, Arvind/Ravji Garasiya, Village Ubli Ubli, Gadameditiya
Drinking waterInstalling community drinking water plants· Dungarpur· #292904
₹2.6 L Sanctioned · 2 Oct 2026Rec. 8 Jul 2026Community building construction work, Sendola near Lalshankar/Gautam Masar's house
Community buildings & public spacesConstruction of community centers and community halls· Dungarpur· #297992
₹15.0 L Sanctioned · 2 Oct 2026Rec. 27 Jul 2026Community building construction work, near Manilal Garasiya/Ramchandra Garasiya's house, boiled
Community buildings & public spacesConstruction of community centers and community halls· Dungarpur· #297990
₹15.0 L Sanctioned · 1 Oct 2026Rec. 27 Jul 2026Construction work of a tin shed for cultural program at Azad Nagar, Nadia
Community buildings & public spacesConstruction of common work sheds / common covered sitting area· Banswara· #308730
₹10.0 L Work partially Completed · 28 Sept 2026Rec. 27 Aug 2026Paid ₹6.0 LConstruction of boundary walls, all around the community building near Bhachdia Math
Community buildings & public spacesConstruction of boundary walls of existing public and community buildings· Dungarpur· #291180
₹25.0 L Work partially Completed · 25 Sept 2026Rec. 4 Jul 2026Baradari construction work, near the house of Raju father Gautam, Bhura Timba Bada
Community buildings & public spacesConstruction of community centers and community halls· Banswara· #212112
₹7.0 L Work partially Completed · 22 Sept 2026Rec. 16 Jul 2025Paid ₹5.6 L
Rajya Sabha MPs from Rajasthan
Ranked by MP score
| # | MP | Utilisation | Spent | Completed | Score |
|---|---|---|---|---|---|
| 1 | Shri Mukul Wasnik | 82% | 63% | 101 | 69 |
| 2 | Shri Pramod Tiwari | 71% | 55% | 69 | 65 |
| 3 | Shri Randeep Singh Surjewala | 69% | 33% | 59 | 61 |
| 4 | Smt. Sonia Gandhi | 88% | 60% | 48 | 58 |
| 5 | Shri Chunnilal Garasiya | 96% | 60% | 26 | 55 |
| 6 | Shri Ghanshyam Tiwari | 53% | 25% | 36 | 54 |
| 7 | Shri Madan Rathore | 74% | 30% | 32 | 51 |
| 8 | Shri Neeraj Dangi | 56% | 10% | 0 | 10 |
| 9 | Dr. Alka Singh | 0% | 0% | 0 | 0 |
| 10 | Dr. Satish Poonia | 0% | 0% | 0 | 0 |
Source: MoSPI eSAKSHI (eSAKSHI API (mplads.mospi.gov.in)). Fund utilisation = works recommended ÷ allocated limit (MoSPI’s definition); spent = vendor payments ÷ allocated limit; completion = completed ÷ recommended works. The MP score weighs completion, spending efficiency, utilisation, proof of work, spending and vendor diversity. How it’s calculated.