Skip to content
MPLADSTracker
This is a record from the 17th Lok Sabha (2019–24). eSAKSHI covers its final year only, from April 2023. Comparisons are with other 17th Lok Sabha MPs.

MPLADS report card · 17th Lok Sabha

Anubhav Mohanty

Lok SabhaKendrapara · Odisha

MP score93/10097th of 539 in the 17th Lok Sabha
1st of 21 from Odisha

Allocated limit

₹9.53 Cr

Median ₹8.60 Cr

Fund utilisation

100%

₹9.53 Cr recommended · 158 works
About the median

Paid to vendors

₹9.42 Cr

99% of allocation
Above median (88%)

Works completed

134

85% of recommended
About the median

From recommendation to completion

Every work this MP recommended, by stage

  1. Recommended by the MP158 works

    ₹9.53 Cr · 100% of the ₹9.53 Cr allocated

  2. Sanctioned by the district158 works

    100% sanctioned · took 2.4 months on average (due within 45 days)

  3. Completed134 works

    ₹8.70 Cr final cost · 8.5 months from recommendation on average

In plain words

What the numbers say

  • Recommended 158 works worth ₹9.53 Cr, a fund utilisation of 100%, higher than 87% of 17th Lok Sabha MPs.
  • The district has sanctioned 158 of them, taking 2.4 months on average.
  • ₹9.42 Cr has been paid to vendors, 99% of the allocation.
  • 134 works are complete, typically 8.5 months after recommendation. 133 works have geo-tagged photos on eSAKSHI.
  • The largest share of funds went to Education & libraries.
  • Payments went to 48 vendors. The largest received 23%.
  • No citizen ratings have been reported for completed works.

How the score is made

MP score 93/100: finishing works counts most

  1. Works completed 30%85Completed ÷ recommended works.
  2. Spending efficiency 20%92Value of completed works ÷ money paid out. Money paid without works finished scores low.
  3. Fund utilisation 15%100Value of works recommended ÷ allocated limit (MoSPI’s measure).
  4. Proof of work 15%99Share of completed works with photos or documents uploaded on eSAKSHI.
  5. Funds spent 10%99Paid to vendors ÷ allocated limit.
  6. Vendor diversity 10%
    i

    Members of Parliament (MPs) do not have direct, operational control over the specific vendors selected for government public works. However, they exert significant indirect influence by shaping procurement frameworks, passing supplier diversity laws, and conducting oversight.

    96
    How spread out payments are: full marks when no vendor gets over 20% of the money, none when one vendor gets everything.

Largest vendor: Rudra Enterprises, 23% of payments across 48 vendors.

District sanction speed

96/100 · sanction is the district authority’s job, so this doesn’t change the MP’s rank

  1. Sanction speed 100%96Average days to sanction (full marks within the 45-day guideline, none at a year), and the share of works not overdue.

Activity over time

Recommendations, payments and completions by month

Value of works MPs recommended each month

Who got paid

Top vendors by payments received

Implementing district authorities

The districts that sanction and execute this MP’s works

Works

158 works · the 60 most recent are listed here, all of them in the explorer · tap “Photos” to see geo-tagged photos from eSAKSHI

Open in explorer
  • Installation of Solar Street Light in Kalabuda bridge, kalabuda G.P, Garadpur Block, Kendrapara District

    Electricity & lightingStreet lights· Kendrapada· #120809

    ₹3.0 L Completed 5 Aug 2026Rec. 7 Mar 2024Paid ₹3.0 L
  • Installation of Solar Street Light in Patkura Bazar, Patkura G.P, Garadpur Block, Kendrapara District

    Electricity & lightingStreet lights· Kendrapada· #120810

    ₹4.0 L Completed 5 Aug 2026Rec. 7 Mar 2024Paid ₹4.0 L
  • Installation of Solar Street Light in Pandia Bridge, Ramachandrapur G.P, Garadpur Block, Kendrapara District

    Electricity & lightingStreet lights· Kendrapada· #120807

    ₹4.0 L Completed 8 May 2026Rec. 7 Mar 2024Paid ₹4.0 L
  • Const. of Boundary Wall and Cycle Stand in Nodal School, Birol, Napanga GP, Tangi Block, Cuttack district

    Community buildings & public spacesConstruction of boundary walls of existing public and community buildings· Kataka· #61668

    ₹2.5 L Completed 16 Dec 2025Rec. 13 Dec 2023Paid ₹2.5 L
  • Installation of Street Light from Daahalpur School Chhaka to Oupada Chhaka, Nadiabarei G.P, Block – Garadpur, Kendrapara District

    Electricity & lightingStreet lights· Kendrapada· #49562

    ₹5.0 L Completed 10 Oct 2025Rec. 15 Nov 2023Paid ₹5.0 L
  • Installation of Street Light from Tentalo UP School to Kali Mandir, Talakusuma G.P, Block – Garadpur, Kendrapara District

    Electricity & lightingStreet lights· Kendrapada· #49563

    ₹4.0 L Completed 10 Oct 2025Rec. 15 Nov 2023Paid ₹4.0 L
  • Installation of Street Light from Talakusuma Kara Chhaka to Sethy Sahi, Talakusuma G.P, Block – Garadpur, Kendrapara District

    Electricity & lightingStreet lights· Kendrapada· #49564

    ₹3.0 L Completed 10 Oct 2025Rec. 15 Nov 2023Paid ₹3.0 L
  • Const. of Compund Wall in Nadiabarae Govt. High School, Nadiabarae GP, Garadpur Block, Kendrapara District

    Community buildings & public spacesConstruction of boundary walls of existing public and community buildings· Kendrapada· #49567

    ₹5.0 L Completed 10 Oct 2025Rec. 15 Nov 2023Paid ₹5.0 L
  • Construction of Boundary Wall in Basantapur Primary School, Basantapur Village, Tyendakura G.P, Garadpur Block, Kendrapara District

    Community buildings & public spacesConstruction of boundary walls of existing public and community buildings· Kendrapada· #120811

    ₹3.0 L Completed 10 Oct 2025Rec. 7 Mar 2024Paid ₹3.0 L
  • 1. Purchase of Air-Conditioned, Diesel BS-VI Light Commercial Funeral Vehicle Hearse Van with 4 Wheel having Stainless Steel Chamber for Kendrapara Municipality, Ward No. 11, Kendrapara District

    Community buildings & public spacesPurchase of hearse van (Four, Three and Two wheelers)· Kendrapada· #127348

    ₹20.0 L Completed 23 Jul 2025Rec. 13 Mar 2024Paid ₹20.0 L
  • Installation of Street Light from Kalabuda Bridge to Bareni Bazar, Kalabuda G.P, Block – Garadpur, Kendrapara District

    Electricity & lightingStreet lights· Kendrapada· #49561

    ₹6.0 L Completed 9 Jul 2025Rec. 15 Nov 2023Paid ₹6.0 L
  • Installation of Street Light from Raahala Hanuman to Budhi Jagulai Temple via Aanganwadi, Tyndakura G.P, Block – Garadpur, Kendrapara District

    Electricity & lightingStreet lights· Kendrapada· #49565

    ₹4.0 L Completed 5 Jun 2025Rec. 15 Nov 2023Paid ₹4.0 L
  • Installation of Street Light from Arabhola Cannel Bandh to Narada Durga Mandap Tyndakura G.P, Block – Garadpur, Kendrapara District

    Electricity & lightingStreet lights· Kendrapada· #49566

    ₹3.0 L Completed 5 Jun 2025Rec. 15 Nov 2023Paid ₹3.0 L
  • Installation of Street Light from Bantala School to Haata Chhaka, Bantala G.P, Block – Garadpur, Kendrapara District

    Electricity & lightingStreet lights· Kendrapada· #49560

    ₹5.0 L Completed 4 Jun 2025Rec. 15 Nov 2023Paid ₹5.0 L
  • Installation of 3 nos of Outdoor LED Display – Pixel Pitch 6-mm, Audio System Smart Power Distribution Unit, LED Control System, Management Software with Cloud Publishing, Live Streaming, Mechanical Structure for Mounting of LED Walls, Desktop PC Interface Device, Network Switch, Auto Brightness Sensor, GSM Router of 12*8 square feet LED wall in Pattamnundai Municipality area

    Education & librariesPurchase of smart boards, visual display units and projectors· Kendrapada· #122907

    ₹40.5 L Completed 25 Apr 2025Rec. 7 Mar 2024Paid ₹40.5 L

17th Lok Sabha MPs from Odisha

Ranked by MP score

#MPUtilisationSpentCompletedScore
1Anubhav Mohanty · Kendrapara100%99%13493
2Nitesh Ganga Deb · Sambalpur100%88%17688
3Smt Manjulata Mandal · Bhadrak98%75%12784
4Shri Jual Oram · Sundargarh100%87%9881
5Saptagiri Sankar Ulaka · Koraput97%78%18481
6Suresh Pujari · Bargarh100%83%18780
7Shri Bhartruhari Mahtab · Cuttack100%63%13979
8Smt Sangeeta Kumari Singh Deo · Bolangir100%73%27775
9Pinaki Misra · Puri100%69%17774
10Basanta Kumar Panda · Kalahandi99%78%23573
11Shri Chandra Sekhar Sahu · Berhampur100%45%9273
12Ms Chandrani Murmu · Keonjhar100%87%15772

Source: MoSPI eSAKSHI (eSAKSHI API (mplads.mospi.gov.in)). Fund utilisation = works recommended ÷ allocated limit (MoSPI’s definition); spent = vendor payments ÷ allocated limit; completion = completed ÷ recommended works. The MP score weighs completion, spending efficiency, utilisation, proof of work, spending and vendor diversity. How it’s calculated.