Skip to content
MPLADSTracker
This is a record from the 17th Lok Sabha (2019–24). eSAKSHI covers its final year only, from April 2023. Comparisons are with other 17th Lok Sabha MPs.

MPLADS report card · 17th Lok Sabha

Shri Abdul Khaleque

Lok SabhaBarpeta · Assam

MP score76/100390th of 539 in the 17th Lok Sabha
4th of 14 from Assam

Allocated limit

₹9.81 Cr

Median ₹8.60 Cr

Fund utilisation

98%

₹9.62 Cr recommended · 218 works
About the median

Paid to vendors

₹8.41 Cr

86% of allocation
About the median

Works completed

112

51% of recommended
Below median (83%)

From recommendation to completion

Every work this MP recommended, by stage

  1. Recommended by the MP218 works

    ₹9.62 Cr · 98% of the ₹9.81 Cr allocated

  2. Sanctioned by the district209 works

    96% sanctioned · took 4.5 months on average (due within 45 days)

  3. Completed112 works

    ₹5.16 Cr final cost · 21.0 months from recommendation on average

9 works are still awaiting sanction, 9 of them for more than 45 days.

In plain words

What the numbers say

  • Recommended 218 works worth ₹9.62 Cr, a fund utilisation of 98%, higher than 51% of 17th Lok Sabha MPs.
  • The district has sanctioned 209 of them, taking 4.5 months on average.
  • ₹8.41 Cr has been paid to vendors, 86% of the allocation.
  • 112 works are complete, typically 21.0 months after recommendation. 112 works have geo-tagged photos on eSAKSHI.
  • The largest share of funds went to Roads & bridges.
  • Payments went to 206 vendors. The largest received 1.4%.
  • No citizen ratings have been reported for completed works.

How the score is made

MP score 76/100: finishing works counts most

  1. Works completed 30%51Completed ÷ recommended works.
  2. Spending efficiency 20%61Value of completed works ÷ money paid out. Money paid without works finished scores low.
  3. Fund utilisation 15%98Value of works recommended ÷ allocated limit (MoSPI’s measure).
  4. Proof of work 15%100Share of completed works with photos or documents uploaded on eSAKSHI.
  5. Funds spent 10%86Paid to vendors ÷ allocated limit.
  6. Vendor diversity 10%
    i

    Members of Parliament (MPs) do not have direct, operational control over the specific vendors selected for government public works. However, they exert significant indirect influence by shaping procurement frameworks, passing supplier diversity laws, and conducting oversight.

    100
    How spread out payments are: full marks when no vendor gets over 20% of the money, none when one vendor gets everything.

Largest vendor: CONST OF ADMINISTRATIVE BUILDING OF RGM COLLEGE LENGTISINGA, 1.4% of payments across 206 vendors.

District sanction speed

83/100 · sanction is the district authority’s job, so this doesn’t change the MP’s rank

  1. Sanction speed 100%83Average days to sanction (full marks within the 45-day guideline, none at a year), and the share of works not overdue.

Activity over time

Recommendations, payments and completions by month

Value of works MPs recommended each month

Who got paid

Top vendors by payments received

Implementing district authorities

The districts that sanction and execute this MP’s works

Works

218 works · the 60 most recent are listed here, all of them in the explorer · tap “Photos” to see geo-tagged photos from eSAKSHI

Open in explorer
  • Construction of Community Hall in the Village of Kukurmari

    Community buildings & public spacesConstruction of community centers and community halls· Chirang· #12286

    ₹5.0 L Vendor Identification · 5 Sept 2026Rec. 22 Aug 2023Paid ₹3.8 L
  • Construction of Embankment in the bank of river Manas near Numberpara Bazar

    Irrigation, flood & environmentConstruction of flood control embankments/protection walls along riverbanks, hilltops, roadsides· Bongaigaon· #99573

    ₹3.0 L Completed 17 Feb 2026Rec. 7 Feb 2024Paid ₹3.0 L
  • Construction of bhojanaloy of Rangapani Satra

    Community buildings & public spacesConstruction of additional rooms and halls in the existing public and community building· Bongaigaon· #22767

    ₹5.0 L Completed 12 Jan 2026Rec. 18 Sep 2023Paid ₹5.0 L
  • Construction of road from No 3 Bashbari community hall to No 4 Bashbari LP School

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Bongaigaon· #4245

    ₹4.0 L Completed 3 Dec 2025Rec. 17 Jul 2023Paid ₹4.0 L
  • Construction of road from Chakla HS School to Haldhia GP boundary

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Bongaigaon· #80606

    ₹4.0 L Completed 3 Dec 2025Rec. 12 Jan 2024Paid ₹4.0 L
  • Construction of toilet with running water at Nagaon Shiksha Mandir High School

    Sanitation & drainageConstruction of toilet blocks· Barpeta· #16341

    ₹2.5 L Completed 28 Nov 2025Rec. 4 Sep 2023Paid ₹2.5 L
  • Construction of Road from Saora Pathar Parghat to Hasen Ali House.

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Barpeta· #21156

    ₹4.0 L Completed 28 Nov 2025Rec. 15 Sep 2023Paid ₹4.0 L
  • Sand Gravelling of Road from Khanin Deka House to Amit Das House in the village of Madulijar

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Barpeta· #28570

    ₹5.0 L Completed 28 Nov 2025Rec. 29 Sep 2023Paid ₹5.0 L
  • Construction of road from EGS Centre to Sawrachar Gaon chariali road

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Barpeta· #81179

    ₹2.5 L Completed 28 Nov 2025Rec. 13 Jan 2024Paid ₹2.5 L
  • Construction of road from BD link road to Daisy Das Kalita House in the village of Bamun Baradi

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Barpeta· #81180

    ₹4.0 L Completed 28 Nov 2025Rec. 13 Jan 2024Paid ₹4.0 L
  • Construction of road from Abdul Bareque Master house to Late Mofidur Rahman House in the village of Phulkipara

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Barpeta· #109113

    ₹3.5 L Completed 28 Nov 2025Rec. 19 Feb 2024Paid ₹3.5 L
  • Construction of boundary wall of Pub Chenga High School Caampus.

    Community buildings & public spacesConstruction of boundary walls of existing public and community buildings· Barpeta· #110308

    ₹3.0 L Completed 28 Nov 2025Rec. 20 Feb 2024Paid ₹3.0 L
  • Construction of road from Mozzamal Hussain house to Akbar Ali house in the village of Bagulamari.

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Barpeta· #116006

    ₹3.0 L Completed 28 Nov 2025Rec. 27 Feb 2024Paid ₹3.0 L
  • Construction of Ranga Mancha at Taj Uddin High school in the village of Saorar Bhitha

    Community buildings & public spacesConstruction of buildings for community cultural activities· Barpeta· #118345

    ₹6.0 L Completed 28 Nov 2025Rec. 1 Mar 2024Paid ₹6.0 L
  • Construction of road from Safuir Rahaman House to late Sabed Ali Master House

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Barpeta· #3118

    ₹3.5 L Completed 26 Nov 2025Rec. 10 Jul 2023Paid ₹3.5 L

17th Lok Sabha MPs from Assam

Ranked by MP score

#MPUtilisationSpentCompletedScore
1Kripanath Mallah · Karimganj100%99%5684
2Maulana Ajmal Badruddin · Dhubri99%90%6283
3Rajdeep Roy · Silchar100%99%10283
4Shri Abdul Khaleque · Barpeta98%86%11276
5Topon Kumar Gogoi · Jorhat99%91%9271
6Dilip Saikia · Darrang-Udalguri94%77%11169
7Horen Sing Bey · Diphu100%93%2065
8Pradan Baruah · Lakhimpur94%85%4263
9Shri Naba (Hira) Kumar Sarania · Kokrajhar99%89%2062
10Pradyut Bordoloi · Nowgong94%81%4362
11Pallab Lochan Das · Sonitpur99%94%5659
12Queen Oja · Guwahati91%86%555

Source: MoSPI eSAKSHI (eSAKSHI API (mplads.mospi.gov.in)). Fund utilisation = works recommended ÷ allocated limit (MoSPI’s definition); spent = vendor payments ÷ allocated limit; completion = completed ÷ recommended works. The MP score weighs completion, spending efficiency, utilisation, proof of work, spending and vendor diversity. How it’s calculated.