Skip to content
MPLADSTracker
This is a record from the 17th Lok Sabha (2019–24). eSAKSHI covers its final year only, from April 2023. Comparisons are with other 17th Lok Sabha MPs.

MPLADS report card · 17th Lok Sabha

Sunil Kumar Singh

Lok SabhaChatra · Jharkhand

MP score52/100516th of 539 in the 17th Lok Sabha
11th of 13 from Jharkhand

Allocated limit

₹7.36 Cr

Median ₹8.60 Cr

Fund utilisation

100%

₹7.35 Cr recommended · 34 works
About the median

Paid to vendors

₹1.05 Cr

14% of allocation
Below median (88%)

Works completed

14

41% of recommended
Below median (83%)

From recommendation to completion

Every work this MP recommended, by stage

  1. Recommended by the MP34 works

    ₹7.35 Cr · 100% of the ₹7.36 Cr allocated

  2. Sanctioned by the district25 works

    74% sanctioned · took 9.8 months on average (due within 45 days)

  3. Completed14 works

    ₹60.3 L final cost · 17.5 months from recommendation on average

9 works are still awaiting sanction, 9 of them for more than 45 days.

In plain words

What the numbers say

  • Recommended 34 works worth ₹7.35 Cr, a fund utilisation of 100%, higher than 79% of 17th Lok Sabha MPs.
  • The district has sanctioned 25 of them, taking 9.8 months on average.
  • ₹1.05 Cr has been paid to vendors, 14% of the allocation.
  • 14 works are complete, typically 17.5 months after recommendation. 4 works have geo-tagged photos on eSAKSHI.
  • The largest share of funds went to Health.
  • Payments went to 7 vendors. The largest received 41%.
  • No citizen ratings have been reported for completed works.

How the score is made

MP score 52/100: finishing works counts most

  1. Works completed 30%41Completed ÷ recommended works.
  2. Spending efficiency 20%58Value of completed works ÷ money paid out. Money paid without works finished scores low.
  3. Fund utilisation 15%100Value of works recommended ÷ allocated limit (MoSPI’s measure).
  4. Proof of work 15%29Share of completed works with photos or documents uploaded on eSAKSHI.
  5. Funds spent 10%14Paid to vendors ÷ allocated limit.
  6. Vendor diversity 10%
    i

    Members of Parliament (MPs) do not have direct, operational control over the specific vendors selected for government public works. However, they exert significant indirect influence by shaping procurement frameworks, passing supplier diversity laws, and conducting oversight.

    74
    How spread out payments are: full marks when no vendor gets over 20% of the money, none when one vendor gets everything.

Largest vendor: District Engineer, 41% of payments across 7 vendors.

District sanction speed

47/100 · sanction is the district authority’s job, so this doesn’t change the MP’s rank

  1. Sanction speed 100%47Average days to sanction (full marks within the 45-day guideline, none at a year), and the share of works not overdue.

Activity over time

Recommendations, payments and completions by month

Value of works MPs recommended each month

Who got paid

Top vendors by payments received

Implementing district authorities

The districts that sanction and execute this MP’s works

Works

34 works · tap “Photos” to see geo-tagged photos from eSAKSHI

Open in explorer
  • Construction of soil moram road from PWD road to Churra Sarna in village Lohargada.

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Latehar· #118633

    ₹3.0 L Completed 18 Feb 2026Rec. 1 Mar 2024Paid ₹3.0 L
  • Construction of mud moram road from Shravan Prasad's house to Deori river in village Lanka of Khura Panchayat.

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Latehar· #118638

    ₹3.0 L Completed 18 Feb 2026Rec. 1 Mar 2024Paid ₹3.0 L
  • Construction of drain from Gram Roll Panchayat Jamira Rohit Shahdev's house to the main road.

    Sanitation & drainageProviding drains and gutters for public drainage· Latehar· #118636

    ₹3.0 L Completed 17 Jan 2026Rec. 1 Mar 2024Paid ₹3.0 L
  • Soil moram path leveling work from Panchayat Sinjo Bari to Kumandih Road via Nayka Dam.

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Latehar· #118629

    ₹3.0 L Completed 4 Dec 2025Rec. 1 Mar 2024Paid ₹3.0 L
  • Repair of soil moram path from Bihari Singh's house to Simar Tad in village Jamuna

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Latehar· #118631

    ₹3.0 L Completed 4 Dec 2025Rec. 1 Mar 2024Paid ₹3.0 L
  • PCC road construction from Gopal Singh's house to Sohar Bhuiya's house in village Kena.

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Latehar· #118632

    ₹3.0 L Sanctioned · 6 Nov 2025Rec. 1 Mar 2024
  • Village Manika Beshana Pond Maintenance Work

    Irrigation, flood & environmentConstruction of public irrigation facilities· Latehar· #118628

    ₹3.0 L Completed 21 Oct 2025Rec. 1 Mar 2024Paid ₹3.0 L
  • Vikas Kumar's dam repair in Chhatvakaram of village Manika

    Irrigation, flood & environmentConstruction of public irrigation facilities· Latehar· #118639

    ₹3.0 L Completed 21 Oct 2025Rec. 1 Mar 2024Paid ₹3.0 L
  • Construction of PCC path from library to Bishanpur school in village Bishanpur of Panchayat- Mongar.

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Latehar· #118442

    ₹3.0 L Completed 9 Oct 2025Rec. 1 Mar 2024Paid ₹3.0 L
  • From Mr. Fhagu Mistry's house to Mr. Binesar Singh's house Soil Moram Road

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Latehar· #118291

    ₹4.0 L Physical Inspection · 29 Aug 2025Rec. 1 Mar 2024Paid ₹4.0 L
  • Moram path repair from Mandev Mistry's house to Tevrahi in Village Revat Kalan

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Latehar· #118443

    ₹3.0 L Physical Inspection · 29 Aug 2025Rec. 1 Mar 2024Paid ₹3.0 L
  • Construction of guard wall in village Dumri Pain of Panchayat Ranki Kala.

    Irrigation, flood & environmentConstruction of public irrigation facilities· Latehar· #118648

    ₹3.0 L Physical Inspection · 29 Aug 2025Rec. 1 Mar 2024Paid ₹3.0 L
  • Construction of passenger shed at Harsain Mode of Lesliganj.

    Community buildings & public spacesConstruction of bus-sheds or bus-stops· Palamu· #112403

    ₹1.4 L Completed 2 Aug 2025Rec. 22 Feb 2024Paid ₹1.4 L
  • Construction of pond near Ajay Chaubey's farm in Village and Panchayat Ketal Kala.

    Irrigation, flood & environmentCreation of new ponds· Palamu· #124050

    ₹5.0 L Completed 2 Aug 2025Rec. 9 Mar 2024Paid ₹5.0 L
  • Construction of PCC path from Rajesh Oraon's house to water tank in Village Ranki Kala

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Latehar· #118445

    ₹3.0 L Physical Inspection · 30 May 2025Rec. 1 Mar 2024Paid ₹3.0 L

17th Lok Sabha MPs from Jharkhand

Ranked by MP score

#MPUtilisationSpentCompletedScore
1Vishnu Dayal Ram · Palamu100%88%17183
2Pashupati Nath Singh · Dhanbad100%98%15976
3Sunil Soren · Dumka100%92%19174
4Sudarshan Bhagat · Lohardaga100%97%3771
5Annpurna Devi · Kodarma96%69%19868
6Shri Arjun Munda · Khunti100%93%8766
7Shri Chandra Prakash Choudhary · Giridih99%91%17365
8Bidyut Baran Mahato · Jamshedpur97%88%7059
9Vijay Kumar Hansdak · Rajmahal100%90%28856
10Shri Jayant Sinha · Hazaribagh100%58%6154
11Sunil Kumar Singh · Chatra100%14%1452
12Sanjay Seth · Ranchi100%94%3351

Source: MoSPI eSAKSHI (eSAKSHI API (mplads.mospi.gov.in)). Fund utilisation = works recommended ÷ allocated limit (MoSPI’s definition); spent = vendor payments ÷ allocated limit; completion = completed ÷ recommended works. The MP score weighs completion, spending efficiency, utilisation, proof of work, spending and vendor diversity. How it’s calculated.