Skip to content
MPLADSTracker
This is a record from the 17th Lok Sabha (2019–24). eSAKSHI covers its final year only, from April 2023. Comparisons are with other 17th Lok Sabha MPs.

MPLADS report card · 17th Lok Sabha

Sumedhanand Saraswati

Lok SabhaSikar · Rajasthan

MP score90/100164th of 539 in the 17th Lok Sabha
4th of 25 from Rajasthan

Allocated limit

₹5.49 Cr

Median ₹8.60 Cr

Fund utilisation

100%

₹5.48 Cr recommended · 75 works
About the median

Paid to vendors

₹5.29 Cr

96% of allocation
Above median (88%)

Works completed

67

89% of recommended
Above median (83%)

From recommendation to completion

Every work this MP recommended, by stage

  1. Recommended by the MP75 works

    ₹5.48 Cr · 100% of the ₹5.49 Cr allocated

  2. Sanctioned by the district75 works

    100% sanctioned · took 6.2 months on average (due within 45 days)

  3. Completed67 works

    ₹4.99 Cr final cost · 17.7 months from recommendation on average

In plain words

What the numbers say

  • Recommended 75 works worth ₹5.48 Cr, a fund utilisation of 100%, higher than 77% of 17th Lok Sabha MPs.
  • The district has sanctioned 75 of them, taking 6.2 months on average.
  • ₹5.29 Cr has been paid to vendors, 96% of the allocation.
  • 67 works are complete, typically 17.7 months after recommendation. 42 works have geo-tagged photos on eSAKSHI.
  • The largest share of funds went to Roads & bridges.
  • Payments went to 79 vendors. The largest received 3.7%.
  • No citizen ratings have been reported for completed works.

How the score is made

MP score 90/100: finishing works counts most

  1. Works completed 30%89Completed ÷ recommended works.
  2. Spending efficiency 20%94Value of completed works ÷ money paid out. Money paid without works finished scores low.
  3. Fund utilisation 15%100Value of works recommended ÷ allocated limit (MoSPI’s measure).
  4. Proof of work 15%63Share of completed works with photos or documents uploaded on eSAKSHI.
  5. Funds spent 10%96Paid to vendors ÷ allocated limit.
  6. Vendor diversity 10%
    i

    Members of Parliament (MPs) do not have direct, operational control over the specific vendors selected for government public works. However, they exert significant indirect influence by shaping procurement frameworks, passing supplier diversity laws, and conducting oversight.

    100
    How spread out payments are: full marks when no vendor gets over 20% of the money, none when one vendor gets everything.

Largest vendor: GRAM PANCHAYAT PALSANA, 3.7% of payments across 79 vendors.

District sanction speed

78/100 · sanction is the district authority’s job, so this doesn’t change the MP’s rank

  1. Sanction speed 100%78Average days to sanction (full marks within the 45-day guideline, none at a year), and the share of works not overdue.

Activity over time

Recommendations, payments and completions by month

Value of works MPs recommended each month

Who got paid

Top vendors by payments received

Implementing district authorities

The districts that sanction and execute this MP’s works

Works

75 works · the 60 most recent are listed here, all of them in the explorer · tap “Photos” to see geo-tagged photos from eSAKSHI

Open in explorer
  • Govt Sr. sec. school Sports material is available in Baori, Gram Panchayat-Baori, P.S.-Khandela, District-Sikar.

    Sports & fitnessPurchase of sports equipment· Sikar· #88009

    ₹3.0 L Completed 20 Aug 2026Rec. 24 Jan 2024Paid ₹3.0 L
  • Shaheed Shri Ram Ji githala Govt Sr. sec. school for providing multi gym equipment. For sports ground, Gram Panchayat-Alakhpura Bogan, Panchayat-Laxmangarh, District-Sikar

    Sports & fitnessInstallation of multi-gym equipment· Sikar· #87886

    ₹5.0 L Completed 7 Aug 2026Rec. 24 Jan 2024Paid ₹5.0 L
  • C.C. Drain construction work with interlock from the main road to the house of Mularam Barwariya, Village Post-Alakhpura Bogan, Post-Laxmangarh, District-Sikar.

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Sikar· #87887

    ₹5.0 L Completed 7 Aug 2026Rec. 24 Jan 2024Paid ₹5.0 L
  • For installation of high mast light in Pipli Chowk, Gram Panchayat-Singodada, P.S.-Laxmangarh, District-Sikar.

    Electricity & lightingLighting of public spaces· Sikar· #116841

    ₹3.2 L Completed 7 Aug 2026Rec. 28 Feb 2024Paid ₹3.2 L
  • Construction work of verandah with 1 class room Shaheed Kuldeep Singh Govt sr. sec. schoool Lamiyan, Gram Panchayat-Lamiyan, PS-Palsana District-Sikar.

    Education & librariesConstruction of rooms and halls in school and colleges· Sikar· #87829

    ₹7.9 L Completed 29 Jul 2026Rec. 24 Jan 2024Paid ₹7.9 L
  • Construction work of electricity connection with single phase tube well, near the house of Kailash son Prahlad Gurjar, Dhani Govind Wala, Gram Panchayat-Raipur Patan, PS-Patan, District-neem ka thana.

    Drinking waterInstalling tube-wells and borewells· Neem Ka Thana· #90566

    ₹4.7 L Completed 28 Jul 2026Rec. 28 Jan 2024Paid ₹4.7 L
  • Hall construction work for gymnasium in sports stadium, Dhani Sagdu, Village-Mawanda Khurd, Gram Panchayat-Mawanda Khurd, PS-Neemkathana, District-neem ka thana

    Sports & fitnessConstruction of buildings for multi-gym· Neem Ka Thana· #90589

    ₹8.0 L Completed 27 Mar 2026Rec. 28 Jan 2024Paid ₹8.0 L
  • Construction work of verandah with 1 class room, Mahatma Gandhi Government School, Sheeshyoo, Gram Panchayat-Sheeshyoo, PS-Palsana, District-Sikar.

    Education & librariesConstruction of rooms and halls in school and colleges· Sikar· #87986

    ₹7.3 L Completed 23 Mar 2026Rec. 24 Jan 2024Paid ₹7.3 L
  • For installation of high mast light near Goga Medi, Balaran, Gram Panchayat-Balara, PS-Laxmangarh, District-Sikar.

    Electricity & lightingLighting of public spaces· Sikar· #84738

    ₹3.7 L Completed 19 Mar 2026Rec. 19 Jan 2024Paid ₹3.7 L
  • Construction work of verandah with 1 class room, Govt upar primary school Bhairuji Stand, Gram Panchayat-Purohit's Bas, PS-Piprali, District-Sikar.

    Education & librariesConstruction of rooms and halls in school and colleges· Sikar· #87807

    ₹8.0 L Completed 18 Mar 2026Rec. 24 Jan 2024Paid ₹8.0 L
  • C.C. Interlock road construction work from Budharam Meghwal's house towards Bhagwanaram Bawri's house, Ganeri, Gram Panchayat-Ganedi, P.S.-Nechhwa, District-Sikar.

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Sikar· #125360

    ₹5.0 L Completed 12 Mar 2026Rec. 11 Mar 2024Paid ₹5.0 L
  • Toilet construction work, Government Higher Secondary School Bau, Gram Panchayat Lalsi, Panchayat Samiti Laxmangarh, District Sikar.

    Sanitation & drainageConstruction of toilet blocks· Sikar· #77742

    ₹2.0 L Completed 9 Mar 2026Rec. 8 Jan 2024Paid ₹2.0 L
  • Construction work of verandah with 1 class room, GSSS Pardoli Badi, Village post Sihot Chhoti, PS-Dhod, District-Sikar.

    Education & librariesConstruction of rooms and halls in school and colleges· Sikar· #84701

    ₹8.0 L Completed 9 Mar 2026Rec. 19 Jan 2024Paid ₹8.0 L
  • Room with veranda construction work Govt Sr. sec. school, Ladpur, Gram Panchayat-Ladpur, PS-Palsana, District-Sikar.

    Education & librariesConstruction of rooms and halls in school and colleges· Sikar· #104738

    ₹8.0 L Completed 9 Mar 2026Rec. 14 Feb 2024Paid ₹8.0 L
  • Construction work of verandah along with 1 class room, Shaheed Rajendra Singh and Dol Singh govt sr. sec School Hamirpura, PS-Laxmangarh, District-Sikar.

    Education & librariesConstruction of rooms and halls in school and colleges· Sikar· #115075

    ₹8.5 L Completed 9 Mar 2026Rec. 26 Feb 2024Paid ₹8.5 L

17th Lok Sabha MPs from Rajasthan

Ranked by MP score

#MPUtilisationSpentCompletedScore
1Shri Hanuman Beniwal · Nagaur100%98%17593
2Mahant Balak Nath Yogi · Alwar78%76%7392
3Dushyant Singh · Jhalawar-Baran88%82%28691
4Sumedhanand Saraswati · Sikar100%96%6790
5Manoj Rajoria · Karauli-Dholpur100%93%37489
6Smt Ranjeeta Koli · Bharatpur98%95%16686
7Om Birla · Kota97%82%23184
8Kailash Choudhary · Barmer88%78%5481
9Chandra Prakash Joshi · Chittorgarh53%50%20081
10Rajyavardhan Singh Rathore · Jaipur Rural80%67%10379
11Devji Mansingram Patel · Jalore76%70%7679
12Kanakmal Katara · Banswara98%92%9379

Source: MoSPI eSAKSHI (eSAKSHI API (mplads.mospi.gov.in)). Fund utilisation = works recommended ÷ allocated limit (MoSPI’s definition); spent = vendor payments ÷ allocated limit; completion = completed ÷ recommended works. The MP score weighs completion, spending efficiency, utilisation, proof of work, spending and vendor diversity. How it’s calculated.