Allocated limit
₹19.61 Cr
Median ₹14.70 Cr
Fund utilisation
99%
₹19.46 Cr recommended · 81 works
Above median (70%)
Paid to vendors
₹7.39 Cr
38% of allocation
Above median (25%)
Works completed
8
9.9% of recommended
Below median (26%)
From recommendation to completion
Every work this MP recommended, by stage
- Recommended by the MP81 works
₹19.46 Cr · 99% of the ₹19.61 Cr allocated
- Sanctioned by the district56 works
69% sanctioned · took 11.9 months on average (due within 45 days)
- Completed8 works
₹1.08 Cr final cost · 10.8 months from recommendation on average
25 works are still awaiting sanction, 25 of them for more than 45 days.
In plain words
What the numbers say
- Recommended 81 works worth ₹19.46 Cr, a fund utilisation of 99%, higher than 91% of Rajya Sabha MPs.
- The district has sanctioned 56 of them, taking 11.9 months on average.
- ₹7.39 Cr has been paid to vendors, 38% of the allocation.
- 8 works are complete, typically 10.8 months after recommendation. 6 works have geo-tagged photos on eSAKSHI.
- The largest share of funds went to Roads & bridges.
- Payments went to 18 vendors. The largest received 26%.
- No citizen ratings have been reported for completed works.
How the score is made
MP score 45/100: finishing works counts most
- Works completed 30%10Completed ÷ recommended works.
- Spending efficiency 20%15Value of completed works ÷ money paid out. Money paid without works finished scores low.
- Fund utilisation 15%99Value of works recommended ÷ allocated limit (MoSPI’s measure).
- Proof of work 15%75Share of completed works with photos or documents uploaded on eSAKSHI.
- Funds spent 10%38Paid to vendors ÷ allocated limit.
- Vendor diversity 10%92How spread out payments are: full marks when no vendor gets over 20% of the money, none when one vendor gets everything.
i
Members of Parliament (MPs) do not have direct, operational control over the specific vendors selected for government public works. However, they exert significant indirect influence by shaping procurement frameworks, passing supplier diversity laws, and conducting oversight.
Largest vendor: Kamal Enterprises, 26% of payments across 18 vendors.
District sanction speed
35/100 · sanction is the district authority’s job, so this doesn’t change the MP’s rank
- Sanction speed 100%35Average days to sanction (full marks within the 45-day guideline, none at a year), and the share of works not overdue.
Activity over time
Recommendations, payments and completions by month
Sectors
Value of works by category
Who got paid
Top vendors by payments received
Implementing district authorities
The districts that sanction and execute this MP’s works
Works
81 works · the 60 most recent are listed here, all of them in the explorer · tap “Photos” to see geo-tagged photos from eSAKSHI
District Sindhudurg Taluka Sawantwadi Mu.Insuli District Parishad Primary School No.1
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Sindhudurg· #163426
₹1.9 L Completed 28 Sept 2026Rec. 3 Jan 2025Paid ₹1.9 LDistrict Sindhudurg Taluka Sawantwadi, At Post Insuli Old National Road No. 17 to Mayekar Home
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Sindhudurg· #160358
₹30.0 L Completed 21 Sept 2026Rec. 20 Dec 2024Paid ₹30.0 LStrengthening and beautification of the Gram Panchayat-owned assembly pavilion at Vetnemala (Nalvadevasti), in the village of Vetne, Taluka Khatav, District Satara.
Community buildings & public spacesConstruction of common work sheds / common covered sitting area· Satara· #312179
₹7.0 L Awaiting sanction · 59 daysRec. 3 Sep 2026Construction of a cultural center at Mauje Raveli (Marathwadi), Post Velvi, Taluka Dapoli, District Ratnagiri.
Community buildings & public spacesConstruction of community centers and community halls· Ratnagiri· #312188
₹10.0 L Awaiting sanction · 59 daysRec. 3 Sep 2026Construction of paving, drains, and footpaths at Chavan Chawl and Shankar Buwa Chawl, Dahisar.
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Mumbai Suburban· #312193
₹25.0 L Awaiting sanction · 59 daysRec. 3 Sep 2026Construction of paving, drains, and footpaths at Pandurang Wadi, Goregaon (East).
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Mumbai Suburban· #312196
₹25.0 L Awaiting sanction · 59 daysRec. 3 Sep 2026Construction of a protective wall along the main road at Tonde (Marathwadi), near the residence of Anant Keshav Chavan.
Community buildings & public spacesConstruction of boundary walls of existing public and community buildings· Ratnagiri· #312200
₹10.0 L Awaiting sanction · 59 daysRec. 3 Sep 2026Construction of paving, drains, and footpaths at Tanaji Nagar, Malad (East).
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Mumbai Suburban· #312216
₹30.0 L Awaiting sanction · 59 daysRec. 3 Sep 2026At Bhoiwada Parel, arranging loading, drains, footpaths and meetings.
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Mumbai· #174241
₹35.0 L Vendor Identification · 18 Aug 2026Rec. 7 Feb 2025Paid ₹34.9 LDistrict Dhule, Taluka Sakri, Village Vitai, Ward Nos. 1 & 2
Roads & bridgesConstruction of footpaths and pedestrian ways· Dhule· #286565
₹15.0 L Sanctioned · 31 Jul 2026Rec. 17 Jun 2026Behind Sigma Hospital, Mahatma Gandhi Marg, Mulund West, Ward No. 107
Roads & bridgesConstruction of footpaths and pedestrian ways· Mumbai Suburban· #287922
₹7.0 L Awaiting sanction · 132 daysRec. 22 Jun 2026Magathane Udyan Darshan Society, near Borivali East.
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Mumbai Suburban· #286464
₹35.0 L Awaiting sanction · 137 daysRec. 17 Jun 2026Malvani Church, Murumkhan Nagar, Bazar Galli, Shankarwadi, Malvani Gaon, Malad West.
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Mumbai Suburban· #286468
₹30.0 L Awaiting sanction · 137 daysRec. 17 Jun 2026Near Marol Pipeline, Andheri East
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Mumbai Suburban· #286492
₹30.0 L Awaiting sanction · 137 daysRec. 17 Jun 2026Teen Dongri, Goregaon West (Ward No. 56)
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Mumbai Suburban· #286504
₹35.0 L Awaiting sanction · 137 daysRec. 17 Jun 2026
Rajya Sabha MPs from Maharashtra
Ranked by MP score
| # | MP | Utilisation | Spent | Completed | Score |
|---|---|---|---|---|---|
| 1 | Dr. Ajeet Madhavrao Gopchade | 75% | 39% | 47 | 73 |
| 2 | Dr. Medha Vishram Kulkarni | 69% | 30% | 31 | 61 |
| 3 | Shri Imran Pratapgarhi | 90% | 54% | 54 | 59 |
| 4 | Shri Chandrakant Damodar Handore | 99% | 63% | 13 | 57 |
| 5 | Shri Dhananjay Bhimrao Mahadik | 54% | 23% | 39 | 57 |
| 6 | Dr. Anil Sukhdeorao Bonde | 99% | 47% | 50 | 54 |
| 7 | Shri Praful Patel | 58% | 20% | 22 | 52 |
| 8 | Shri Sanjay Raut | 99% | 38% | 8 | 45 |
| 9 | Shri Nitin Laxmanrao Jadhav Patil | 60% | 7.3% | 4 | 43 |
| 10 | Shri Ashokrao Shankarrao Chavan | 29% | 8.8% | 2 | 24 |
| 11 | Shri Ramdas Bandu Athawale | 73% | 0% | 0 | 16 |
| 12 | Smt. Maya Chintaman Ivnate | 45% | 19% | 0 | 9 |
Source: MoSPI eSAKSHI (eSAKSHI API (mplads.mospi.gov.in)). Fund utilisation = works recommended ÷ allocated limit (MoSPI’s definition); spent = vendor payments ÷ allocated limit; completion = completed ÷ recommended works. The MP score weighs completion, spending efficiency, utilisation, proof of work, spending and vendor diversity. How it’s calculated.