1st of 5 from Haryana
Works waiting for sanction
107 recommended works are still awaiting sanction more than 45 days later. Sanction is the district authority’s responsibility.
Allocated limit
₹9.80 Cr
Median ₹14.70 Cr
Fund utilisation
96%
₹9.37 Cr recommended · 181 works
Above median (70%)
Paid to vendors
₹1.63 Cr
17% of allocation
Below median (25%)
Works completed
1
0.6% of recommended
Below median (26%)
From recommendation to completion
Every work this MP recommended, by stage
- Recommended by the MP181 works
₹9.37 Cr · 96% of the ₹9.80 Cr allocated
- Sanctioned by the district74 works
41% sanctioned · took 2.3 months on average (due within 45 days)
- Completed1 works
₹4.9 L final cost · 7.7 months from recommendation on average
107 works are still awaiting sanction, 107 of them for more than 45 days.
In plain words
What the numbers say
- Recommended 181 works worth ₹9.37 Cr, a fund utilisation of 96%, higher than 83% of Rajya Sabha MPs.
- The district has sanctioned 74 of them, taking 2.3 months on average.
- ₹1.63 Cr has been paid to vendors, 17% of the allocation.
- 1 works are complete, typically 7.7 months after recommendation. 1 works have geo-tagged photos on eSAKSHI.
- The largest share of funds went to Drinking water.
- Payments went to 56 vendors. The largest received 13%.
- No citizen ratings have been reported for completed works.
How the score is made
MP score 30/100: finishing works counts most
- Works completed 30%1Completed ÷ recommended works.
- Spending efficiency 20%3Value of completed works ÷ money paid out. Money paid without works finished scores low.
- Fund utilisation 15%96Value of works recommended ÷ allocated limit (MoSPI’s measure).
- Proof of work 15%20Share of completed works with photos or documents uploaded on eSAKSHI.
- Funds spent 10%17Paid to vendors ÷ allocated limit.
- Vendor diversity 10%100How spread out payments are: full marks when no vendor gets over 20% of the money, none when one vendor gets everything.
i
Members of Parliament (MPs) do not have direct, operational control over the specific vendors selected for government public works. However, they exert significant indirect influence by shaping procurement frameworks, passing supplier diversity laws, and conducting oversight.
Largest vendor: XEN City DHBVN Bhiwani, 13% of payments across 56 vendors.
District sanction speed
67/100 · sanction is the district authority’s job, so this doesn’t change the MP’s rank
- Sanction speed 100%67Average days to sanction (full marks within the 45-day guideline, none at a year), and the share of works not overdue.
Activity over time
Recommendations, payments and completions by month
Sectors
Value of works by category
Who got paid
Top vendors by payments received
Implementing district authorities
The districts that sanction and execute this MP’s works
Works
181 works · the 60 most recent are listed here, all of them in the explorer · tap “Photos” to see geo-tagged photos from eSAKSHI
installation of one 100 Lt SS304 Water Cooler 50 LPH cooling capacity with protective steel cage, concrete base, BIS,ISI compliance, complete fittings, earthing and 6 month warranty, along with 20 35W Solar LED High Mast Street Light 3000 to 4500 lumens comprising solar panel, LiFePO4 battery, IP66 luminaire and 18to25 ft GI pole, complete with installation and warranty.
Drinking waterInstalling community drinking water plants· Ambala· #313591
₹4.6 L Awaiting sanction · 51 daysRec. 11 Sep 2026installation of one 100 Lt SS304 Water Cooler 50 LPH cooling capacity with protective steel cage, concrete base, BIS,ISI compliance, complete fittings, earthing and 6 month warranty, along with 20 35W Solar LED High Mast Street Light 3000 to 4500 lumens comprising solar panel, LiFePO4 battery, IP66 luminaire and 18to25 ft GI pole, complete with installation and warranty.
Drinking waterInstalling community drinking water plants· Ambala· #313592
₹4.6 L Awaiting sanction · 51 daysRec. 11 Sep 2026installation of one 100 Lt SS304 Water Cooler 50 LPH cooling capacity with protective steel cage, concrete base, BIS,ISI compliance, complete fittings, earthing and 6 month warranty, along with 20 35W Solar LED High Mast Street Light 3000 to 4500 lumens comprising solar panel, LiFePO4 battery, IP66 luminaire and 18to25 ft GI pole, complete with installation and warranty.
Drinking waterInstalling community drinking water plants· Ambala· #313593
₹4.6 L Awaiting sanction · 51 daysRec. 11 Sep 2026installation of one 100 Lt SS304 Water Cooler 50 LPH cooling capacity with protective steel cage, concrete base, BIS,ISI compliance, complete fittings, earthing and 6 month warranty, along with 20 35W Solar LED High Mast Street Light 3000 to 4500 lumens comprising solar panel, LiFePO4 battery, IP66 luminaire and 18to25 ft GI pole, complete with installation and warranty.
Drinking waterInstalling community drinking water plants· Ambala· #313594
₹4.6 L Awaiting sanction · 51 daysRec. 11 Sep 2026installation of one 100 Lt SS304 Water Cooler 50 LPH cooling capacity with protective steel cage, concrete base, BIS,ISI compliance, complete fittings, earthing and 6 month warranty, along with 20 35W Solar LED High Mast Street Light 3000 to 4500 lumens comprising solar panel, LiFePO4 battery, IP66 luminaire and 18to25 ft GI pole, complete with installation and warranty.
Drinking waterInstalling community drinking water plants· Ambala· #313595
₹4.6 L Awaiting sanction · 51 daysRec. 11 Sep 2026installation of one 100 Lt SS304 Water Cooler 50 LPH cooling capacity with protective steel cage, concrete base, BIS,ISI compliance, complete fittings, earthing and 6 month warranty, along with 20 35W Solar LED High Mast Street Light 3000 to 4500 lumens comprising solar panel, LiFePO4 battery, IP66 luminaire and 18to25 ft GI pole, complete with installation and warranty.
Drinking waterInstalling community drinking water plants· Ambala· #313596
₹4.6 L Awaiting sanction · 51 daysRec. 11 Sep 2026installation of one 100 Lt SS304 Water Cooler 50 LPH cooling capacity with protective steel cage, concrete base, BIS,ISI compliance, complete fittings, earthing and 6 month warranty, along with 20 35W Solar LED High Mast Street Light 3000 to 4500 lumens comprising solar panel, LiFePO4 battery, IP66 luminaire and 18to25 ft GI pole, complete with installation and warranty.
Drinking waterInstalling community drinking water plants· Ambala· #313597
₹4.6 L Awaiting sanction · 51 daysRec. 11 Sep 2026installation of one 100 Lt SS304 Water Cooler 50 LPH cooling capacity with protective steel cage, concrete base, BIS,ISI compliance, complete fittings, earthing and 6 month warranty, along with 20 35W Solar LED High Mast Street Light 3000 to 4500 lumens comprising solar panel, LiFePO4 battery, IP66 luminaire and 18to25 ft GI pole, complete with installation and warranty.
Drinking waterInstalling community drinking water plants· Ambala· #313598
₹4.6 L Awaiting sanction · 51 daysRec. 11 Sep 2026installation of one 100 Lt SS304 Water Cooler 50 LPH cooling capacity with protective steel cage, concrete base, BIS,ISI compliance, complete fittings, earthing and 6 month warranty, along with 20 35W Solar LED High Mast Street Light 3000 to 4500 lumens comprising solar panel, LiFePO4 battery, IP66 luminaire and 18to25 ft GI pole, complete with installation and warranty.
Drinking waterInstalling community drinking water plants· Ambala· #313599
₹4.6 L Awaiting sanction · 51 daysRec. 11 Sep 2026installation of one 100 Lt SS304 Water Cooler 50 LPH cooling capacity with protective steel cage, concrete base, BIS,ISI compliance, complete fittings, earthing and 6 month warranty, along with 20 35W Solar LED High Mast Street Light 3000 to 4500 lumens comprising solar panel, LiFePO4 battery, IP66 luminaire and 18to25 ft GI pole, complete with installation and warranty.
Drinking waterInstalling community drinking water plants· Ambala· #313600
₹4.6 L Awaiting sanction · 51 daysRec. 11 Sep 2026installation of one 100 Lt SS304 Water Cooler 50 LPH cooling capacity with protective steel cage, concrete base, BIS,ISI compliance, complete fittings, earthing and 6 month warranty, along with 20 35W Solar LED High Mast Street Light 3000 to 4500 lumens comprising solar panel, LiFePO4 battery, IP66 luminaire and 18to25 ft GI pole, complete with installation and warranty.
Drinking waterInstalling community drinking water plants· Ambala· #313601
₹4.6 L Awaiting sanction · 51 daysRec. 11 Sep 2026installation of one 100 Lt SS304 Water Cooler 50 LPH cooling capacity with protective steel cage, concrete base, BIS,ISI compliance, complete fittings, earthing and 6 month warranty, along with 20 35W Solar LED High Mast Street Light 3000 to 4500 lumens comprising solar panel, LiFePO4 battery, IP66 luminaire and 18to25 ft GI pole, complete with installation and warranty.
Drinking waterInstalling community drinking water plants· Ambala· #313602
₹4.6 L Awaiting sanction · 51 daysRec. 11 Sep 2026installation of one 100 Lt SS304 Water Cooler 50 LPH cooling capacity with protective steel cage, concrete base, BIS,ISI compliance, complete fittings, earthing and 6 month warranty, along with 20 35W Solar LED High Mast Street Light 3000 to 4500 lumens comprising solar panel, LiFePO4 battery, IP66 luminaire and 18to25 ft GI pole, complete with installation and warranty.
Drinking waterInstalling community drinking water plants· Yamunanagar· #313642
₹4.6 L Awaiting sanction · 51 daysRec. 11 Sep 2026installation of one 100 Lt SS304 Water Cooler 50 LPH cooling capacity with protective steel cage, concrete base, BIS,ISI compliance, complete fittings, earthing and 6 month warranty, along with 20 35W Solar LED High Mast Street Light 3000 to 4500 lumens comprising solar panel, LiFePO4 battery, IP66 luminaire and 18to25 ft GI pole, complete with installation and warranty.
Drinking waterInstalling community drinking water plants· Yamunanagar· #313643
₹4.6 L Awaiting sanction · 51 daysRec. 11 Sep 2026installation of one 100 Lt SS304 Water Cooler 50 LPH cooling capacity with protective steel cage, concrete base, BIS,ISI compliance, complete fittings, earthing and 6 month warranty, along with 20 35W Solar LED High Mast Street Light 3000 to 4500 lumens comprising solar panel, LiFePO4 battery, IP66 luminaire and 18to25 ft GI pole, complete with installation and warranty.
Drinking waterInstalling community drinking water plants· Yamunanagar· #313644
₹4.6 L Awaiting sanction · 51 daysRec. 11 Sep 2026
Rajya Sabha MPs from Haryana
Ranked by MP score
| # | MP | Utilisation | Spent | Completed | Score |
|---|---|---|---|---|---|
| 1 | Smt. Rekha Sharma | 96% | 17% | 1 | 30 |
| 2 | Shri Subhash Barala | 64% | 22% | 5 | 30 |
| 3 | Shri Kartikeya Sharma | 32% | 1.2% | 0 | 5 |
| 4 | Shri Karamvir Singh Singh Boudh | 11% | 0% | 0 | 2 |
| 5 | Shri Sanjay Bhatia | 2.2% | 0% | 0 | 1 |
Source: MoSPI eSAKSHI (eSAKSHI API (mplads.mospi.gov.in)). Fund utilisation = works recommended ÷ allocated limit (MoSPI’s definition); spent = vendor payments ÷ allocated limit; completion = completed ÷ recommended works. The MP score weighs completion, spending efficiency, utilisation, proof of work, spending and vendor diversity. How it’s calculated.