Skip to content
MPLADSTracker
This is a record from the 17th Lok Sabha (2019–24). eSAKSHI covers its final year only, from April 2023. Comparisons are with other 17th Lok Sabha MPs.

MPLADS report card · 17th Lok Sabha

Rajiv Ranjan (Lalan) Singh

Lok SabhaMunger · Bihar

MP score90/100167th of 539 in the 17th Lok Sabha
18th of 40 from Bihar
Re-elected to the 18th Lok Sabha Then: 0.7% utilisation, 0 works completed, score 0.

Allocated limit

₹14.30 Cr

Median ₹8.60 Cr

Fund utilisation

91%

₹13.01 Cr recommended · 342 works
Below median (98%)

Paid to vendors

₹10.31 Cr

72% of allocation
Below median (88%)

Works completed

283

83% of recommended
About the median

From recommendation to completion

Every work this MP recommended, by stage

  1. Recommended by the MP342 works

    ₹13.01 Cr · 91% of the ₹14.30 Cr allocated

  2. Sanctioned by the district342 works

    100% sanctioned · took 3.3 months on average (due within 45 days)

  3. Completed283 works

    ₹10.21 Cr final cost · 11.9 months from recommendation on average

In plain words

What the numbers say

  • Recommended 342 works worth ₹13.01 Cr, a fund utilisation of 91%, higher than 18% of 17th Lok Sabha MPs.
  • The district has sanctioned 342 of them, taking 3.3 months on average.
  • ₹10.31 Cr has been paid to vendors, 72% of the allocation.
  • 283 works are complete, typically 11.9 months after recommendation. 266 works have geo-tagged photos on eSAKSHI.
  • The largest share of funds went to Roads & bridges.
  • Payments went to 55 vendors. The largest received 20%.
  • No citizen ratings have been reported for completed works.

How the score is made

MP score 90/100: finishing works counts most

  1. Works completed 30%83Completed ÷ recommended works.
  2. Spending efficiency 20%99Value of completed works ÷ money paid out. Money paid without works finished scores low.
  3. Fund utilisation 15%91Value of works recommended ÷ allocated limit (MoSPI’s measure).
  4. Proof of work 15%94Share of completed works with photos or documents uploaded on eSAKSHI.
  5. Funds spent 10%72Paid to vendors ÷ allocated limit.
  6. Vendor diversity 10%
    i

    Members of Parliament (MPs) do not have direct, operational control over the specific vendors selected for government public works. However, they exert significant indirect influence by shaping procurement frameworks, passing supplier diversity laws, and conducting oversight.

    100
    How spread out payments are: full marks when no vendor gets over 20% of the money, none when one vendor gets everything.

Largest vendor: Assistnat Engineer Mokama, 20% of payments across 55 vendors.

District sanction speed

91/100 · sanction is the district authority’s job, so this doesn’t change the MP’s rank

  1. Sanction speed 100%91Average days to sanction (full marks within the 45-day guideline, none at a year), and the share of works not overdue.

Activity over time

Recommendations, payments and completions by month

Value of works MPs recommended each month

Who got paid

Top vendors by payments received

Implementing district authorities

The districts that sanction and execute this MP’s works

Works

342 works · the 60 most recent are listed here, all of them in the explorer · tap “Photos” to see geo-tagged photos from eSAKSHI

Open in explorer
  • CONSTRUCTION OF NALA AND CHEKAR TILES IN WARD NO. 27 FROM HOUSE OF MAHADEV VERMA TO HOUSE OF LAL MANDAL

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Munger· #98014

    ₹5.0 L Completed 7 Aug 2026Rec. 5 Feb 2024Paid ₹5.0 L
  • CONSTRUCTION OF COMMUNITY HALL IN CHAURHI VILLAGE

    Community buildings & public spacesConstruction of community centers and community halls· Lakhisarai· #1934

    ₹6.9 L Completed 25 Mar 2026Rec. 30 Jun 2023Paid ₹6.9 L
  • CONSTRUCTION OF PCC ROAD FROM PANCHMUKHI BAJRANG BALI MANDIR TO SHOP OF VIJAY MANDAL IN DAS TOLA RATANPUR VILLAGE

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Munger· #98032

    ₹4.9 L Completed 25 Mar 2026Rec. 5 Feb 2024Paid ₹4.9 L
  • RENOVATION OF SIRHI GHAT NEAR NAULAKHA BRIDGE IN MAHGANWAN PANCHAYAT

    Community buildings & public spacesConstruction of buildings for community cultural activities· Munger· #98038

    ₹3.9 L Completed 25 Mar 2026Rec. 5 Feb 2024Paid ₹3.9 L
  • INSTALLATION OF HATHIYA CHAPAKAL FOR SUPPLY OF DRINKING WATER NEAR PIPAL TREE IN FRONT OF HOUSE OF RAM ASHID NISHAD IN VILLAGE SITAPUR KASHA DIYARA

    Drinking waterInstalling hand pumps· Patna· #111607

    ₹78,684 Completed 17 Mar 2026Rec. 22 Feb 2024Paid ₹78,684
  • INSTALLATION OFHATHIYA CHAPAKAL NEAR HOUSE OF YOGESHWAR RAJAK SON OF LATE NATHUNI RAJAK IN WARD NO. 4 MAHENDRAPUR VILLAGE HATHIDAH BUJURG PANCHAYAT FOR SUPPLY OF DRINKING WATER

    Drinking waterInstalling hand pumps· Patna· #117904

    ₹78,684 Completed 17 Mar 2026Rec. 1 Mar 2024Paid ₹78,684
  • CONSTRUTION OF COMMUNITY HALL IN WARD 5 NAURANGA VILLAGE NAURANGA JALALPUR PANCHAYAT

    Community buildings & public spacesConstruction of community centers and community halls· Patna· #93614

    ₹7.9 L Completed 21 Jan 2026Rec. 1 Feb 2024Paid ₹7.9 L
  • CONSTRUCTION OF PCC ROAD FROM GRAMIN ROAD TO ANIL JEE HOUSE

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Lakhisarai· #1932

    ₹4.9 L Completed 16 Jan 2026Rec. 30 Jun 2023Paid ₹4.9 L
  • CONSTRUCTION OF COMMUNITY HALL IN MAHTO TOLA NEAR TRIVENI MAHTO HOUSE

    Community buildings & public spacesConstruction of community centers and community halls· Lakhisarai· #1892

    ₹6.9 L Completed 13 Jan 2026Rec. 30 Jun 2023Paid ₹6.9 L
  • CONSTRUCTION OF SIRHI GHAT IN HASH BIHARI TALAB OF KHUDDIWAN VILLAGE

    Community buildings & public spacesConstruction of buildings for community cultural activities· Lakhisarai· #2378

    ₹5.4 L Completed 13 Jan 2026Rec. 6 Jul 2023Paid ₹5.4 L
  • CONSTRUCTION OF PCC ROAD FROM PRIMARY SCHOOL TO HOUSE OF SATISH MANDAL (PURA POKHAR TOLA) IN WARD 7 DHARMRAJ CHAK

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Lakhisarai· #2683

    ₹8.6 L Completed 13 Jan 2026Rec. 6 Jul 2023Paid ₹8.6 L
  • CONSTRUCTION OF COMMUNITY HALL NEAR SOHGI SHIVALA IN MANIKPUR VILLAGE

    Community buildings & public spacesConstruction of community centers and community halls· Lakhisarai· #4170

    ₹6.9 L Completed 13 Jan 2026Rec. 17 Jul 2023Paid ₹6.9 L
  • CONSTRUCTION OF SIRHI GHAT IN TLALB NEAR HOUSE OF VIJAY BABA IN KUMARPUR VILLAGE AZIMGANJ PANCHAYAT

    Community buildings & public spacesConstruction of buildings for community cultural activities· Munger· #98037

    ₹5.9 L Completed 10 Jan 2026Rec. 5 Feb 2024Paid ₹5.9 L
  • CONSTRUCTION OF PCC ROAD WITH DRAINAGE FROM HOUSE OF ANIL SINGH TO AANGAN BARI KENRA IN GOVINDPUR TOLA RAMPUR VILLAGE RAMPUR PANCHAYAT

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Lakhisarai· #96485

    ₹3.9 L Completed 27 Nov 2025Rec. 4 Feb 2024Paid ₹3.9 L
  • CONSTRUCTION OF CHATH GHAT IN SHOBHNI VILLAGE AMARPUR PANCHAYAT

    Community buildings & public spacesConstruction of buildings for community cultural activities· Lakhisarai· #96480

    ₹6.9 L Completed 22 Oct 2025Rec. 4 Feb 2024Paid ₹6.9 L

17th Lok Sabha MPs from Bihar

Ranked by MP score

#MPUtilisationSpentCompletedScore
1Smt Kavita Singh · Siwan99%99%10998
2Ajay Nishad · Muzaffarpur97%97%7398
3Shri Prince Raj · Samastipur99%99%9097
4Mahabali Singh · Karakat99%99%10697
5Alok Kumar Suman · Gopalganj100%100%10497
6Smt Veena Devi · Vaishali96%96%7697
7Kaushalendra Kumar · Nalanda85%84%28796
8Ravi Shankar Prasad · Patna Sahib88%87%19896
9Giriraj Singh · Begusarai94%93%7194
10Shri Janardan Singh Sigriwal · Maharajganj93%89%9894
11Chhedi Paswan · Sasaram97%97%8594
12Chaudhary Mehboob Ali Kaiser · Khagaria97%96%15993

Source: MoSPI eSAKSHI (eSAKSHI API (mplads.mospi.gov.in)). Fund utilisation = works recommended ÷ allocated limit (MoSPI’s definition); spent = vendor payments ÷ allocated limit; completion = completed ÷ recommended works. The MP score weighs completion, spending efficiency, utilisation, proof of work, spending and vendor diversity. How it’s calculated.