This is a record from the 17th Lok Sabha (2019–24). eSAKSHI covers its final year only, from April 2023. Comparisons are with other 17th Lok Sabha MPs.

MPLADS report card · 17th Lok Sabha

Mohammad Akbar Lone

Lok SabhaBaramullah · Jammu and Kashmir

MP score87/100213th of 539 in the 17th Lok Sabha
2nd of 4 from Jammu and Kashmir

Allocated limit

₹6.58 Cr

Median ₹8.60 Cr

Fund utilisation

97%

₹6.41 Cr recommended · 213 works
About the median

Paid to vendors

₹5.51 Cr

84% of allocation
About the median

Works completed

188

88% of recommended
Above median (83%)

From recommendation to completion

Every work this MP recommended, by stage

  1. Recommended by the MP213 works

    ₹6.41 Cr · 97% of the ₹6.58 Cr allocated

  2. Sanctioned by the district207 works

    97% sanctioned · took 3.9 months on average (due within 45 days)

  3. Completed188 works

    ₹5.25 Cr final cost · 15.9 months from recommendation on average

6 works are still awaiting sanction, 6 of them for more than 45 days.

In plain words

What the numbers say

  • Recommended 213 works worth ₹6.41 Cr, a fund utilisation of 97%, higher than 46% of 17th Lok Sabha MPs.
  • The district has sanctioned 207 of them, taking 3.9 months on average.
  • ₹5.51 Cr has been paid to vendors, 84% of the allocation.
  • 188 works are complete, typically 15.9 months after recommendation. 113 works have geo-tagged photos on eSAKSHI.
  • The largest share of funds went to Roads & bridges.
  • Payments went to 62 vendors. The largest received 12%.
  • No citizen ratings have been reported for completed works.

How the score is made

MP score 87/100: finishing works counts most

  1. Works completed 30%88Completed ÷ recommended works.
  2. Spending efficiency 20%95Value of completed works ÷ money paid out. Money paid without works finished scores low.
  3. Fund utilisation 15%97Value of works recommended ÷ allocated limit (MoSPI’s measure).
  4. Proof of work 15%60Share of completed works with photos or documents uploaded on eSAKSHI.
  5. Funds spent 10%84Paid to vendors ÷ allocated limit.
  6. Vendor diversity 10%
    i

    Members of Parliament (MPs) do not have direct, operational control over the specific vendors selected for government public works. However, they exert significant indirect influence by shaping procurement frameworks, passing supplier diversity laws, and conducting oversight.

    100
    How spread out payments are: full marks when no vendor gets over 20% of the money, none when one vendor gets everything.

Largest vendor: Bdo Hajin, 12% of payments across 62 vendors.

District sanction speed

87/100 · sanction is the district authority’s job, so this doesn’t change the MP’s rank

  1. Sanction speed 100%87Average days to sanction (full marks within the 45-day guideline, none at a year), and the share of works not overdue.

Activity over time

Recommendations, payments and completions by month

Value of works MPs recommended each month

Who got paid

Top vendors by payments received

Implementing district authorities

The districts that sanction and execute this MP’s works

Works

214 works · the 60 most recent are listed here, all of them in the explorer · tap “Photos” to see geo-tagged photos from eSAKSHI

Open in explorer
  • INSTALLATION OF SOLAR STREET LIGHTS FOR VILLAGE CHRINGPORA HAJIN

    Electricity & lightingStreet lights· Bandipora· #126888

    ₹1.0 L Completed 20 Oct 2026Rec. 12 Mar 2024Paid ₹1.0 L
  • INSTALLATION OF SOLAR STREET LIGHTS AT DIFFERENT SPOTS AT VILAGE NAIDKHAI

    Electricity & lightingStreet lights· Bandipora· #119592

    ₹1.0 L Completed 5 Oct 2026Rec. 3 Mar 2024Paid ₹1.0 L
  • INSTALLATION OF SOLAR STREET LIGHTS AT DIFFERENT SPOTS AT VILLAGE GUNDI PRANG AND MADWAN

    Electricity & lightingStreet lights· Bandipora· #119591

    ₹1.0 L Completed 29 Sept 2026Rec. 3 Mar 2024Paid ₹1.0 L
  • CONSTRUCTION OF BORE WELL NEAR THE HOUSE OF AB RASHID BHAT AND OTHERS AT WARD NO 8 CHEWA SONAWARI

    Drinking waterInstalling tube-wells and borewells· Bandipora· #64254

    ₹2.4 L Completed 28 Sept 2026Rec. 17 Dec 2023Paid ₹2.4 L
  • CONSTRUCTION OF DRAIN WITH R/WALL NEAR THE HOUSE OF GH AHMAD MIR AB AHAD MIR AND OTHERS AT NESBAL

    Sanitation & drainageProviding drains and gutters for public drainage· Bandipora· #60392

    ₹1.9 L Completed 27 Sept 2026Rec. 11 Dec 2023Paid ₹1.9 L
  • CONSTRUCTION OF BOREWELL AT SHILVAT NEAR ASRAR MOTORS WORK SHOP

    Drinking waterInstalling tube-wells and borewells· Bandipora· #71578

    ₹2.0 L Completed 27 Sept 2026Rec. 29 Dec 2023Paid ₹2.0 L
  • CONSTRUCTION OF PROTECTION BUND NEAR THE HOUSE OF AB HAMID BHAT S/O GH MOHD BHAT AND OTHERS AT EIDGAH COLONY WANIGAM PAYEEN

    Irrigation, flood & environmentConstruction of flood control embankments/protection walls along riverbanks, hilltops, roadsides· Baramulla· #92600

    ₹1.2 L Completed 8 Aug 2026Rec. 31 Jan 2024Paid ₹1.2 L
  • INSTALLATION OF ELECTRIC POLES WITH WIRE AT DUBDAJI MOHALLA ODINA

    Electricity & lightingImprovement of electricity distribution infrastructure· Bandipora· #130640

    ₹1.3 L Time Estimation · 1 Aug 2026Rec. 16 Mar 2024
  • CONSTRUCTION OF BATHROOM NEAR THE HOUSE OF AB AHAD SHEIKH AT KHUMINA BAHARABAD SONAWARI

    Sanitation & drainageConstruction of public toilets and bathrooms· Bandipora· #64239

    ₹3.0 L Completed 1 May 2026Rec. 16 Dec 2023Paid ₹3.0 L
  • CONSTRUCTION OF DRAIN NEAR THE HOUSE OF ADIL HANAN KHAN AND OTHERS AT HARD SHOORA TANGMARG

    Sanitation & drainageProviding drains and gutters for public drainage· Baramulla· #67121

    ₹2.7 L Completed 21 Apr 2026Rec. 21 Dec 2023Paid ₹2.7 L
  • DEVELOPMENT /FENCING OF GRAVEYARD AT HARDSHOORA TANGMARG

    Community buildings & public spacesCrematoriums / Energy efficient crematoriums or structures on burial / cremation ground· Baramulla· #67127

    ₹2.2 L Completed 21 Apr 2026Rec. 21 Dec 2023Paid ₹2.2 L
  • CONSTRUCTION OF TILE PATH FROM MAIN ROAD UPTO RIVER JEHLUM BUND AT CHRINGPORA GUNDI PRENG

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Bandipora· #130659

    ₹2.0 L Completed 6 Apr 2026Rec. 16 Mar 2024Paid ₹2.0 L
  • FENCING OF PRIMARY /MIDDLE SCHOOL WITH ROAD NEAR THE HOUSE OF ALI MOHD NAJAR AND OTHERS AT NOWGAM PAYEEN

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Bandipora· #73250

    ₹2.9 L Completed 26 Mar 2026Rec. 2 Jan 2024Paid ₹2.9 L
  • CONSTRUCTION OF BATHROOM NEAR THE HOUE OF IMTIYAZ AH RATHER AND OTHERS AT TRIGAM WARD NO 3

    Sanitation & drainageConstruction of public toilets and bathrooms· Bandipora· #58487

    ₹2.4 L Completed 14 Mar 2026Rec. 7 Dec 2023Paid ₹2.4 L
  • CONSTRUCTION OF TILE PATH FROM THE HOUSE OF MUSHTAQ AH KHAN ONWARDS AT CHEWA TENGPORA

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Bandipora· #65808

    ₹10,000 Completed 11 Feb 2026Rec. 19 Dec 2023Paid ₹10,000

17th Lok Sabha MPs from Jammu and Kashmir

Ranked by MP score

#MPUtilisationSpentCompletedScore
1Hasnain Masoodi · Anantnag90%80%33394
2Mohammad Akbar Lone · Baramullah97%84%18887
3Shri Jugal Kishore Sharma · Jammu76%60%9084
4Jitendra Singh · Udhampur79%57%12582

Source: MoSPI eSAKSHI (eSAKSHI API (mplads.mospi.gov.in)). Fund utilisation = works recommended ÷ allocated limit (MoSPI’s definition); spent = vendor payments ÷ allocated limit; completion = completed ÷ recommended works. The MP score weighs completion, spending efficiency, utilisation, proof of work, spending and vendor diversity. How it’s calculated.