Skip to content
MPLADSTracker

MPLADS report card · Rajya Sabha

Shri Jaggesh

Rajya SabhaBJPTerm 2022–2028Karnataka

MP score73/10027th of 235 in the Rajya Sabha
1st of 14 from Karnataka

Allocated limit

₹19.61 Cr

Median ₹14.70 Cr

Fund utilisation

100%

₹19.55 Cr recommended · 208 works
Above median (70%)

Paid to vendors

₹13.10 Cr

67% of allocation
Above median (25%)

Works completed

127

61% of recommended
Above median (26%)

From recommendation to completion

Every work this MP recommended, by stage

  1. Recommended by the MP208 works

    ₹19.55 Cr · 100% of the ₹19.61 Cr allocated

  2. Sanctioned by the district184 works

    88% sanctioned · took 8.4 months on average (due within 45 days)

  3. Completed127 works

    ₹11.72 Cr final cost · 11.0 months from recommendation on average

24 works are still awaiting sanction, 24 of them for more than 45 days.

In plain words

What the numbers say

  • Recommended 208 works worth ₹19.55 Cr, a fund utilisation of 100%, higher than 95% of Rajya Sabha MPs.
  • The district has sanctioned 184 of them, taking 8.4 months on average.
  • ₹13.10 Cr has been paid to vendors, 67% of the allocation.
  • 127 works are complete, typically 11.0 months after recommendation. 46 works have geo-tagged photos on eSAKSHI.
  • The largest share of funds went to Roads & bridges.
  • Payments went to 37 vendors. The largest received 23%.
  • No citizen ratings have been reported for completed works.

How the score is made

MP score 73/100: finishing works counts most

  1. Works completed 30%61Completed ÷ recommended works.
  2. Spending efficiency 20%90Value of completed works ÷ money paid out. Money paid without works finished scores low.
  3. Fund utilisation 15%100Value of works recommended ÷ allocated limit (MoSPI’s measure).
  4. Proof of work 15%36Share of completed works with photos or documents uploaded on eSAKSHI.
  5. Funds spent 10%67Paid to vendors ÷ allocated limit.
  6. Vendor diversity 10%
    i

    Members of Parliament (MPs) do not have direct, operational control over the specific vendors selected for government public works. However, they exert significant indirect influence by shaping procurement frameworks, passing supplier diversity laws, and conducting oversight.

    96
    How spread out payments are: full marks when no vendor gets over 20% of the money, none when one vendor gets everything.

Largest vendor: Rakesh N, 23% of payments across 37 vendors.

District sanction speed

61/100 · sanction is the district authority’s job, so this doesn’t change the MP’s rank

  1. Sanction speed 100%61Average days to sanction (full marks within the 45-day guideline, none at a year), and the share of works not overdue.

Activity over time

Recommendations, payments and completions by month

Value of works MPs recommended each month

Who got paid

Top vendors by payments received

Implementing district authorities

The districts that sanction and execute this MP’s works

Works

208 works · the 60 most recent are listed here, all of them in the explorer · tap “Photos” to see geo-tagged photos from eSAKSHI

Open in explorer
  • Construction of Cement Concrete Road (C C Road) from Nataraju House to Lokesh House, Mayasandra village, Mayasandra Gram Panchayat, Turuvekere Taluk, Tumukuru District, Karnataka

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Tumakuru· #193632

    ₹5.0 L Sanctioned · 29 Sept 2026Rec. 22 Apr 2025
  • Construction of Road from Mulakattamma Temple to Kumbara Gudi, Doddasettikere Village, Mayasandra Gram Panchayat, Turuvekere Taluk, Tumukuru District, Karnataka

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Tumakuru· #193633

    ₹5.0 L Sanctioned · 29 Sept 2026Rec. 22 Apr 2025
  • Construction of Road from Kumbara Gudi to Chowdarikatte, Doddasettikere Village, Mayasandra Gram Panchayat, Turuvekere Taluk, Tumukuru District, Karnataka

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Tumakuru· #193634

    ₹5.0 L Sanctioned · 29 Sept 2026Rec. 22 Apr 2025
  • Construction of Cement Concrete Road (C C Road) from Suryanarayana House to Basavaraju House, Nandikalkere Village, Mayasandra Hobli, Mattagadahalli Gram Panchayat, Turuvekere Taluk, Tumkuru District, Karnataka.

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Tumakuru· #193635

    ₹5.0 L Sanctioned · 29 Sept 2026Rec. 22 Apr 2025
  • Construction of Cement Concrete Road (C C Road) near Byraveshwara Temple Enclosure, Jadiya Village, Soravanahalli Gram Panchayat, Turuvekere Taluk, Tumukuru District, Karnataka.

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Tumakuru· #193638

    ₹5.0 L Sanctioned · 29 Sept 2026Rec. 22 Apr 2025
  • Constructions of a sheet roof for the Government School ( Reconstruction of School) at Kolkunte Village & Post, Davanagere Taluk, Davanagere District, Karnataka State.

    Education & librariesConstruction of rooms and halls in school and colleges· Davanagere· #286601

    ₹5.0 L Work partially Completed · 5 Sept 2026Rec. 17 Jun 2026Paid ₹3.8 L
  • Installation of High Mast Light at Naranahalli Village, Doddabelavangala Hobli, Doddaballapur Taluk, Bengaluru Rural District, Karnataka.

    Electricity & lightingLighting of public spaces· Bengaluru Rural· #282589

    ₹5.0 L Sanctioned · 3 Aug 2026Rec. 20 May 2026
  • Installation of High Mast Light at Chikkabelavangala Village, Doddabelavangala Hobli, Doddaballapur Taluk, Bengaluru Rural District, Karnataka.

    Electricity & lightingLighting of public spaces· Bengaluru Rural· #282590

    ₹5.0 L Sanctioned · 3 Aug 2026Rec. 20 May 2026
  • Installation of High Mast Light at Sasalu Village, Sasalu Hobli, Doddaballapur Taluk, Bengaluru Rural District, Karnataka.

    Electricity & lightingLighting of public spaces· Bengaluru Rural· #282591

    ₹5.0 L Sanctioned · 3 Aug 2026Rec. 20 May 2026
  • Installation of High Mast Light at Aroodi Village, Sasalu Hobli, Doddaballapur Taluk, Bengaluru Rural District, Karnataka.

    Electricity & lightingLighting of public spaces· Bengaluru Rural· #282592

    ₹5.0 L Sanctioned · 3 Aug 2026Rec. 20 May 2026
  • Installation of High Mast Light at Alahalli Village, Kasaba Hobli, Doddaballapur Taluk, Bengaluru Rural District, Karnataka.

    Electricity & lightingLighting of public spaces· Bengaluru Rural· #282593

    ₹5.0 L Sanctioned · 3 Aug 2026Rec. 20 May 2026
  • Installation of High Mast Light at Vaddarahalli Village, Kasaba Hobli, Doddaballapur Taluk, Bengaluru Rural District, Karnataka.

    Electricity & lightingLighting of public spaces· Bengaluru Rural· #282594

    ₹5.0 L Sanctioned · 3 Aug 2026Rec. 20 May 2026
  • Installation of High Mast Light at Konaghatta Village, Kasaba Hobli, Doddaballapur Taluk, Bengaluru Rural District, Karnataka.

    Electricity & lightingLighting of public spaces· Bengaluru Rural· #282595

    ₹5.0 L Sanctioned · 3 Aug 2026Rec. 20 May 2026
  • Installation of High Mast Light at Banavathi Village, Sasalu Hobli, Doddaballapur Taluk, Bengaluru Rural District, Karnataka.

    Electricity & lightingLighting of public spaces· Bengaluru Rural· #282596

    ₹5.0 L Sanctioned · 3 Aug 2026Rec. 20 May 2026
  • Installation of High Mast Light at Kadathippur Village, Sasalu Hobli, Doddaballapur Taluk, Bengaluru Rural District, Karnataka.

    Electricity & lightingLighting of public spaces· Bengaluru Rural· #282597

    ₹5.0 L Sanctioned · 3 Aug 2026Rec. 20 May 2026

Rajya Sabha MPs from Karnataka

Ranked by MP score

Compare

Source: MoSPI eSAKSHI (eSAKSHI API (mplads.mospi.gov.in)). Fund utilisation = works recommended ÷ allocated limit (MoSPI’s definition); spent = vendor payments ÷ allocated limit; completion = completed ÷ recommended works. The MP score weighs completion, spending efficiency, utilisation, proof of work, spending and vendor diversity. How it’s calculated.