Skip to content
MPLADSTracker
SKM

MPLADS report card · 18th Lok Sabha

Indra Hang Subba

Lok SabhaSKMSikkim · Sikkim

MP score59/100220th of 542 in the 18th Lok Sabha
Also an MP in the 17th Lok Sabha Then: 100% utilisation, 50 works completed, score 89.

Allocated limit

₹15.20 Cr

Median ₹14.70 Cr

Fund utilisation

100%

₹15.16 Cr recommended · 131 works
Above median (76%)

Paid to vendors

₹13.14 Cr

86% of allocation
Above median (37%)

Works completed

38

29% of recommended
About the median

From recommendation to completion

Every work this MP recommended, by stage

  1. Recommended by the MP131 works

    ₹15.16 Cr · 100% of the ₹15.20 Cr allocated

  2. Sanctioned by the district90 works

    69% sanctioned · took 2.9 months on average (due within 45 days)

  3. Completed38 works

    ₹7.70 Cr final cost · 5.2 months from recommendation on average

41 works are still awaiting sanction, 39 of them for more than 45 days.

In plain words

What the numbers say

  • Recommended 131 works worth ₹15.16 Cr, a fund utilisation of 100%, higher than 97% of 18th Lok Sabha MPs.
  • The district has sanctioned 90 of them, taking 2.9 months on average.
  • ₹13.14 Cr has been paid to vendors, 86% of the allocation.
  • 38 works are complete, typically 5.2 months after recommendation. 13 works have geo-tagged photos on eSAKSHI.
  • The largest share of funds went to Education & libraries.
  • Payments went to 51 vendors. The largest received 19%.
  • No citizen ratings have been reported for completed works.

How the score is made

MP score 59/100: finishing works counts most

  1. Works completed 30%29Completed ÷ recommended works.
  2. Spending efficiency 20%59Value of completed works ÷ money paid out. Money paid without works finished scores low.
  3. Fund utilisation 15%100Value of works recommended ÷ allocated limit (MoSPI’s measure).
  4. Proof of work 15%34Share of completed works with photos or documents uploaded on eSAKSHI.
  5. Funds spent 10%86Paid to vendors ÷ allocated limit.
  6. Vendor diversity 10%
    i

    Members of Parliament (MPs) do not have direct, operational control over the specific vendors selected for government public works. However, they exert significant indirect influence by shaping procurement frameworks, passing supplier diversity laws, and conducting oversight.

    100
    How spread out payments are: full marks when no vendor gets over 20% of the money, none when one vendor gets everything.

Largest vendor: SHIV SHAKTI FURNITURE, 19% of payments across 51 vendors.

District sanction speed

78/100 · sanction is the district authority’s job, so this doesn’t change the MP’s rank

  1. Sanction speed 100%78Average days to sanction (full marks within the 45-day guideline, none at a year), and the share of works not overdue.

Activity over time

Recommendations, payments and completions by month

Value of works MPs recommended each month

Who got paid

Top vendors by payments received

Implementing district authorities

The districts that sanction and execute this MP’s works

Works

131 works · the 60 most recent are listed here, all of them in the explorer · tap “Photos” to see geo-tagged photos from eSAKSHI

Open in explorer
  • Purchase and installation of electronic devices and furniture at School across Sikkim

    Education & librariesPurchase of IT systems, including hardware and software for educational purposes· Gangtok· #325125

    ₹2.5 L Awaiting sanction · 2 daysRec. 30 Oct 2026
  • Purchase and installation of PC system,electronic devices and furniture at any school in pakyong ditrict

    Education & librariesPurchase of IT systems, including hardware and software for educational purposes· Pakyong· #325126

    ₹2.5 L Awaiting sanction · 2 daysRec. 30 Oct 2026
  • Construction of CC footpath at Ninglam,Nandok

    Roads & bridgesConstruction of footpaths and pedestrian ways· Gangtok· #289358

    ₹6.0 L Vendor Identification · 29 Oct 2026Rec. 26 Jun 2026Paid ₹6.0 L
  • Construction of protective wall at Lower nandok

    Irrigation, flood & environmentConstruction of flood control embankments/protection walls along riverbanks, hilltops, roadsides· Gangtok· #295216

    ₹5.0 L Vendor Identification · 29 Oct 2026Rec. 15 Jul 2026Paid ₹5.0 L
  • Construction of protective wall at Bijanbari,Dorok

    Irrigation, flood & environmentConstruction of flood control embankments/protection walls along riverbanks, hilltops, roadsides· Gyalshing· #289352

    ₹2.5 L Vendor Identification · 16 Oct 2026Rec. 26 Jun 2026Paid ₹2.5 L
  • Construction of protective wall at Bijanbari,Dorok

    Irrigation, flood & environmentConstruction of flood control embankments/protection walls along riverbanks, hilltops, roadsides· Gyalshing· #289354

    ₹2.5 L Vendor Identification · 16 Oct 2026Rec. 26 Jun 2026Paid ₹2.5 L
  • Purchase and installation of PC system, electronic devices, hardware and software and furniture at Govt. departments in Gangtok

    Education & librariesPurchase of IT systems, including hardware and software for educational purposes· Gangtok· #307407

    ₹25.0 L Vendor Identification · 16 Oct 2026Rec. 24 Aug 2026Paid ₹25.0 L
  • Construction of protective wall at Upper Lingchom

    Irrigation, flood & environmentConstruction of flood control embankments/protection walls along riverbanks, hilltops, roadsides· Gyalshing· #289364

    ₹2.5 L Vendor Identification · 14 Oct 2026Rec. 26 Jun 2026Paid ₹2.5 L
  • Construction of protective wall at Tingting village

    Irrigation, flood & environmentConstruction of flood control embankments/protection walls along riverbanks, hilltops, roadsides· Gyalshing· #295214

    ₹5.0 L Vendor Identification · 14 Oct 2026Rec. 15 Jul 2026Paid ₹5.0 L
  • Construction of protective wall at Lower Radhu

    Irrigation, flood & environmentConstruction of flood control embankments/protection walls along riverbanks, hilltops, roadsides· Gyalshing· #295580

    ₹2.5 L Vendor Identification · 14 Oct 2026Rec. 16 Jul 2026Paid ₹2.5 L
  • Construction of protective wall at Lower Khandu

    Irrigation, flood & environmentConstruction of flood control embankments/protection walls along riverbanks, hilltops, roadsides· Gyalshing· #295581

    ₹2.5 L Vendor Identification · 14 Oct 2026Rec. 16 Jul 2026Paid ₹2.5 L
  • Construction of protective wall at Middle Sankhu

    Irrigation, flood & environmentConstruction of flood control embankments/protection walls along riverbanks, hilltops, roadsides· Gyalshing· #295590

    ₹2.5 L Vendor Identification · 14 Oct 2026Rec. 16 Jul 2026Paid ₹2.5 L
  • Construction of protective wall at Uttarey

    Irrigation, flood & environmentConstruction of flood control embankments/protection walls along riverbanks, hilltops, roadsides· Gyalshing· #295593

    ₹2.5 L Vendor Identification · 14 Oct 2026Rec. 16 Jul 2026Paid ₹2.5 L
  • Construction of protective wall at Uttarey

    Irrigation, flood & environmentConstruction of flood control embankments/protection walls along riverbanks, hilltops, roadsides· Gyalshing· #295595

    ₹2.5 L Vendor Identification · 14 Oct 2026Rec. 16 Jul 2026Paid ₹2.5 L
  • Construction of protective wall at Middle Luing

    Irrigation, flood & environmentConstruction of flood control embankments/protection walls along riverbanks, hilltops, roadsides· Gangtok· #307412

    ₹25.0 L Vendor Identification · 14 Oct 2026Rec. 24 Aug 2026Paid ₹25.0 L

18th Lok Sabha MPs from Sikkim

Ranked by MP score

Compare
#MPUtilisationSpentCompletedScore
1Indra Hang Subba · Sikkim100%86%3859

Source: MoSPI eSAKSHI (eSAKSHI API (mplads.mospi.gov.in)). Fund utilisation = works recommended ÷ allocated limit (MoSPI’s definition); spent = vendor payments ÷ allocated limit; completion = completed ÷ recommended works. The MP score weighs completion, spending efficiency, utilisation, proof of work, spending and vendor diversity. How it’s calculated.