Skip to content
MPLADSTracker
This is a record from the 17th Lok Sabha (2019–24). eSAKSHI covers its final year only, from April 2023. Comparisons are with other 17th Lok Sabha MPs.

MPLADS report card · 17th Lok Sabha

Dhairyasheel Sambhajirao Mane

Lok SabhaHatkanangle · Maharashtra

MP score96/10037th of 539 in the 17th Lok Sabha
4th of 48 from Maharashtra
Re-elected to the 18th Lok Sabha Then: 15% utilisation, 4 works completed, score 45.

Allocated limit

₹10.73 Cr

Median ₹8.60 Cr

Fund utilisation

98%

₹10.55 Cr recommended · 160 works
About the median

Paid to vendors

₹9.91 Cr

92% of allocation
About the median

Works completed

151

94% of recommended
Above median (83%)

From recommendation to completion

Every work this MP recommended, by stage

  1. Recommended by the MP160 works

    ₹10.55 Cr · 98% of the ₹10.73 Cr allocated

  2. Sanctioned by the district157 works

    98% sanctioned · took 13.5 months on average (due within 45 days)

  3. Completed151 works

    ₹9.76 Cr final cost · 13.8 months from recommendation on average

3 works are still awaiting sanction, 3 of them for more than 45 days.

In plain words

What the numbers say

  • Recommended 160 works worth ₹10.55 Cr, a fund utilisation of 98%, higher than 52% of 17th Lok Sabha MPs.
  • The district has sanctioned 157 of them, taking 13.5 months on average.
  • ₹9.91 Cr has been paid to vendors, 92% of the allocation.
  • 151 works are complete, typically 13.8 months after recommendation. 142 works have geo-tagged photos on eSAKSHI.
  • The largest share of funds went to Roads & bridges.
  • Payments went to 79 vendors. The largest received 6.0%.
  • No citizen ratings have been reported for completed works.

How the score is made

MP score 96/100: finishing works counts most

  1. Works completed 30%94Completed ÷ recommended works.
  2. Spending efficiency 20%98Value of completed works ÷ money paid out. Money paid without works finished scores low.
  3. Fund utilisation 15%98Value of works recommended ÷ allocated limit (MoSPI’s measure).
  4. Proof of work 15%94Share of completed works with photos or documents uploaded on eSAKSHI.
  5. Funds spent 10%92Paid to vendors ÷ allocated limit.
  6. Vendor diversity 10%
    i

    Members of Parliament (MPs) do not have direct, operational control over the specific vendors selected for government public works. However, they exert significant indirect influence by shaping procurement frameworks, passing supplier diversity laws, and conducting oversight.

    100
    How spread out payments are: full marks when no vendor gets over 20% of the money, none when one vendor gets everything.

Largest vendor: Sagar Chandrakant Patil, 6.0% of payments across 79 vendors.

District sanction speed

49/100 · sanction is the district authority’s job, so this doesn’t change the MP’s rank

  1. Sanction speed 100%49Average days to sanction (full marks within the 45-day guideline, none at a year), and the share of works not overdue.

Activity over time

Recommendations, payments and completions by month

Value of works MPs recommended each month

Who got paid

Top vendors by payments received

Implementing district authorities

The districts that sanction and execute this MP’s works

Works

160 works · the 60 most recent are listed here, all of them in the explorer · tap “Photos” to see geo-tagged photos from eSAKSHI

Open in explorer
  • bhagatsing galli no 2 Installing tube-wells and borewells

    Drinking waterInstalling tube-wells and borewells· Kolhapur· #257097

    ₹1.2 L Completed 22 Sept 2026Rec. 22 Aug 2023Paid ₹1.2 L
  • santh sena bhavan Installing tube-wells and borewells

    Drinking waterInstalling tube-wells and borewells· Kolhapur· #257098

    ₹1.2 L Completed 22 Sept 2026Rec. 22 Aug 2023Paid ₹1.2 L
  • krushna nagar galli Installing tube-wells and borewells

    Drinking waterInstalling tube-wells and borewells· Kolhapur· #257099

    ₹1.2 L Completed 22 Sept 2026Rec. 22 Aug 2023Paid ₹1.2 L
  • dattanagar galli no 7

    Drinking waterInstalling tube-wells and borewells· Kolhapur· #257100

    ₹1.2 L Completed 22 Sept 2026Rec. 22 Aug 2023Paid ₹1.2 L
  • margubai mandir devalaya korvi galli Installing tube-wells and borewells

    Drinking waterInstalling tube-wells and borewells· Kolhapur· #257101

    ₹1.2 L Completed 22 Sept 2026Rec. 22 Aug 2023Paid ₹1.2 L
  • aasra nagar galii no 8

    Drinking waterInstalling tube-wells and borewells· Kolhapur· #257102

    ₹1.2 L Completed 22 Sept 2026Rec. 22 Aug 2023Paid ₹1.2 L
  • pra k 17 site no 102 Installing tube-wells and borewells

    Drinking waterInstalling tube-wells and borewells· Kolhapur· #257103

    ₹1.2 L Completed 22 Sept 2026Rec. 22 Aug 2023Paid ₹1.2 L
  • jaybhim zopadpatti Installing tube-wells and borewells

    Drinking waterInstalling tube-wells and borewells· Kolhapur· #257104

    ₹1.2 L Completed 22 Sept 2026Rec. 22 Aug 2023Paid ₹1.2 L
  • pra k 20 lalnagar talim madan shinde house Installing tube-wells and borewells

    Drinking waterInstalling tube-wells and borewells· Kolhapur· #257105

    ₹1.2 L Completed 22 Sept 2026Rec. 22 Aug 2023Paid ₹1.2 L
  • ODR no 179 to kolgaon powarwadi katkarwadi road grama no 119 length 507.00m breadth 3.00 latitude 16.898547 longitude 73.933986

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Kolhapur· #131671

    ₹10.0 L Completed 17 Sept 2026Rec. 16 Mar 2024Paid ₹10.0 L
  • Construction of Samaj Mandir in Backward Class Settlement Village Panchayat of Mauje Ozarde Ta Walwa Revenue No. 234

    Community buildings & public spacesConstruction of buildings for community cultural activities· Sangli· #216425

    ₹5.0 L Work partially Completed · 18 May 2026Rec. 22 Oct 2023Paid ₹4.9 L
  • shene malibhau to nangare galli and chavan galli road cement concreat

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Sangli· #257107

    ₹10.0 L Work partially Completed · 18 May 2026Rec. 22 Aug 2023Paid ₹30,000
  • jambhali malbhag oxgen park Installing tube-wells and borewells

    Drinking waterInstalling tube-wells and borewells· Kolhapur· #132200

    ₹6.1 L Completed 8 May 2026Rec. 16 Mar 2024Paid ₹6.1 L
  • terrification of road at rethare siddharth nagar tal .shahuwadi dalit vasti length 120.00m breadth 3m guters length 132 m latitude 17.012847 N longitude 73.966729 E

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Kolhapur· #129378

    ₹5.0 L Completed 25 Mar 2026Rec. 15 Mar 2024Paid ₹5.0 L
  • Construction of borewell and installation of submersible pump near the house of Sachin Buchde.

    Drinking waterInstalling tube-wells and borewells· Kolhapur· #216408

    ₹1.2 L Completed 24 Feb 2026Rec. 22 Oct 2023Paid ₹1.2 L

17th Lok Sabha MPs from Maharashtra

Ranked by MP score

#MPUtilisationSpentCompletedScore
1Unmesh Bhaiyyasaheb Patil · Jalgaon99%98%17999
2Sudhakar Tukaram Shrangre · Latur96%96%10699
3Bharti Pravin Pawar · Dindori96%94%16097
4Dhairyasheel Sambhajirao Mane · Hatkanangle98%92%15196
5Sanjay(Kaka) Ramchandra Patil · Sangli94%88%14894
6Sanjay Sadashivrao Mandlik · Kolhapur99%88%9394
7Ramdas Chandrabhanji Tadas · Wardha99%96%19594
8Ashok Mahadeorao Nete · Gadchiroli-Chimur99%88%8392
9Hemant Shriram Patil · Hingoli98%83%9392
10Nitin Jairam Gadkari · Nagpur100%67%3691
11Prataprao Govindrao Patil Chikhalikar · Nanded99%84%11991
12Sanjay Haribhau Jadhav · Parbhani98%96%11291

Source: MoSPI eSAKSHI (eSAKSHI API (mplads.mospi.gov.in)). Fund utilisation = works recommended ÷ allocated limit (MoSPI’s definition); spent = vendor payments ÷ allocated limit; completion = completed ÷ recommended works. The MP score weighs completion, spending efficiency, utilisation, proof of work, spending and vendor diversity. How it’s calculated.