Skip to content
MPLADSTracker

MPLADS report card · 18th Lok Sabha

Bishnu Pada Ray

Lok SabhaBJPAndaman And Nicobar Islands · Andaman and Nicobar Islands

MP score18/100519th of 542 in the 18th Lok Sabha
  • Works waiting for sanction

    14 recommended works are still awaiting sanction more than 45 days later. Sanction is the district authority’s responsibility.

  • No completed works reported

    28 works recommended, none reported complete yet.

Allocated limit

₹14.70 Cr

Median ₹14.70 Cr

Fund utilisation

52%

₹7.67 Cr recommended · 28 works
Below median (76%)

Paid to vendors

₹1.55 Cr

11% of allocation
Below median (37%)

Works completed

0

0% of recommended
Below median (28%)

From recommendation to completion

Every work this MP recommended, by stage

  1. Recommended by the MP28 works

    ₹7.67 Cr · 52% of the ₹14.70 Cr allocated

  2. Sanctioned by the district14 works

    50% sanctioned · took 4.0 months on average (due within 45 days)

  3. Completed0 works

    ₹0 final cost

14 works are still awaiting sanction, 14 of them for more than 45 days.

In plain words

What the numbers say

  • Recommended 28 works worth ₹7.67 Cr, a fund utilisation of 52%, higher than 15% of 18th Lok Sabha MPs.
  • The district has sanctioned 14 of them, taking 4.0 months on average.
  • ₹1.55 Cr has been paid to vendors, 11% of the allocation.
  • 0 works are complete.
  • The largest share of funds went to Community buildings & public spaces.
  • Payments went to 9 vendors. The largest received 24%.
  • No citizen ratings have been reported for completed works.

How the score is made

MP score 18/100: finishing works counts most

  1. Works completed 30%0Completed ÷ recommended works.
  2. Spending efficiency 20%0Value of completed works ÷ money paid out. Money paid without works finished scores low.
  3. Fund utilisation 15%52Value of works recommended ÷ allocated limit (MoSPI’s measure).
  4. Proof of work 15%0Share of completed works with photos or documents uploaded on eSAKSHI.
  5. Funds spent 10%11Paid to vendors ÷ allocated limit.
  6. Vendor diversity 10%
    i

    Members of Parliament (MPs) do not have direct, operational control over the specific vendors selected for government public works. However, they exert significant indirect influence by shaping procurement frameworks, passing supplier diversity laws, and conducting oversight.

    96
    How spread out payments are: full marks when no vendor gets over 20% of the money, none when one vendor gets everything.

Largest vendor: CSE Construction Pvt Ltd, 24% of payments across 9 vendors.

District sanction speed

63/100 · sanction is the district authority’s job, so this doesn’t change the MP’s rank

  1. Sanction speed 100%63Average days to sanction (full marks within the 45-day guideline, none at a year), and the share of works not overdue.

Activity over time

Recommendations, payments and completions by month

Value of works MPs recommended each month

Who got paid

Top vendors by payments received

Implementing district authorities

The districts that sanction and execute this MP’s works

Works

28 works · tap “Photos” to see geo-tagged photos from eSAKSHI

Open in explorer
  • Construction of RCC culvert over the nallah at Pudumadhurai Ward No 2 Chainpur GP

    Roads & bridgesConstruction of culverts and bridges· North And Middle Andaman· #309240

    ₹30.9 L Sanctioned · 22 Oct 2026Rec. 28 Aug 2026
  • Construction of Pre-fabricated waiting shed with seating facilities for the use of Auto and Jeep Drivers at Mayabunder Bazar

    Community buildings & public spacesConstruction of common work sheds / common covered sitting area· North And Middle Andaman· #309241

    ₹10.0 L Awaiting sanction · 65 daysRec. 28 Aug 2026
  • Con.of Kitchen shed and store room in premises of community hall at Mathura, Brindabhan

    Community buildings & public spacesConstruction of additional rooms and halls in the existing public and community building· South Andamans· #304502

    ₹14.8 L Awaiting sanction · 76 daysRec. 17 Aug 2026
  • Development of Playground with side drain and CC motorable road at Brichgunj

    Sports & fitnessDevelopment of playfields and sports grounds· South Andamans· #298461

    ₹27.9 L Awaiting sanction · 100 daysRec. 24 Jul 2026
  • Extension of retaining wall and CC approach hand railling at Seashore road near Ayyappa temple South Point Sri Vijayapuram

    Irrigation, flood & environmentConstruction of flood control embankments/protection walls along riverbanks, hilltops, roadsides· South Andamans· #298462

    ₹53.6 L Awaiting sanction · 100 daysRec. 24 Jul 2026
  • Installation of Open Air gym equipment at Chidambaram Park Hut Bay

    Sports & fitnessInstallation of multi-gym equipment· South Andamans· #260542

    ₹10.0 L Sanctioned · 2 Jul 2026Rec. 20 Jan 2026
  • Construction of open Bailey bridge at Mohanpur Ward No.2 Kishorinagar Diglipur Tehsil

    Safety & securitySecurity gates in streets/public place for safety purpose· North And Middle Andaman· #274686

    ₹70.4 L Vendor Identification · 18 Mar 2026Rec. 17 Mar 2026Paid ₹24.8 L
  • Construction of Culvert near Bejoli Maiti house at Ward No.1, Madhupur Gram Panchayat, Diglipur

    Safety & securitySecurity gates in streets/public place for safety purpose· North And Middle Andaman· #188526

    ₹21.0 L Sanctioned · 17 Mar 2026Rec. 1 Apr 2025
  • Construction of 04 class rooms and 02 toilet blocks (pre fabricated TATA steel model) for VKV ZP School at South Creek Sunderghar GP Rangat

    Education & librariesConstruction of rooms and halls in school and colleges· North And Middle Andaman· #264905

    ₹48.6 L Awaiting sanction · 272 daysRec. 2 Feb 2026
  • Construction of 04 class rooms and 02 toilet blocks (Pre fabricated model - Tata steel model) for VKV ZP at Kishorinagar Diglipur Tehsil

    Education & librariesConstruction of rooms and halls in school and colleges· North And Middle Andaman· #264906

    ₹52.0 L Awaiting sanction · 272 daysRec. 2 Feb 2026
  • Purchase of Mahindra 575 DI XP Plus Tractor with cultivator allied attachments to Laxminagar GP Campbell Bay.

    Community buildings & public spacesPurchase of stubble clearing and super seeder machines for community use· Nicobars· #260449

    ₹15.0 L Awaiting sanction · 285 daysRec. 20 Jan 2026
  • Development of Playground with chain link fencing and small stage with pre-fabricated steel roofing at Sunder Colony, Ward No.2, SVP

    Sports & fitnessDevelopment of playfields and sports grounds· South Andamans· #260509

    ₹20.0 L Awaiting sanction · 285 daysRec. 20 Jan 2026
  • RCC retaining wall and motorable road from existing black road to Shri Yadav Rao house at Garacharma, Ward No.24

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· South Andamans· #260510

    ₹30.0 L Awaiting sanction · 285 daysRec. 20 Jan 2026
  • Concrete drain with covering slab connecting from existing municipal drain with boundary wall for 20 mtrs length at Junglighat back side Anand Marg School

    Sanitation & drainageProviding drains and gutters for public drainage· South Andamans· #260511

    ₹8.0 L Awaiting sanction · 285 daysRec. 20 Jan 2026
  • Raising of wall over existing wall 35 meters length with 80 cms height and extension of shed for 06 mtrs at Dhobhighat for community purpose.

    Community buildings & public spacesConstruction of community centers and community halls· South Andamans· #260512

    ₹40.0 L Awaiting sanction · 285 daysRec. 20 Jan 2026

18th Lok Sabha MPs from Andaman and Nicobar Islands

Ranked by MP score

Compare
#MPUtilisationSpentCompletedScore
1Bishnu Pada Ray · Andaman And Nicobar Islands52%11%018

Source: MoSPI eSAKSHI (eSAKSHI API (mplads.mospi.gov.in)). Fund utilisation = works recommended ÷ allocated limit (MoSPI’s definition); spent = vendor payments ÷ allocated limit; completion = completed ÷ recommended works. The MP score weighs completion, spending efficiency, utilisation, proof of work, spending and vendor diversity. How it’s calculated.