3rd of 14 from Assam
Allocated limit
₹14.70 Cr
Median ₹14.70 Cr
Fund utilisation
66%
₹9.75 Cr recommended · 94 works
Below median (76%)
Paid to vendors
₹7.18 Cr
49% of allocation
Above median (37%)
Works completed
41
44% of recommended
Above median (28%)
From recommendation to completion
Every work this MP recommended, by stage
- Recommended by the MP94 works
₹9.75 Cr · 66% of the ₹14.70 Cr allocated
- Sanctioned by the district86 works
91% sanctioned · took 4.4 months on average (due within 45 days)
- Completed41 works
₹3.82 Cr final cost · 9.9 months from recommendation on average
8 works are still awaiting sanction, 8 of them for more than 45 days.
In plain words
What the numbers say
- Recommended 94 works worth ₹9.75 Cr, a fund utilisation of 66%, higher than 34% of 18th Lok Sabha MPs.
- The district has sanctioned 86 of them, taking 4.4 months on average.
- ₹7.18 Cr has been paid to vendors, 49% of the allocation.
- 41 works are complete, typically 9.9 months after recommendation. 4 works have geo-tagged photos on eSAKSHI.
- The largest share of funds went to Community buildings & public spaces.
- Payments went to 52 vendors. The largest received 24%.
- No citizen ratings have been reported for completed works.
How the score is made
MP score 49/100: finishing works counts most
- Works completed 30%44Completed ÷ recommended works.
- Spending efficiency 20%53Value of completed works ÷ money paid out. Money paid without works finished scores low.
- Fund utilisation 15%66Value of works recommended ÷ allocated limit (MoSPI’s measure).
- Proof of work 15%10Share of completed works with photos or documents uploaded on eSAKSHI.
- Funds spent 10%49Paid to vendors ÷ allocated limit.
- Vendor diversity 10%95How spread out payments are: full marks when no vendor gets over 20% of the money, none when one vendor gets everything.
i
Members of Parliament (MPs) do not have direct, operational control over the specific vendors selected for government public works. However, they exert significant indirect influence by shaping procurement frameworks, passing supplier diversity laws, and conducting oversight.
Largest vendor: James Phangcho, 24% of payments across 52 vendors.
District sanction speed
82/100 · sanction is the district authority’s job, so this doesn’t change the MP’s rank
- Sanction speed 100%82Average days to sanction (full marks within the 45-day guideline, none at a year), and the share of works not overdue.
Activity over time
Recommendations, payments and completions by month
Sectors
Value of works by category
Who got paid
Top vendors by payments received
Implementing district authorities
The districts that sanction and execute this MP’s works
Works
94 works · the 60 most recent are listed here, all of them in the explorer · tap “Photos” to see geo-tagged photos from eSAKSHI
Construction of RCC Ringwell at Monsing Bey village, Tarlong
Drinking waterInstalling tube-wells and borewells· Karbi Anglong· #260732
₹3.0 L Work partially Completed · 12 Aug 2026Rec. 21 Jan 2026Paid ₹1.8 LConstruction of RCC Ringwell at Longki Rongpi village, Tarlong
Drinking waterInstalling tube-wells and borewells· Karbi Anglong· #260735
₹3.0 L Work partially Completed · 12 Aug 2026Rec. 21 Jan 2026Paid ₹1.8 LConstruction of RCC Ringwell near Rihajan Baptist Church, Chowkihola
Drinking waterInstalling tube-wells and borewells· Karbi Anglong· #243384
₹3.0 L Vendor Identification · 11 Aug 2026Rec. 29 Oct 2025Paid ₹2.0 LConstruction of Community Building with Library, Guest Room, Conference Room at Haflong, Dima Hasao District (Total Estd. Cost:- Rs. 1.00 Cr.) 1st Installment Rs. 50.00 Lakhs
Community buildings & public spacesConstruction of community centers and community halls· Dima Hasao· #139500
₹50.0 L Physical Inspection · 31 Jul 2026Rec. 6 Sep 2024Paid ₹50.0 LConstruction of RCC Ringwell at Rongmonjir, Chandrasing Terang village near the house of Sonasing Tisso
Drinking waterInstalling tube-wells and borewells· Karbi Anglong· #260740
₹4.0 L Work partially Completed · 7 Jul 2026Rec. 21 Jan 2026Paid ₹3.0 LConstruction of community Fishery near the house of Brijeta Beypi at Longre, Baithalangso
Irrigation, flood & environmentCreation of new ponds· West Karbi Anglong· #284379
₹2.0 L Vendor Identification · 17 Jun 2026Rec. 29 May 2026Paid ₹99,715Construction of Boundary Fencing with concrete works at Mohongdijua Mini Public Health Centre, Mohendijua, Karbi Anglong
Community buildings & public spacesConstruction of boundary walls of existing public and community buildings· Karbi Anglong· #216376
₹25.0 L Vendor Identification · 12 Jun 2026Rec. 9 Jul 2025Paid ₹14.5 LInstallation of Solar Light at No. 01 Platoon Camp, Manglamukh BOP, Dhansiri
Electricity & lightingStreet lights· Karbi Anglong· #243398
₹5.0 L Vendor Identification · 30 May 2026Rec. 29 Oct 2025Paid ₹3.0 LConstruction of Community Fishery near the house of Smt. Kakrung Teronpi at Hamren
Irrigation, flood & environmentCreation of new ponds· West Karbi Anglong· #216143
₹2.0 L Vendor Identification · 22 May 2026Rec. 9 Jul 2025Paid ₹99,715Field Development at Langkircha Playground
Sports & fitnessDevelopment of playfields and sports grounds· West Karbi Anglong· #216135
₹7.0 L Vendor Identification · 21 May 2026Rec. 9 Jul 2025Paid ₹3.5 LConstruction of Market Shed at Rongchek Weekly Market
Community buildings & public spacesConstruction of common work sheds / common covered sitting area· West Karbi Anglong· #216138
₹8.0 L Vendor Identification · 21 May 2026Rec. 9 Jul 2025Paid ₹4.0 LConstruction of Boundary Fencing at Sakachep Community Hall, Langkircha, Khanduli
Community buildings & public spacesConstruction of boundary walls of existing public and community buildings· West Karbi Anglong· #216140
₹12.0 L Vendor Identification · 21 May 2026Rec. 9 Jul 2025Paid ₹7.8 LRenovation of Sar-Ik Pator English M.E. School (including Roofing, Floor, Door and Windows)
Education & librariesConstruction of rooms and halls in school and colleges· West Karbi Anglong· #216141
₹20.0 L Vendor Identification · 21 May 2026Rec. 9 Jul 2025Paid ₹10.0 LConstruction of Community Fishery near the house of Shri Janta Sing Kro, Longpai
Irrigation, flood & environmentCreation of new ponds· West Karbi Anglong· #216144
₹2.0 L Vendor Identification · 21 May 2026Rec. 9 Jul 2025Paid ₹99,715Construction of Community Fishery near the house of Shri Harposing Engti at Umrinti, Hamren
Irrigation, flood & environmentCreation of new ponds· West Karbi Anglong· #216145
₹2.0 L Vendor Identification · 21 May 2026Rec. 9 Jul 2025Paid ₹99,715
18th Lok Sabha MPs from Assam
Ranked by MP score
| # | MP | Utilisation | Spent | Completed | Score |
|---|---|---|---|---|---|
| 1 | Kripanath Mallah · Karimganj | 94% | 60% | 33 | 69 |
| 2 | Joyanta Basumatary · Kokrajhar | 98% | 49% | 20 | 55 |
| 3 | Amarsing Tisso · Diphu | 66% | 49% | 41 | 49 |
| 4 | Rakibul Hussain · Dhubri | 70% | 34% | 25 | 48 |
| 5 | Pradan Baruah · Lakhimpur | 60% | 42% | 33 | 47 |
| 6 | Ranjit Dutta · Sonitpur | 87% | 56% | 24 | 46 |
| 7 | Bijuli Kalita Medhi · Guwahati | 96% | 59% | 12 | 46 |
| 8 | Pradyut Bordoloi · Nowgong | 99% | 71% | 13 | 44 |
| 9 | Gaurav Gogoi · Jorhat | 75% | 33% | 47 | 39 |
| 10 | Phani Bhusan Choudhury · Barpeta | 60% | 31% | 4 | 38 |
| 11 | Dilip Saikia · Darrang-Udalguri | 50% | 23% | 9 | 38 |
| 12 | Shri Sarbananda Sonowal (18LS) · Dibrugarh | 64% | 19% | 3 | 34 |
Source: MoSPI eSAKSHI (eSAKSHI API (mplads.mospi.gov.in)). Fund utilisation = works recommended ÷ allocated limit (MoSPI’s definition); spent = vendor payments ÷ allocated limit; completion = completed ÷ recommended works. The MP score weighs completion, spending efficiency, utilisation, proof of work, spending and vendor diversity. How it’s calculated.