Skip to content
MPLADSTracker

MPLADS report card · 18th Lok Sabha

Smt Supriya Sadanand Sule

Lok SabhaNCP(SP)Baramati · Maharashtra

MP score43/100428th of 542 in the 18th Lok Sabha
32nd of 48 from Maharashtra
Also an MP in the 17th Lok Sabha Then: 99% utilisation, 66 works completed, score 80.
  • Works waiting for sanction

    84 recommended works are still awaiting sanction more than 45 days later. Sanction is the district authority’s responsibility.

Allocated limit

₹14.70 Cr

Median ₹14.70 Cr

Fund utilisation

68%

₹10.00 Cr recommended · 138 works
Below median (76%)

Paid to vendors

₹3.00 Cr

20% of allocation
Below median (37%)

Works completed

10

7.2% of recommended
Below median (28%)

From recommendation to completion

Every work this MP recommended, by stage

  1. Recommended by the MP138 works

    ₹10.00 Cr · 68% of the ₹14.70 Cr allocated

  2. Sanctioned by the district42 works

    30% sanctioned · took 12.6 months on average (due within 45 days)

  3. Completed10 works

    ₹77.4 L final cost · 8.6 months from recommendation on average

96 works are still awaiting sanction, 84 of them for more than 45 days.

In plain words

What the numbers say

  • Recommended 138 works worth ₹10.00 Cr, a fund utilisation of 68%, higher than 37% of 18th Lok Sabha MPs.
  • The district has sanctioned 42 of them, taking 12.6 months on average.
  • ₹3.00 Cr has been paid to vendors, 20% of the allocation.
  • 10 works are complete, typically 8.6 months after recommendation. 9 works have geo-tagged photos on eSAKSHI.
  • The largest share of funds went to Roads & bridges.
  • Payments went to 32 vendors. The largest received 8.3%.
  • No citizen ratings have been reported for completed works.

How the score is made

MP score 43/100: finishing works counts most

  1. Works completed 30%7Completed ÷ recommended works.
  2. Spending efficiency 20%26Value of completed works ÷ money paid out. Money paid without works finished scores low.
  3. Fund utilisation 15%68Value of works recommended ÷ allocated limit (MoSPI’s measure).
  4. Proof of work 15%90Share of completed works with photos or documents uploaded on eSAKSHI.
  5. Funds spent 10%20Paid to vendors ÷ allocated limit.
  6. Vendor diversity 10%
    i

    Members of Parliament (MPs) do not have direct, operational control over the specific vendors selected for government public works. However, they exert significant indirect influence by shaping procurement frameworks, passing supplier diversity laws, and conducting oversight.

    100
    How spread out payments are: full marks when no vendor gets over 20% of the money, none when one vendor gets everything.

Largest vendor: MAYUR GANPAT UBHE, 8.3% of payments across 32 vendors.

District sanction speed

20/100 · sanction is the district authority’s job, so this doesn’t change the MP’s rank

  1. Sanction speed 100%20Average days to sanction (full marks within the 45-day guideline, none at a year), and the share of works not overdue.

Activity over time

Recommendations, payments and completions by month

Value of works MPs recommended each month

Who got paid

Top vendors by payments received

Implementing district authorities

The districts that sanction and execute this MP’s works

Works

138 works · the 60 most recent are listed here, all of them in the explorer · tap “Photos” to see geo-tagged photos from eSAKSHI

Open in explorer
  • Construction of ST Pickup Shade at Kund

    Community buildings & public spacesConstruction of bus-sheds or bus-stops· Pune· #183597

    ₹2.0 L Physical Inspection · 23 Oct 2026Rec. 18 Mar 2025Paid ₹1.9 L
  • Construction of interna concrete road from Choraghe House to Dattatray Dhumal House, Jeur

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Pune· #185182

    ₹5.0 L Sanctioned · 23 Oct 2026Rec. 21 Mar 2025
  • Construction of Common Covered Sitting Area at Hole Vasti, Baburdi

    Community buildings & public spacesConstruction of common work sheds / common covered sitting area· Pune· #323058

    ₹5.0 L Awaiting sanction · 16 daysRec. 16 Oct 2026
  • Construction of Common Covered Sitting Area at Rasalwadi, Deulgaon Rasal

    Community buildings & public spacesConstruction of common work sheds / common covered sitting area· Pune· #323060

    ₹10.0 L Awaiting sanction · 16 daysRec. 16 Oct 2026
  • Installation of Filter Plant at Sawal

    Drinking waterInstalling community drinking water plants· Pune· #323061

    ₹4.0 L Awaiting sanction · 16 daysRec. 16 Oct 2026
  • Construction of Road near Shankar Rithe House at Dalit Vasti, Moralwadi

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Pune· #323062

    ₹6.0 L Awaiting sanction · 16 daysRec. 16 Oct 2026
  • Installation of a solar high-mast light near the cremation ground at Vaki

    Electricity & lightingLighting of public spaces· Pune· #323068

    ₹3.0 L Awaiting sanction · 16 daysRec. 16 Oct 2026
  • Construction of internal road in front of Sharayu Showroom towards Medad Gaon

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Pune· #323074

    ₹10.0 L Awaiting sanction · 16 daysRec. 16 Oct 2026
  • Construction of Boundary wall to Community Hall at Ghadagewadi Road, Bhosale Vasti at Nirawagaj

    Community buildings & public spacesConstruction of boundary walls of existing public and community buildings· Pune· #323092

    ₹10.0 L Awaiting sanction · 16 daysRec. 16 Oct 2026
  • Construction of internal road at Shendkarwadi, Karanjepul

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Pune· #323099

    ₹10.0 L Awaiting sanction · 16 daysRec. 16 Oct 2026
  • Construction of Road from Raut Vasti Road to Anil Dasharath Dhawale House at Dhawale Mala, Khandaj

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Pune· #323102

    ₹10.0 L Awaiting sanction · 16 daysRec. 16 Oct 2026
  • Construction of Common Covered Sitting Area at Grampanchayat Place, Nepat Valan

    Community buildings & public spacesConstruction of common work sheds / common covered sitting area· Pune· #323105

    ₹10.0 L Awaiting sanction · 16 daysRec. 16 Oct 2026
  • Construction of Gutter line from Sachin Nanaware Ghar to Grampanchayat Office at Murum

    Sanitation & drainageProviding drains and gutters for public drainage· Pune· #323107

    ₹7.0 L Awaiting sanction · 16 daysRec. 16 Oct 2026
  • Construction of road from Mekhali Road to Shelke Vasti, at Gunwadi

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Pune· #323109

    ₹10.0 L Awaiting sanction · 16 daysRec. 16 Oct 2026
  • Construction of Common Covered Sitting Area at Dattanagar Tengewadi, at Pasure

    Community buildings & public spacesConstruction of common work sheds / common covered sitting area· Pune· #183591

    ₹3.0 L Physical Inspection · 8 Oct 2026Rec. 18 Mar 2025Paid ₹3.0 L

18th Lok Sabha MPs from Maharashtra

Ranked by MP score

Compare
#MPUtilisationSpentCompletedScore
1Smita Uday Wagh · Jalgaon11%9.5%974
2Adv Gowaal Kagada Padavi · Nandurbar60%22%19172
3Chhatrapati Shahu Shahaji · Kolhapur100%30%3767
4Bajrang Manohar Sonwane · Beed60%26%3462
5Nitin Jairam Gadkari · Nagpur92%29%1959
6Bachhav Shobha Dinesh · Dhule70%14%1959
7Ravindra Vasantrao Chavan · Nanded85%39%3458
8Murlidhar Mohol · Pune100%13%1258
9Bhumare Sandipanrao Asaram · Aurangabad87%37%2957
10Anup Sanjay Dhotre · Akola67%42%4157
11Aashtikar Patil Nagesh Bapurao · Hingoli73%38%3857
12Sanjay Haribhau Jadhav · Parbhani55%30%2857

Source: MoSPI eSAKSHI (eSAKSHI API (mplads.mospi.gov.in)). Fund utilisation = works recommended ÷ allocated limit (MoSPI’s definition); spent = vendor payments ÷ allocated limit; completion = completed ÷ recommended works. The MP score weighs completion, spending efficiency, utilisation, proof of work, spending and vendor diversity. How it’s calculated.