Skip to content
MPLADSTracker

MPLADS report card · 18th Lok Sabha

Shrimant Chh Udayanraje Pratapsinhamaharaj Bhonsle

Lok SabhaBJPSatara · Maharashtra

MP score49/100378th of 542 in the 18th Lok Sabha
28th of 48 from Maharashtra

Allocated limit

₹14.70 Cr

Median ₹14.70 Cr

Fund utilisation

66%

₹9.70 Cr recommended · 134 works
Below median (76%)

Paid to vendors

₹1.90 Cr

13% of allocation
Below median (37%)

Works completed

19

14% of recommended
Below median (28%)

From recommendation to completion

Every work this MP recommended, by stage

  1. Recommended by the MP134 works

    ₹9.70 Cr · 66% of the ₹14.70 Cr allocated

  2. Sanctioned by the district127 works

    95% sanctioned · took 2.8 months on average (due within 45 days)

  3. Completed19 works

    ₹1.39 Cr final cost · 14.2 months from recommendation on average

7 works are still awaiting sanction, 7 of them for more than 45 days.

In plain words

What the numbers say

  • Recommended 134 works worth ₹9.70 Cr, a fund utilisation of 66%, higher than 33% of 18th Lok Sabha MPs.
  • The district has sanctioned 127 of them, taking 2.8 months on average.
  • ₹1.90 Cr has been paid to vendors, 13% of the allocation.
  • 19 works are complete, typically 14.2 months after recommendation. 11 works have geo-tagged photos on eSAKSHI.
  • The largest share of funds went to Roads & bridges.
  • Payments went to 25 vendors. The largest received 7.8%.
  • No citizen ratings have been reported for completed works.

How the score is made

MP score 49/100: finishing works counts most

  1. Works completed 30%14Completed ÷ recommended works.
  2. Spending efficiency 20%73Value of completed works ÷ money paid out. Money paid without works finished scores low.
  3. Fund utilisation 15%66Value of works recommended ÷ allocated limit (MoSPI’s measure).
  4. Proof of work 15%58Share of completed works with photos or documents uploaded on eSAKSHI.
  5. Funds spent 10%13Paid to vendors ÷ allocated limit.
  6. Vendor diversity 10%
    i

    Members of Parliament (MPs) do not have direct, operational control over the specific vendors selected for government public works. However, they exert significant indirect influence by shaping procurement frameworks, passing supplier diversity laws, and conducting oversight.

    100
    How spread out payments are: full marks when no vendor gets over 20% of the money, none when one vendor gets everything.

Largest vendor: Swapnil Raghunath Thorat, 7.8% of payments across 25 vendors.

District sanction speed

91/100 · sanction is the district authority’s job, so this doesn’t change the MP’s rank

  1. Sanction speed 100%91Average days to sanction (full marks within the 45-day guideline, none at a year), and the share of works not overdue.

Activity over time

Recommendations, payments and completions by month

Value of works MPs recommended each month

Who got paid

Top vendors by payments received

Implementing district authorities

The districts that sanction and execute this MP’s works

Works

134 works · the 60 most recent are listed here, all of them in the explorer · tap “Photos” to see geo-tagged photos from eSAKSHI

Open in explorer
  • Creation of Crematiorium and Smashanbhumi Dahini at Malkhed

    Community buildings & public spacesCrematoriums / Energy efficient crematoriums or structures on burial / cremation ground· Satara· #148513

    ₹9.9 L Completed 25 Sept 2026Rec. 2 Jan 2025Paid ₹9.9 L
  • Creation of Internal road towards Shinde vasti at Gharewadi under Grampanchyat Vyajwadi

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Satara· #253972

    ₹10.0 L Sanctioned · 21 Sept 2026Rec. 15 Dec 2025
  • Construction of Community hall at Village Shendre

    Community buildings & public spacesConstruction of community centers and community halls· Satara· #253630

    ₹9.0 L Sanctioned · 16 Sept 2026Rec. 15 Dec 2025
  • Construction or creation of road with drainage at Village Varye

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Satara· #253823

    ₹4.0 L Completed 4 Sept 2026Rec. 15 Dec 2025Paid ₹4.0 L
  • Creation of concrete road from house of Prashant Deshmukh to House of Yuvraj Phadtare

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Satara· #253828

    ₹5.0 L Completed 3 Sept 2026Rec. 15 Dec 2025Paid ₹5.0 L
  • Construction of concrete road at Andharwadi.

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Satara· #148477

    ₹6.9 L Completed 17 Aug 2026Rec. 2 Jan 2025Paid ₹6.9 L
  • Provision of RCC Drain at Sabalwadi

    Sanitation & drainageProviding drains and gutters for public drainage· Satara· #148572

    ₹4.9 L Completed 12 Aug 2026Rec. 2 Jan 2025Paid ₹4.9 L
  • Construction of Road and Closed drainage Behind Vitthal Ward Mandir

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Satara· #148457

    ₹10.0 L Completed 11 Aug 2026Rec. 2 Jan 2025Paid ₹10.0 L
  • Construction of Closed drain at Hirai Garden at Shiwade

    Sanitation & drainageProviding drains and gutters for public drainage· Satara· #148480

    ₹6.9 L Completed 11 Aug 2026Rec. 2 Jan 2025Paid ₹6.9 L
  • Construction of Community hall for Cultural activities at Village Dabewadi

    Community buildings & public spacesConstruction of buildings for community cultural activities· Satara· #253631

    ₹9.0 L Sanctioned · 7 Aug 2026Rec. 15 Dec 2025
  • Fencing of Grampanchyat owned open plot at Village Kari

    Sports & fitnessDevelopment of playfields and sports grounds· Satara· #253826

    ₹9.0 L Sanctioned · 7 Aug 2026Rec. 15 Dec 2025
  • Creation of Shade over Cremation ground at Nahimbe Nathachi Pag under Village Chiteghar

    Community buildings & public spacesCrematoriums / Energy efficient crematoriums or structures on burial / cremation ground· Satara· #253965

    ₹5.0 L Sanctioned · 7 Aug 2026Rec. 15 Dec 2025
  • Construction of tar road (bitumen) from house of Shri Ashok Chavan to Shri Dattatray Ganpat house.

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Satara· #257689

    ₹7.0 L Sanctioned · 7 Aug 2026Rec. 6 Jan 2026
  • Construction of Internal Road at Village Renavale

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Satara· #254602

    ₹5.0 L Completed 6 Aug 2026Rec. 17 Dec 2025Paid ₹5.0 L
  • Creation of Internal concrete road from house of Prakash Sahebrao Pawar to House of Dinkar Popale.

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Satara· #253976

    ₹8.0 L Sanctioned · 28 Jul 2026Rec. 15 Dec 2025

18th Lok Sabha MPs from Maharashtra

Ranked by MP score

Compare
#MPUtilisationSpentCompletedScore
1Smita Uday Wagh · Jalgaon11%9.5%974
2Adv Gowaal Kagada Padavi · Nandurbar60%22%19172
3Chhatrapati Shahu Shahaji · Kolhapur100%30%3767
4Bajrang Manohar Sonwane · Beed60%26%3462
5Nitin Jairam Gadkari · Nagpur92%29%1959
6Bachhav Shobha Dinesh · Dhule70%14%1959
7Ravindra Vasantrao Chavan · Nanded85%39%3458
8Murlidhar Mohol · Pune100%13%1258
9Bhumare Sandipanrao Asaram · Aurangabad87%37%2957
10Anup Sanjay Dhotre · Akola67%42%4157
11Aashtikar Patil Nagesh Bapurao · Hingoli73%38%3857
12Sanjay Haribhau Jadhav · Parbhani55%30%2857

Source: MoSPI eSAKSHI (eSAKSHI API (mplads.mospi.gov.in)). Fund utilisation = works recommended ÷ allocated limit (MoSPI’s definition); spent = vendor payments ÷ allocated limit; completion = completed ÷ recommended works. The MP score weighs completion, spending efficiency, utilisation, proof of work, spending and vendor diversity. How it’s calculated.