Skip to content
MPLADSTracker
This is a record from the 17th Lok Sabha (2019–24). eSAKSHI covers its final year only, from April 2023. Comparisons are with other 17th Lok Sabha MPs.

MPLADS report card · 17th Lok Sabha

Nityanand Rai

Lok SabhaUjjarpur · Bihar

MP score85/100264th of 539 in the 17th Lok Sabha
25th of 40 from Bihar
Re-elected to the 18th Lok Sabha Then: 66% utilisation, 42 works completed, score 49.
  • Payments concentrated with one vendor

    71% of vendor payments went to DARVESHWAR NATH CONSTRUCTION.

Allocated limit

₹9.81 Cr

Median ₹8.60 Cr

Fund utilisation

98%

₹9.58 Cr recommended · 320 works
About the median

Paid to vendors

₹9.58 Cr

98% of allocation
Above median (88%)

Works completed

320

100% of recommended
Above median (83%)

From recommendation to completion

Every work this MP recommended, by stage

  1. Recommended by the MP320 works

    ₹9.58 Cr · 98% of the ₹9.81 Cr allocated

  2. Sanctioned by the district320 works

    100% sanctioned · took 4.6 months on average (due within 45 days)

  3. Completed320 works

    ₹9.58 Cr final cost · 9.5 months from recommendation on average

In plain words

What the numbers say

  • Recommended 320 works worth ₹9.58 Cr, a fund utilisation of 98%, higher than 47% of 17th Lok Sabha MPs.
  • The district has sanctioned 320 of them, taking 4.6 months on average.
  • ₹9.58 Cr has been paid to vendors, 98% of the allocation.
  • 320 works are complete, typically 9.5 months after recommendation. 156 works have geo-tagged photos on eSAKSHI.
  • The largest share of funds went to Drinking water.
  • Payments went to 40 vendors. The largest received 71%.
  • No citizen ratings have been reported for completed works.

How the score is made

MP score 85/100: finishing works counts most

  1. Works completed 30%100Completed ÷ recommended works.
  2. Spending efficiency 20%100Value of completed works ÷ money paid out. Money paid without works finished scores low.
  3. Fund utilisation 15%98Value of works recommended ÷ allocated limit (MoSPI’s measure).
  4. Proof of work 15%49Share of completed works with photos or documents uploaded on eSAKSHI.
  5. Funds spent 10%98Paid to vendors ÷ allocated limit.
  6. Vendor diversity 10%
    i

    Members of Parliament (MPs) do not have direct, operational control over the specific vendors selected for government public works. However, they exert significant indirect influence by shaping procurement frameworks, passing supplier diversity laws, and conducting oversight.

    36
    How spread out payments are: full marks when no vendor gets over 20% of the money, none when one vendor gets everything.

Largest vendor: DARVESHWAR NATH CONSTRUCTION, 71% of payments across 40 vendors.

District sanction speed

85/100 · sanction is the district authority’s job, so this doesn’t change the MP’s rank

  1. Sanction speed 100%85Average days to sanction (full marks within the 45-day guideline, none at a year), and the share of works not overdue.

Activity over time

Recommendations, payments and completions by month

Value of works MPs recommended each month

Sectors

Value of works by category

  1. Drinking water320₹9.58 Cr

Who got paid

Top vendors by payments received

Implementing district authorities

The districts that sanction and execute this MP’s works

Works

320 works · the 60 most recent are listed here, all of them in the explorer · tap “Photos” to see geo-tagged photos from eSAKSHI

Open in explorer
  • PRAKHAND MOHANPUR PANCHAYAT DUMRI DAKSHIN KE UTKRAMIT MADHAY VIDHALAY CHAPRA ME TUBEWELL WA BORE WELL SAH PANI TANKI KA NIRMAN KARYA KI AWASHESH RASHI KA BHUGTAN HETU ANUSHANSA

    Drinking waterInstalling community drinking water plants· Samastipur· #101808

    ₹1.2 L Completed 16 Jan 2026Rec. 9 Feb 2024Paid ₹1.2 L
  • PRAKHAND MOHANPUR PANCHAYAT DHARNIPATTI PASHCHIM KE UTKRAMIT MADHAYMIK VIDHALAY DHARNIPATTI ME TUBEWELL WA BORE WELL SAH PANI TANKI KA NIRMAN KARYA KI AWASHESH RASHI KA BHUGTAN HETU ANUSHANSA

    Drinking waterInstalling community drinking water plants· Samastipur· #101814

    ₹1.2 L Completed 13 Jan 2026Rec. 9 Feb 2024Paid ₹1.2 L
  • PRAKHAND MOHIUDDINAGAR PANCHAYAT SIVAISINGPUR KE UTKRAMIT MADHAY VIDHALAY SIVAISINGPUR ME TUBEWELL WA BORE WELL SAH PANI TANKI KA NIRMAN KARYA KI AWASHESH RASHI KA BHUGTAN HETU ANUSHANSA

    Drinking waterInstalling community drinking water plants· Samastipur· #100759

    ₹93,727 Completed 12 Jan 2026Rec. 9 Feb 2024Paid ₹93,727
  • PRAKHAND MORVA PANCHAYAT NIKASPUR KE RAJAYKIYE UTKRAMIT MADHAY VIDHALAY AMRITPUR ME TUBEWELL WA BORE WELL SAH PANI TANKI KA NIRMAN KARYA KI AWASHESH RASHI KA BHUGTAN HETU ANUSHANSA

    Drinking waterInstalling community drinking water plants· Samastipur· #101438

    ₹1.2 L Completed 10 Jan 2026Rec. 9 Feb 2024Paid ₹1.2 L
  • PRAKHAND MOHANPUR PANCHAYAT BAGHRA KE UCHCH MADHAYMIK VIDHALAY BAGHARA VARD NO. 06 ME TUBEWELL WA BORE WELL SAH PANI TANKI KA NIRMAN KARYA KI AWASHESH RASHI KA BHUGTAN HETU ANUSHANSA

    Drinking waterInstalling community drinking water plants· Samastipur· #101809

    ₹1.2 L Completed 10 Jan 2026Rec. 9 Feb 2024Paid ₹1.2 L
  • PRAKHAND MOHANPUR PANCHAYAT MOHANPUR KE G.M.R.D. COLLAGE MOHANPUR ME TUBEWELL WA BORE WELL SAH PANI TANKI KA NIRMAN KARYA KI AWASHESH RASHI KA BHUGTAN HETU ANUSHANSA

    Drinking waterInstalling community drinking water plants· Samastipur· #101810

    ₹1.2 L Completed 10 Jan 2026Rec. 9 Feb 2024Paid ₹1.2 L
  • PRAKHAND MOHANPUR PANCHAYAT VISHANPUR BERI KE UTKRAMIT MADHAYMIK VIDHALAY VISHANPUR BERI ME TUBEWELL WA BORE WELL SAH PANI TANKI KA NIRMAN KARYA KI AWASHESH RASHI KA BHUGTAN HETU ANUSHANSA

    Drinking waterInstalling community drinking water plants· Samastipur· #101813

    ₹1.1 L Completed 10 Jan 2026Rec. 9 Feb 2024Paid ₹1.1 L
  • PRAKHAND PATORI PANCHAYAT HASANPUR SURAT KE JIWNI UCHCH VIDHALAY HASANPUR SURAT ME TUBEWELL WA BORE WELL SAH PANI TANKI KA NIRMAN KARYA KI AWASHESH RASHI KA BHUGTAN HETU ANUSHANSA

    Drinking waterInstalling community drinking water plants· Samastipur· #101249

    ₹1.2 L Completed 24 Oct 2025Rec. 9 Feb 2024Paid ₹1.2 L
  • PRAKHAND PATORI PANCHAYAT TARA DHAMAUN KE UTKRAMIT MADHAY VIDHALAY TARA DHAMAUN ME TUBEWELL WA BORE WELL SAH PANI TANKI KA NIRMAN KARYA KI AWASHESH RASHI KA BHUGTAN HETU ANUSHANSA

    Drinking waterInstalling community drinking water plants· Samastipur· #101225

    ₹1.2 L Completed 4 Oct 2025Rec. 9 Feb 2024Paid ₹1.2 L
  • PRAKHAND MOHANPUR PANCHAYAT DUMRI DAKSHIN KE UTKRAMIT MADHAY VIDHALAYA CHAPRA ME WATER ATM KA ADHISHTHAPAN

    Drinking waterInstalling community drinking water plants· Samastipur· #74151

    ₹4.0 L Completed 26 Sept 2025Rec. 3 Jan 2024Paid ₹4.0 L
  • PRAKHAND MOHANPUR PANCHAYAT MOHANPUR KE G.M.R.D.COLLAGE MOHANPUR ME WATER ATM KA ADHISHTHAPAN

    Drinking waterInstalling community drinking water plants· Samastipur· #74159

    ₹4.0 L Completed 26 Sept 2025Rec. 3 Jan 2024Paid ₹4.0 L
  • PRAKHAND PATORI PANCHAYAT HASANPUR SURAT KE JIWNI UCHCH VIDHALAYA HASANPUR SURAT ME WATER ATM KA ADHISHTHAPAN

    Drinking waterInstalling community drinking water plants· Samastipur· #74049

    ₹4.0 L Completed 25 Sept 2025Rec. 3 Jan 2024Paid ₹4.0 L
  • PRAKHAND MOHANPUR PANCHAYAT BAGHRA KE UCHCH MADHAYMIK VIDHALAYA BAGHARA VARD NO. 06 ME WATER ATM KA ADHISHTHAPAN

    Drinking waterInstalling community drinking water plants· Samastipur· #74138

    ₹4.0 L Completed 25 Sept 2025Rec. 3 Jan 2024Paid ₹4.0 L
  • PRAKHAND VIBHUTIPUR PANCHAYAT SURAULI KE UTKRAMIT MADHAY VIDHALAYA DAMODARPUR VARD NO. 12 ME WATER ATM KA ADHISHTHAPAN

    Drinking waterInstalling community drinking water plants· Samastipur· #74461

    ₹4.0 L Completed 2 Sept 2025Rec. 3 Jan 2024Paid ₹4.0 L
  • PRAKHAND VIBHUTIPUR PANCHAYAT KALYANPUR DAKSHIN KE RAJYKIY MADHAY VIDHALAYA SMATHA VARD NO. 14 ME WATER ATM KA ADHISHTHAPAN

    Drinking waterInstalling community drinking water plants· Samastipur· #74505

    ₹4.0 L Completed 2 Sept 2025Rec. 3 Jan 2024Paid ₹4.0 L

17th Lok Sabha MPs from Bihar

Ranked by MP score

#MPUtilisationSpentCompletedScore
1Smt Kavita Singh · Siwan99%99%10998
2Ajay Nishad · Muzaffarpur97%97%7398
3Shri Prince Raj · Samastipur99%99%9097
4Mahabali Singh · Karakat99%99%10697
5Alok Kumar Suman · Gopalganj100%100%10497
6Smt Veena Devi · Vaishali96%96%7697
7Kaushalendra Kumar · Nalanda85%84%28796
8Ravi Shankar Prasad · Patna Sahib88%87%19896
9Giriraj Singh · Begusarai94%93%7194
10Shri Janardan Singh Sigriwal · Maharajganj93%89%9894
11Chhedi Paswan · Sasaram97%97%8594
12Chaudhary Mehboob Ali Kaiser · Khagaria97%96%15993

Source: MoSPI eSAKSHI (eSAKSHI API (mplads.mospi.gov.in)). Fund utilisation = works recommended ÷ allocated limit (MoSPI’s definition); spent = vendor payments ÷ allocated limit; completion = completed ÷ recommended works. The MP score weighs completion, spending efficiency, utilisation, proof of work, spending and vendor diversity. How it’s calculated.