MPLADS report card · 18th Lok Sabha
Dhanorkar Pratibha Suresh Alias Balubhau
Lok Sabha
INCChandrapur · Maharashtra
36th of 48 from Maharashtra
Works waiting for sanction
68 recommended works are still awaiting sanction more than 45 days later. Sanction is the district authority’s responsibility.
Allocated limit
₹14.70 Cr
Median ₹14.70 Cr
Fund utilisation
76%
₹11.14 Cr recommended · 88 works
About the median
Paid to vendors
₹2.12 Cr
14% of allocation
Below median (37%)
Works completed
7
8.0% of recommended
Below median (28%)
From recommendation to completion
Every work this MP recommended, by stage
- Recommended by the MP88 works
₹11.14 Cr · 76% of the ₹14.70 Cr allocated
- Sanctioned by the district20 works
23% sanctioned · took 13.4 months on average (due within 45 days)
- Completed7 works
₹78.3 L final cost · 10.1 months from recommendation on average
68 works are still awaiting sanction, 68 of them for more than 45 days.
In plain words
What the numbers say
- Recommended 88 works worth ₹11.14 Cr, a fund utilisation of 76%, higher than 50% of 18th Lok Sabha MPs.
- The district has sanctioned 20 of them, taking 13.4 months on average.
- ₹2.12 Cr has been paid to vendors, 14% of the allocation.
- 7 works are complete, typically 10.1 months after recommendation. 2 works have geo-tagged photos on eSAKSHI.
- The largest share of funds went to Roads & bridges.
- Payments went to 17 vendors. The largest received 16%.
- No citizen ratings have been reported for completed works.
How the score is made
MP score 37/100: finishing works counts most
- Works completed 30%8Completed ÷ recommended works.
- Spending efficiency 20%37Value of completed works ÷ money paid out. Money paid without works finished scores low.
- Fund utilisation 15%76Value of works recommended ÷ allocated limit (MoSPI’s measure).
- Proof of work 15%29Share of completed works with photos or documents uploaded on eSAKSHI.
- Funds spent 10%14Paid to vendors ÷ allocated limit.
- Vendor diversity 10%100How spread out payments are: full marks when no vendor gets over 20% of the money, none when one vendor gets everything.
i
Members of Parliament (MPs) do not have direct, operational control over the specific vendors selected for government public works. However, they exert significant indirect influence by shaping procurement frameworks, passing supplier diversity laws, and conducting oversight.
Largest vendor: NUTAN KAMGAR SAHAKARI SANSTHA, 16% of payments across 17 vendors.
District sanction speed
11/100 · sanction is the district authority’s job, so this doesn’t change the MP’s rank
- Sanction speed 100%11Average days to sanction (full marks within the 45-day guideline, none at a year), and the share of works not overdue.
Activity over time
Recommendations, payments and completions by month
Sectors
Value of works by category
Who got paid
Top vendors by payments received
Implementing district authorities
The districts that sanction and execute this MP’s works
Works
88 works · the 60 most recent are listed here, all of them in the explorer · tap “Photos” to see geo-tagged photos from eSAKSHI
Construction of cement road from Ashok Rambhau Shendes house to Bhanarkar to Raghunath Mohurle house in Sonbardi Taluka Kelapur
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Yavatmal· #246108
₹10.0 L Physical Inspection · 29 Oct 2026Rec. 4 Nov 2025Beautification of the Annabhau Sathe statue area in Mouja Jivati, Taluka Jivati.
Community buildings & public spacesDevelopment of public parks· Chandrapur· #183796
₹10.0 L Physical Inspection · 30 Sept 2026Rec. 20 Mar 2025Paid ₹9.3 LConstruction of underground drain to house of Badal Jadhav to Vinod Rathod at Mauja Borgaon(Da.), Taluka Arni.
Sanitation & drainageProviding drains and gutters for public drainage· Yavatmal· #246104
₹5.0 L Physical Inspection · 23 Sept 2026Rec. 4 Nov 2025Paid ₹4.9 LInstallation of high mast light near the house of Mr. Sachin Nimbalkar in Balaji Ward, Chandrapur. and Installation of high mast light at Jail Road, near Sacate Temple, Chandrapur.
Electricity & lightingStreet lights· Chandrapur· #147528
₹10.0 L Physical Inspection · 9 Sept 2026Rec. 15 Oct 2024Paid ₹8.5 LRoad Construction of cement concrete road from the house of Mr. Sudhakar Gedam to the house of Mrs. Vaishali Pendor at Borkar Borda Dixit Gangapur, Grama Pratham in Pombhurna Taluka.
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Chandrapur· #303471
₹10.0 L Awaiting sanction · 57 daysRec. 5 Sep 2026Construction of cement concrete road from the house of Mr. Sanjay Devgade to the house of Machhindra Tawade at Borkar Borda Dixit Gangapur, Gram Panchayat, Pombhurna Taluka.
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Chandrapur· #303472
₹10.0 L Awaiting sanction · 57 daysRec. 5 Sep 2026Construction of cement concrete road from the house of Shri. Vasudev Kumre to the weekly market at Gram Panchayat Chintaldhaba No. 1 in Pombhurna taluka.
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Chandrapur· #303473
₹10.0 L Awaiting sanction · 57 daysRec. 5 Sep 2026Construction of cement concrete road from Pundalik Gurnule's house to Chinna Kannake's house at Dongarhaldi Mal in Pombhurna taluka.
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Chandrapur· #303477
₹10.0 L Awaiting sanction · 57 daysRec. 5 Sep 2026Construction of cement concrete road from main square to public toilet in Podsa village, Godpipri taluka. 100 m.
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Chandrapur· #312667
₹20.0 L Awaiting sanction · 57 daysRec. 5 Sep 2026Construction of cement concrete road from the house of Mr. Dilip Pulgamkar in Hiwara village, Gondpipri taluka to the house of Mr. Kushabrao Pulgamkar. 70 m.
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Chandrapur· #312674
₹7.0 L Awaiting sanction · 57 daysRec. 5 Sep 2026Construction of cement concrete road from the house of Shri. Babaji Nagapure to the house of Shri. Junga Durge in Hiwara village of Gondpipri taluka.
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Chandrapur· #312680
₹3.0 L Awaiting sanction · 57 daysRec. 5 Sep 2026Construction of cement concrete road from Mata Mandir Bhangarpeth to the main road in Bh. Talodhi (Bhangarpeth) village of Gondpipri taluka. 100 m.
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Chandrapur· #312682
₹20.0 L Awaiting sanction · 57 daysRec. 5 Sep 2026Laying of paver blocks and construction of cement concrete road from the house of Mr. Deepak Tripattiwar to the house of Mr. Maroti Chaudhary at Wadholi, Gondpipri taluka.
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Chandrapur· #312683
₹10.0 L Awaiting sanction · 57 daysRec. 5 Sep 2026Construction of cement concrete road from Ratan Durge's house to the entertainment center at Mauja Lathi in Gondpipri taluka.
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Chandrapur· #312685
₹10.0 L Awaiting sanction · 57 daysRec. 5 Sep 2026Construction of cement concrete road from the entrance to Sanjay Bodhane house in Vanoja Taluka Warora.
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Chandrapur· #183826
₹20.0 L Physical Inspection · 2 Sept 2026Rec. 20 Mar 2025Paid ₹19.8 L
18th Lok Sabha MPs from Maharashtra
Ranked by MP score
| # | MP | Utilisation | Spent | Completed | Score |
|---|---|---|---|---|---|
| 1 | Smita Uday Wagh · Jalgaon | 11% | 9.5% | 9 | 74 |
| 2 | Adv Gowaal Kagada Padavi · Nandurbar | 60% | 22% | 191 | 72 |
| 3 | Chhatrapati Shahu Shahaji · Kolhapur | 100% | 30% | 37 | 67 |
| 4 | Bajrang Manohar Sonwane · Beed | 60% | 26% | 34 | 62 |
| 5 | Nitin Jairam Gadkari · Nagpur | 92% | 29% | 19 | 59 |
| 6 | Bachhav Shobha Dinesh · Dhule | 70% | 14% | 19 | 59 |
| 7 | Ravindra Vasantrao Chavan · Nanded | 85% | 39% | 34 | 58 |
| 8 | Murlidhar Mohol · Pune | 100% | 13% | 12 | 58 |
| 9 | Bhumare Sandipanrao Asaram · Aurangabad | 87% | 37% | 29 | 57 |
| 10 | Anup Sanjay Dhotre · Akola | 67% | 42% | 41 | 57 |
| 11 | Aashtikar Patil Nagesh Bapurao · Hingoli | 73% | 38% | 38 | 57 |
| 12 | Sanjay Haribhau Jadhav · Parbhani | 55% | 30% | 28 | 57 |
Source: MoSPI eSAKSHI (eSAKSHI API (mplads.mospi.gov.in)). Fund utilisation = works recommended ÷ allocated limit (MoSPI’s definition); spent = vendor payments ÷ allocated limit; completion = completed ÷ recommended works. The MP score weighs completion, spending efficiency, utilisation, proof of work, spending and vendor diversity. How it’s calculated.